Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01709
StatusFinaled
Name AMYX TRADITIONAL HOMES
Site Address 12254 W EDNA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a new 3532s.f. 2-story single family dwelling that has a 726s.f. unfinished basement, a 2256s.f. main level and the second level bonus room of 726s.f. over the 1102s.f. attached 3-car garage. IECC per rescheck attached. R-1B Shade restricted setbacks ok per pmc. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City.All per the approved plans as marked and attached conditions list. PC# 455 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/9/200312/9/200312/9/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/9/2003 at 9:28:36 AM. Contact: ###-####. C/C issued. 12/9/2003 2:20:26 PM
DOC - Permit Finaled12/9/200312/9/200312/9/2003PPASS
DetailsJim Sly
Finaled by inspector at 12/9/2003 2:20:34 PM
BLD-Energy code compliance10/22/200310/23/200310/23/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/22/2003 at 4:54:24 PM. Contact: ###-####. All ok , except at bonus room access door to attic area needs to be done with envelope, contactor said owner was working in this area and he will take care of this small section.which can bee seen. 10/22/2003 6:15:14 PM
BLD-Energy code compliance10/21/200310/23/200310/22/2003PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/21/2003 at 8:30:49 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Oct 22 2003 4:56PM.
BLD-Framing/Rough-in10/20/200310/21/200310/21/2003APASS
DetailsJim Sly
Dan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in10/21/200310/21/200310/21/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/21/2003 at 8:26:45 AM. Contact: ###-####.
BLD-Foundation8/13/20038/13/20038/13/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/13/2003 at 9:51:28 AM. Contact: ###-####.
BLD-Footing8/7/20038/8/20038/8/2003APASS
DetailsJim Sly
JOE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Inspection Record Card- Bld  8/7/2003 DONE
Telephone call  8/7/2003  
Issue PAID IN FULL permit  8/7/2003 DONE
Pending Assignment by DJO7/16/2003 8/4/2003 DONE
DetailsDan Overy
8/4/2003 16:41:37 PEP - activity updated through activity BLDA176 from case BLD03-01709.
Plan assigned to (PEP)8/4/2003 8/4/2003 PASS
DetailsPerry Paine
8/4/2003 16:53:01 PEP - activity updated through activity BLDA022 from case BLD03-01709.
Case Summary (BLD)  8/4/2003  
Plan Review Report  8/4/2003  
PLANS/APPL TAKEN TO FRONT DESK  8/4/2003 DONE
Routing - PUBLIC WORKS7/24/2003 7/25/2003 PASS
Routing - PLANNING7/25/2003 7/25/2003 PASS
updated home plans
Routing - PLANNING7/16/2003 7/18/2003 FAIL
Msg. for Joe: Need required 22' vehicular back up space & 3' landscape buffer. Move house toward rear lot line. Need new site plan. AKT (also faxed designer @ Matrix)
Application received  7/16/2003  
Routing - PLAN CHECK7/25/2003