Foothills Environmental Education Facility - To construct a new 3860 square foot (including unfinished future office area), one story, wood framed education and office building with concrete slab floors. This project includes the construction of a 735 square foot future office space at the north end of the building. Only the shell of this office portion will be constructed under this permit. There will be no finishes, electrical or mechanical installed in this portion of the building under this permit. A separate permit will be required to finish the office area for occupancy. This building is designed using the nonseparated use provisions of IBC Sec. 302.2.3.2. All construction per the approved plans and attached comment list. A portion of this lot is within the floodplain; however, this proposed building is not within the floodplain area. CUP02-00150/CVA02-00042/PC#393-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20088/12/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 5/15/20088/11/2008 DONE
(F) Reprint permit  7/11/2008 DONE
Print Occupancy Form  5/15/2008  
DetailsCathy Weisshaupt
Permanent Occupancy  5/15/2008 DONE
BLD-Final5/12/20085/14/20085/14/2008APASS
DetailsMike Jordan
309-Cheynne ###-####. Please call prior to insp.,, verify occ. # signs,, room #1=62,, room#2=41,, lobby=32. Verified occ. load signs. Ok for perm occ.
BLD-Final5/9/20085/12/20085/12/2008APART
DetailsTony Young
309-Cheynne ###-####. Please call prior to insp.
T Cof O ok,, need occupant load signs, and verify zoning,, all else ok... rescheduled for Wed am
BLD-Final5/8/20085/9/20085/9/2008ACANC
DetailsMike Jordan
309-cheynne Phone #: ###-####. Rescheduled for Monday in am.
Telephone call  5/7/2008 DONE
Discussed situation with Jenifer Gilliland and as instructed, called Cheyne Weston, (###-####) advised him that a CO hasn't been issued and explained what needs to be resolved and who he needs to contact. Scheduled to meet at 1:30 to obtain a TCO, since Fire and Building have passed life safety issues.
CHANGE STATUS TO (ISS)  4/24/2008 DONE
DetailsCathy Weisshaupt
FIRE-Final Inspection4/22/20054/22/20054/22/2005APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final4/22/20054/22/20054/22/2005AFAIL
DetailsTroy James
need public works, zoning, and achd final approval 4/22/2005 12:26:28 PM
BLD-Aging Inspection3/30/20053/30/20053/30/2005 CANC
DetailsTroy James
wip 3/30/2005 10:15:58 AM
(F) Reprint permit  1/26/2005 DONE
BLD-Energy code compliance11/1/200411/1/200411/1/2004PPASS
DetailsTroy James
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final10/21/200410/22/200410/22/2004PCANC
DetailsTroy James
dave collins; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in10/22/200410/22/200410/22/2004PPASS
DetailsTroy James
ok to insulate
BLD-Final10/20/200410/21/200410/21/2004AFAIL
DetailsTroy James
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
left c/n with contractor 10/21/2004 10:16:29 AM
BLD-Conference10/19/200410/19/200410/19/2004ADONE
DetailsTroy James
solving issues with the water lines over non insulated area.
BLD-Conference10/14/200410/15/200410/15/2004ADONE
DetailsTroy James
met with gary z. to discuss issues of pipe freezing, informed contractor to install ventilation at front patio area overhang 10/15/2004 9:49:39 AM
BLD-Conference10/13/200410/14/200410/14/2004PCANC
DetailsTroy James
troy can you make this gz 7949379 900 am
BLD-Conference10/13/200410/14/200410/14/2004PCANC
DetailsGary Ziegler
troy can you make this gz 7949379 900 am
BLD-Conference10/13/200410/14/200410/14/2004ACANC
DetailsTroy James
BLD-Foundation10/4/200410/5/200410/5/2004ACANC
DetailsTroy James
dave==shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Other10/5/200410/5/200410/5/2004APASS
DetailsTroy James
shear on walls and roof ok, engineer stamped letter stating H clips not needed at roof sheathing. 10/5/2004 9:50:11 AM
BLD-Framing/Rough-in9/21/20049/22/20049/22/2004PFAIL
DetailsTroy James
shear wall inspection please///dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walls ok need to install H clips at roof sheathing or ok from engineer. 9/22/2004 4:07:11 PM
BLD-Aging Inspection9/14/20049/14/20049/14/2004 PART
DetailsTroy James
wip 9/14/2004 10:45:33 AM
BLD-Footing7/15/20047/15/20047/15/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 7/15/2004 at 7:23:09 AM. Contact: ###-####.
BLD-Foundation7/12/20047/12/20047/12/2004PPASS
DetailsTroy James
mark guho; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Concrete7/8/20047/9/20047/9/2004PFAIL
DetailsTroy James
mark ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Need to install form work and rebar for interior footing. 7/9/2004 3:02:45 PM
BLD-Footing7/1/20047/2/20047/2/2004PPASS
DetailsTroy James
BLD-Foundation7/1/20047/1/20047/1/2004PCANC
DetailsTroy James
mark; please late as possible - Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
(F) Reprint permit  6/29/2004  
Issue PAID IN FULL permit  6/28/2004 DONE
Telephone call  4/8/2004 DONE
left mess for steve pavlick that permit is ready & need achd
Routing - PLANNING3/8/2004 3/10/2004 PASS
Conditionally approved.

1. Terry Records indicated that no hillside permit is required.
2. No issuance of permits until drainage and floodway plan receives final approval from Public Works.
Routing - PLAN CHECK3/10/2004 3/10/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/10/2004 PASS
Print Occupancy Form  3/10/2004 DONE
Inspection Record Card- Bld  3/10/2004 DONE
Permit Ready to Issue  3/10/2004 DONE
Telephone call  3/10/2004 DONE
spoke with Mark -- permit is ready.
Plan assigned to (JCM)7/10/2003 3/10/2004 PASS
DetailsJohn Menard
3/10/2004 14:24:04 JCM - activity updated through activity BLDA022 from case BLD03-01644.
Routing - PUBLIC WORKS3/4/2004 3/5/2004 PASS
Routing - PLAN CHECK3/2/2004 3/4/2004  
Routing - FIRE2/27/2004 3/2/2004 PASS
Resubmittal acceptable
Routing - PUBLIC WORKS2/26/2004 2/27/2004 FAIL
Requires drainage plan per Brian M. kmm
Routing - PLAN CHECK2/24/2004 2/26/2004  
Plan resubmittals received  2/25/2004 DONE
Received three copies of C-1.0, routed to John M. kmm
Plan resubmittals received  2/24/2004 DONE
Received response letter, two page copy of a e-mail, two sheets of A2.1 taken to John M.
Routing - PLAN CHECK2/20/2004 2/23/2004  
(F) Reprint permit  2/20/2004 DONE
(F) Reprint permit  2/20/2004 DONE
Routing - FIRE2/13/2004 2/19/2004 FAIL
No response provided to Fire comments. Phoned architect, discussed plan review comments with Steve Pavlick. He will get required information and resubmit.
Routing - PLAN CHECK12/5/2003 2/13/2004  
Plan Reviewer's activity  2/2/2004 PASS
Reviewed and approved resubmittals including, nonstructural, structural and energy resubmittals. JCM
Plan resubmittals received  1/27/2004 DONE
Received two copies of revised sheets EC, A3.1, A4.1, A5.1, A7.1, A8.1, A10.1, A10.,2, P1.0, P2.0, E1,0, E2.0, one copy of response letter, two copies of Geotec letter report and two copies of supplemental structural calculations. Routed to John M. kmm
Plan Review Completed(1st rev)  12/4/2003 DONE
Details
Plans failed. Resubmittal required.
Routing - FIRE12/3/2003 12/4/2003 DONE
Details
Plans failed. Resubmittal required
Routing - PLAN CHECK12/2/2003 12/3/2003 FAIL
Plan resubmittals requested  12/3/2003  
Mailed the architect a copy of the plan review comment list and a copy of the energy review list requesting revisions for both. JCM
Plan resubmittals requested  12/2/2003  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS11/25/2003 11/28/2003 FAIL
Incomplete site plan, existing sewer service line not shown per Ivan & John Johnson, Requires drainage plan per Brian M.
Routing - PARKS DEPARTME7/29/2003 11/25/2003  
Contact Mark Guho at ###-#### to let him know plan needs to go to the parks dept.
8/25/03 Contact Guho construction to let them know that they need to pickup plans and bring back to us. kmm
Telephone call  11/7/2003 DONE
Called Parks Dept. to see where plans are Public Works is ready for re-review. Doug called to say the plans are on hold with the parks dept. he will call Brian M.
Routing - PLUMBING7/22/2003 7/22/2003 PASS
1. vent through roof needs to be four inch to meet cross sectional area venting for four water closets. 2. building needs service sink per building code.
Routing - PLANNING7/18/2003 7/22/2003 PEND
Pending, waiting for approval from public works for drainage and Flood Plain requirements. May require a hillside permit depending on drainage per Terry R. A conditional of approval requires a hillside permit if applicable. This project was approved per CAV02-00042 and CUP02-00150.

Routing Off Site - STRUCTURAL7/10/2003 7/21/2003 FAIL
Contacted PDQ to take plans to outside engineering. kmm Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS GRADING7/14/2003 7/18/2003 FAIL
DetailsRita DeYoung
Existing sewer service line not shown per Ivan Butterfield/John J. Requires Drainage plan per Brian M. Flood Plain requirements per Jim Wyllie. kmm
Routing - Erosion and Sediment7/18/2003 7/18/2003 PASS
ESC approved with conditions attached to plans. Individual listed as RP is not certified by Boise City.
Routing Off Site -Energy7/10/2003 7/15/2003 FAIL
Contacted Ron O. for energy review. kmm Received comment list from Ron Oltman requesting revisions. JCM
Routing - PLANNING Land Div7/10/2003 7/14/2003 PASS
Approved, site is over 5 acres in size with frontage on Sunset Peak Road.
Plans ACCEPTED BY PLAN TECH  7/10/2003 DONE
Plans ACCEPTED BY PLAN TECH  7/10/2003 PEND
Requires complete civil
Plan routing begun/NEW & ADDTN  7/10/2003 DONE
Application received  7/8/2003  
Recd Pcfee & Taken To Pln CK  7/8/2003 DONE
Fee Review-notes7/8/20037/8/2003