Second Notice BLD | 8/11/2008 | 8/11/2008 | 8/12/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/15/2008 | 8/11/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/11/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/15/2008 | | |
Cathy Weisshaupt
|
|
|
|
Permanent Occupancy | | | 5/15/2008 | | DONE |
|
|
|
|
BLD-Final | 5/12/2008 | 5/14/2008 | 5/14/2008 | A | PASS |
Mike Jordan
|
|
|
309-Cheynne ###-####. Please call prior to insp.,, verify occ. # signs,, room #1=62,, room#2=41,, lobby=32. Verified occ. load signs. Ok for perm occ.
|
BLD-Final | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PART |
Tony Young
|
|
|
309-Cheynne ###-####. Please call prior to insp. T Cof O ok,, need occupant load signs, and verify zoning,, all else ok... rescheduled for Wed am
|
BLD-Final | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | CANC |
Mike Jordan
|
|
|
309-cheynne Phone #: ###-####. Rescheduled for Monday in am.
|
Telephone call | | | 5/7/2008 | | DONE |
|
|
|
Discussed situation with Jenifer Gilliland and as instructed, called Cheyne Weston, (###-####) advised him that a CO hasn't been issued and explained what needs to be resolved and who he needs to contact. Scheduled to meet at 1:30 to obtain a TCO, since Fire and Building have passed life safety issues.
|
CHANGE STATUS TO (ISS) | | | 4/24/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | A | FAIL |
Troy James
|
|
|
need public works, zoning, and achd final approval 4/22/2005 12:26:28 PM
|
BLD-Aging Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 | | CANC |
Troy James
|
|
|
wip 3/30/2005 10:15:58 AM
|
(F) Reprint permit | | | 1/26/2005 | | DONE |
|
|
|
|
BLD-Energy code compliance | 11/1/2004 | 11/1/2004 | 11/1/2004 | P | PASS |
Troy James
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 10/21/2004 | 10/22/2004 | 10/22/2004 | P | CANC |
Troy James
|
|
|
dave collins; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 10/22/2004 | 10/22/2004 | 10/22/2004 | P | PASS |
Troy James
|
|
|
ok to insulate
|
BLD-Final | 10/20/2004 | 10/21/2004 | 10/21/2004 | A | FAIL |
Troy James
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
left c/n with contractor 10/21/2004 10:16:29 AM
|
BLD-Conference | 10/19/2004 | 10/19/2004 | 10/19/2004 | A | DONE |
Troy James
|
|
|
solving issues with the water lines over non insulated area.
|
BLD-Conference | 10/14/2004 | 10/15/2004 | 10/15/2004 | A | DONE |
Troy James
|
|
|
met with gary z. to discuss issues of pipe freezing, informed contractor to install ventilation at front patio area overhang 10/15/2004 9:49:39 AM
|
BLD-Conference | 10/13/2004 | 10/14/2004 | 10/14/2004 | P | CANC |
Troy James
|
|
|
troy can you make this gz 7949379 900 am
|
BLD-Conference | 10/13/2004 | 10/14/2004 | 10/14/2004 | P | CANC |
Gary Ziegler
|
|
|
troy can you make this gz 7949379 900 am
|
BLD-Conference | 10/13/2004 | 10/14/2004 | 10/14/2004 | A | CANC |
Troy James
|
|
|
|
BLD-Foundation | 10/4/2004 | 10/5/2004 | 10/5/2004 | A | CANC |
Troy James
|
|
|
dave==shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Other | 10/5/2004 | 10/5/2004 | 10/5/2004 | A | PASS |
Troy James
|
|
|
shear on walls and roof ok, engineer stamped letter stating H clips not needed at roof sheathing. 10/5/2004 9:50:11 AM
|
BLD-Framing/Rough-in | 9/21/2004 | 9/22/2004 | 9/22/2004 | P | FAIL |
Troy James
|
|
|
shear wall inspection please///dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walls ok need to install H clips at roof sheathing or ok from engineer. 9/22/2004 4:07:11 PM
|
BLD-Aging Inspection | 9/14/2004 | 9/14/2004 | 9/14/2004 | | PART |
Troy James
|
|
|
wip 9/14/2004 10:45:33 AM
|
BLD-Footing | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/15/2004 at 7:23:09 AM. Contact: ###-####.
|
BLD-Foundation | 7/12/2004 | 7/12/2004 | 7/12/2004 | P | PASS |
Troy James
|
|
|
mark guho; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Concrete | 7/8/2004 | 7/9/2004 | 7/9/2004 | P | FAIL |
Troy James
|
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Need to install form work and rebar for interior footing. 7/9/2004 3:02:45 PM
|
BLD-Footing | 7/1/2004 | 7/2/2004 | 7/2/2004 | P | PASS |
Troy James
|
|
|
|
BLD-Foundation | 7/1/2004 | 7/1/2004 | 7/1/2004 | P | CANC |
Troy James
|
|
|
mark; please late as possible - Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
(F) Reprint permit | | | 6/29/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2004 | | DONE |
|
|
|
|
Telephone call | | | 4/8/2004 | | DONE |
|
|
|
left mess for steve pavlick that permit is ready & need achd
|
Routing - PLANNING | 3/8/2004 | | 3/10/2004 | | PASS |
|
|
|
Conditionally approved.
1. Terry Records indicated that no hillside permit is required.
2. No issuance of permits until drainage and floodway plan receives final approval from Public Works.
|
Routing - PLAN CHECK | 3/10/2004 | | 3/10/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2004 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/10/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/10/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/10/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/10/2004 | | DONE |
|
|
|
spoke with Mark -- permit is ready.
|
Plan assigned to (JCM) | 7/10/2003 | | 3/10/2004 | | PASS |
John Menard
|
|
|
3/10/2004 14:24:04 JCM - activity updated through activity BLDA022 from case BLD03-01644.
|
Routing - PUBLIC WORKS | 3/4/2004 | | 3/5/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/2/2004 | | 3/4/2004 | | |
|
|
|
|
Routing - FIRE | 2/27/2004 | | 3/2/2004 | | PASS |
|
|
|
Resubmittal acceptable
|
Routing - PUBLIC WORKS | 2/26/2004 | | 2/27/2004 | | FAIL |
|
|
|
Requires drainage plan per Brian M. kmm
|
Routing - PLAN CHECK | 2/24/2004 | | 2/26/2004 | | |
|
|
|
|
Plan resubmittals received | | | 2/25/2004 | | DONE |
|
|
|
Received three copies of C-1.0, routed to John M. kmm
|
Plan resubmittals received | | | 2/24/2004 | | DONE |
|
|
|
Received response letter, two page copy of a e-mail, two sheets of A2.1 taken to John M.
|
Routing - PLAN CHECK | 2/20/2004 | | 2/23/2004 | | |
|
|
|
|
(F) Reprint permit | | | 2/20/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/20/2004 | | DONE |
|
|
|
|
Routing - FIRE | 2/13/2004 | | 2/19/2004 | | FAIL |
|
|
|
No response provided to Fire comments. Phoned architect, discussed plan review comments with Steve Pavlick. He will get required information and resubmit.
|
Routing - PLAN CHECK | 12/5/2003 | | 2/13/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/2/2004 | | PASS |
|
|
|
Reviewed and approved resubmittals including, nonstructural, structural and energy resubmittals. JCM
|
Plan resubmittals received | | | 1/27/2004 | | DONE |
|
|
|
Received two copies of revised sheets EC, A3.1, A4.1, A5.1, A7.1, A8.1, A10.1, A10.,2, P1.0, P2.0, E1,0, E2.0, one copy of response letter, two copies of Geotec letter report and two copies of supplemental structural calculations. Routed to John M. kmm
|
Plan Review Completed(1st rev) | | | 12/4/2003 | | DONE |
|
|
|
Plans failed. Resubmittal required.
|
Routing - FIRE | 12/3/2003 | | 12/4/2003 | | DONE |
|
|
|
Plans failed. Resubmittal required
|
Routing - PLAN CHECK | 12/2/2003 | | 12/3/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 12/3/2003 | | |
|
|
|
Mailed the architect a copy of the plan review comment list and a copy of the energy review list requesting revisions for both. JCM
|
Plan resubmittals requested | | | 12/2/2003 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 11/25/2003 | | 11/28/2003 | | FAIL |
|
|
|
Incomplete site plan, existing sewer service line not shown per Ivan & John Johnson, Requires drainage plan per Brian M.
|
Routing - PARKS DEPARTME | 7/29/2003 | | 11/25/2003 | | |
|
|
|
Contact Mark Guho at ###-#### to let him know plan needs to go to the parks dept.
8/25/03 Contact Guho construction to let them know that they need to pickup plans and bring back to us. kmm
|
Telephone call | | | 11/7/2003 | | DONE |
|
|
|
Called Parks Dept. to see where plans are Public Works is ready for re-review. Doug called to say the plans are on hold with the parks dept. he will call Brian M.
|
Routing - PLUMBING | 7/22/2003 | | 7/22/2003 | | PASS |
|
|
|
1. vent through roof needs to be four inch to meet cross sectional area venting for four water closets. 2. building needs service sink per building code.
|
Routing - PLANNING | 7/18/2003 | | 7/22/2003 | | PEND |
|
|
|
Pending, waiting for approval from public works for drainage and Flood Plain requirements. May require a hillside permit depending on drainage per Terry R. A conditional of approval requires a hillside permit if applicable. This project was approved per CAV02-00042 and CUP02-00150.
|
Routing Off Site - STRUCTURAL | 7/10/2003 | | 7/21/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm Received a comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS GRADING | 7/14/2003 | | 7/18/2003 | | FAIL |
Rita DeYoung
|
|
|
Existing sewer service line not shown per Ivan Butterfield/John J. Requires Drainage plan per Brian M. Flood Plain requirements per Jim Wyllie. kmm
|
Routing - Erosion and Sediment | 7/18/2003 | | 7/18/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans. Individual listed as RP is not certified by Boise City.
|
Routing Off Site -Energy | 7/10/2003 | | 7/15/2003 | | FAIL |
|
|
|
Contacted Ron O. for energy review. kmm Received comment list from Ron Oltman requesting revisions. JCM
|
Routing - PLANNING Land Div | 7/10/2003 | | 7/14/2003 | | PASS |
|
|
|
Approved, site is over 5 acres in size with frontage on Sunset Peak Road.
|
Plans ACCEPTED BY PLAN TECH | | | 7/10/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/10/2003 | | PEND |
|
|
|
Requires complete civil
|
Plan routing begun/NEW & ADDTN | | | 7/10/2003 | | DONE |
|
|
|
|
Application received | | | 7/8/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/8/2003 | | DONE |
|
|
|
|
Fee Review-notes | 7/8/2003 | 7/8/2003 | | | |
|
|
|
|