Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/15/2003 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 8/15/2003 | 8/15/2003 | 8/15/2003 | A | PASS |
Russ Owen
|
|
|
Finaled by inspector at 8/15/2003 11:01:56 AM
|
BLD-Final | 8/15/2003 | 8/15/2003 | 8/15/2003 | A | PASS |
Russ Owen
|
|
|
work done 8/15/2003 11:01:46 AM
|
FIRE-Final Inspection | 8/13/2003 | 8/14/2003 | 8/14/2003 | P | PASS |
Rick Jackson
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore column protection not needed; shelves not installed as this is for pallet storage 8/14/2003 8:34:29 AM
|
BLD-Conference | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Russ Owen
|
|
|
add 2 bolts at south side and fire /life safety insp. 8/13/2003 5:21:30 PM
|
BLD-Conference | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | CANC |
Russ Owen
|
|
|
phoned in 2 times. 8/13/2003 12:30:52 PM
|
Inspection Record Card- Bld | | | 8/6/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/6/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/4/2003 | | 8/5/2003 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2003 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 7/17/2003 | | 8/5/2003 | | PASS |
Jason Blais
|
|
|
8/5/2003 09:32:10 JCB - activity updated through activity BLDA022 from case BLD03-01703.
|
Routing - FIRE | 8/4/2003 | | 8/4/2003 | | DONE |
Bill Alexander
|
|
|
|
Routing - FIRE | 7/30/2003 | | 8/1/2003 | | FAIL |
Bill Alexander
|
|
|
Plans/submittals lack sufficient information to verify fire code requirements.
|
Telephone call | | | 8/1/2003 | | DONE |
|
|
|
9:20 am. Called Tom Hegge (Manager/Owner?) and requested information said he will come down and visit.
|
Meeting | | | 8/1/2003 | | DONE |
|
|
|
Met with Tom Hegge and went over IFC Chapter 23 minimum submittal requirements relating to his structure, type of storage use. All of which relates to commodity type information, existing fire protection system design, maximum requrested storage height, the height of floor to the roof, height of floor to bottom of trusses, top of commodity storage to fire sprinkler deflectors, type of rack shelfs invovled throughout, (how storing in the racks), whether commodity is encapsulated, banded, etc. He will fax the inforamtion to me as soon as he can.
|
Routing - PLAN CHECK | 7/17/2003 | | 7/30/2003 | | PEND |
|
|
|
Plan review report faxed to applicant. No response required. When approved by Fire Dept. permit can be issued. Plans to route to Fire Dept.
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2003 | | DONE |
|
|
|
1. Plans not fully dimensioned.
2. Floor plan not stamped/signed by licensed Arch/Engineer.
3. No vicinity map.
4. No building code data regarding occupancy group or construction type.
(Accept plans per Jason B.)
|
Application received | | | 7/15/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/15/2003 | | |
|
|
|
|
Fee Review-notes | 7/15/2003 | 7/15/2003 | | | |
|
|
|
|