BLD-Grading Inspection | 7/12/2004 | 7/12/2004 | 7/12/2004 | | DONE |
|
|
|
Final grading and drainage approved.
|
BLD-Final | 5/13/2004 | 5/13/2004 | 5/13/2004 | P | PART |
Tony Young
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to move furnishings in, c/n posted,, need hillside signed off also 5/13/2004 2:22:58 PM
|
BLD-Final | 5/5/2004 | 5/5/2004 | 5/5/2004 | P | FAIL |
Tony Young
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted 5/5/2004 2:45:00 PM
|
BLD-Final | 4/22/2004 | 4/22/2004 | 4/22/2004 | P | NR |
Tony Young
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
no inspection made,,,, no hillside signoff called for per Tim 4/22/2004 1:33:33 PM
|
BLD-Final | 4/15/2004 | 4/15/2004 | 4/15/2004 | P | FAIL |
Troy James
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Darla Downs
c/n posted with contractor. 4/15/2004 3:16:49 PM
|
BLD-Energy code compliance | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Tony Young
|
|
|
###-#### or ###-#### tim
ok to cover, fireplace and bonus room 12/17/2003 2:25:38 PM
|
BLD-Energy code compliance | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | FAIL |
Tony Young
|
|
|
###-#### or ###-#### tim bonus room
need vapor barrior on walls 12/16/2003 10:45:43 AM
|
BLD-Framing/Rough-in | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | FAIL |
Tony Young
|
|
|
###-#### or ###-#### tim fire place
need mech inspection 1st 12/16/2003 10:37:20 AM
|
Plan Reviewer's activity | | | 12/10/2003 | | DONE |
|
|
|
plans resubmitted for revisions. unfinished areas on second floor (bonus room above garage and room adjoining bedroom #4) were being insulated and covered. areas in this stage of construction are considered as finished. additional value of $13,000.00 and 1 hour administrative fee to be accessed. additional electrical
|
Case Summary (BLD) | | | 12/10/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/10/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/10/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/5/2003 | | |
|
|
|
|
BLD-Energy code compliance | 12/2/2003 | 12/2/2003 | 12/2/2003 | P | PASS |
Tony Young
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Conference | 11/28/2003 | 12/1/2003 | 12/1/2003 | A | PART |
Tony Young
|
|
|
tim, phone# ###-####
conf on frame 12/1/2003 10:41:51 AM
|
BLD-Framing/Rough-in | 11/28/2003 | 11/28/2003 | 11/28/2003 | P | FAIL |
Tony Young
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need trades, ok to insulate un-affected areas 11/28/2003 2:19:46 PM
|
BLD-Framing/Rough-in | 11/26/2003 | 11/26/2003 | 11/26/2003 | P | PART |
Tony Young
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ext. shear ok, wip on other frame issues, need mech. b-4 insulation,,,, ok to shear interior 11/26/2003 3:41:34 PM
|
BLD-Framing/Rough-in | 11/19/2003 | 11/19/2003 | 11/19/2003 | P | FAIL |
Tony Young
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
c/n posted 11/19/2003 2:25:27 PM
|
BLD-Foundation | 9/19/2003 | 9/22/2003 | 9/22/2003 | A | PART |
Tony Young
|
|
|
clay; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Foundation | 9/18/2003 | 9/19/2003 | 9/19/2003 | P | CANC |
Russ Owen
|
|
|
CLAY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks clay called to canc this inspection not ready...dld
|
BLD-Footing | 9/16/2003 | 9/17/2003 | 9/17/2003 | P | PART |
Tony Young
|
|
|
clay; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Grading Inspection | 9/17/2003 | 9/17/2003 | 9/17/2003 | | PASS |
Rita DeYoung
|
|
|
Geotech engineer has approved the footing subgrade.
|
Issue PAID IN FULL permit | | | 8/18/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 8/8/2003 | 8/8/2003 | 8/11/2003 | | PASS |
Dan Overy
|
|
|
8/11/2003 13:36:07 DJO - activity updated through activity BLDA022 from case BLD03-01688.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/11/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/11/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plans ACCEPTED BY PLAN CHECK | | | 8/8/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 8/8/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 8/8/2003 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/4/2003 | | 8/4/2003 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 8/4/2003 | | 8/4/2003 | | DONE |
|
|
|
No fire sprinlers required (Highlands Hackberry #4 Subdivision)
|
Routing - PLANNING | 7/31/2003 | | 8/1/2003 | | PASS |
|
|
|
Per corrected drive on updated site plan.
|
Routing - PLANNING | 7/18/2003 | | 7/21/2003 | | FAIL |
|
|
|
Called Robin Labrie to discuss incorrect setbacks rep. on site plan. AKT
|
Routing - PUBLIC WORKS | 7/18/2003 | | 7/18/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 7/14/2003 | | 7/18/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as category 3 with conditions of approval in letter from Boise Public Works attached to the plans
|
Application received | | | 7/14/2003 | | |
|
|
|
|
Pending Assignment by DJO | 7/14/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 8/5/2003 | | | | |
|
|
|
|