Second Notice BLD | 1/29/2009 | 1/29/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 1/14/2009 | 1/14/2009 | 1/29/2009 | | DONE |
Dave Hannah
|
|
|
|
Fee Review-notes | 7/16/2003 | 7/16/2003 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
cert states n/a on fire, fire review has been done......so there are fees
|
BLD-Aging Inspection | 1/9/2009 | 1/9/2009 | 1/14/2009 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | PASS |
Dave Hannah
|
|
|
|
Permanent Occupancy | | | 1/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Zoning Approval | 1/12/2009 | 1/12/2009 | 1/12/2009 | | PASS |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 1/12/2009 | 1/12/2009 | 1/12/2009 | | DONE |
Tiffany Lowery
|
|
|
|
Telephone call | | | 1/9/2009 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Bonnie at (###-#### ext 2103) that permit has never had an occupancy certificate issued and still needs Planning & Zoning, Public Works and ACHD signatures before an occupancy can be issued///1-9-09 @ 2:42pm BAS
|
Case Summary (BLD) | | | 1/8/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/8/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Reopen Permit (ISS) | | | 1/8/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
per george ok to reopen- charge admin fee--still need Zoning, Public Works & ACHD sign offs
|
Case Summary (BLD) | | | 11/25/2008 | | |
|
|
|
|
BLD-Aging Inspection | 7/1/2004 | 7/1/2004 | 7/1/2004 | | DONE |
Troy James
|
|
|
|
DOC - Permit Expired | 7/1/2004 | 7/1/2004 | 7/1/2004 | A | PASS |
Troy James
|
|
|
Expired by inspector at 7/1/2004 9:55:25 AM
|
BLD-Final | 2/16/2004 | 2/18/2004 | 2/18/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/16/2004 at 4:01:09 PM. Contact: ###-####. ok for perm occ 2/18/2004 9:02:02 AM
|
FIRE-Final Inspection | 2/9/2004 | 2/12/2004 | 2/12/2004 | P | PASS |
Rick Jackson
|
|
|
will; Phone #: ###-#### Internet Inspection Request from: Darla Downs the draft stop doors still not closing tight and they will add springs on doors for the structural inspector; fire/life safety final okay 2/12/2004 3:40:41 PM
|
FIRE-Final Inspection | 2/5/2004 | 2/5/2004 | 2/5/2004 | P | FAIL |
Rick Jackson
|
|
|
smoke/fire dampers don't have the L bracket installed to hold damper in lid; draft stop doors not closing all of the way 2/5/2004 2:50:25 PM
|
BLD-Final | 12/3/2003 | 12/5/2003 | 12/5/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/3/2003 at 10:42:32 AM. Contact: ###-####. ok for a temp occ needs other trades sign off final 12/5/2003 4:27:49 PM
|
BLD-Framing/Rough-in | 11/26/2003 | 12/1/2003 | 12/1/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/26/2003 at 7:58:53 AM. Contact: ###-####.
|
FIRE-Final Inspection | 11/26/2003 | 11/26/2003 | 11/26/2003 | P | FAIL |
Rick Jackson
|
|
|
complete alarm issues under fire alarm permit; clarify exit sign on corridor side of multi-purpose room (exit through room with doors swinging out?); right leaf of doors with panic hardware won't open with left leaf closed; smoke seals on corridor doors if one hour corridor; draft stops not complete; occupant load sign in multi-purpose room; panic required on corridor door out of multi-purpose room and has slide dead bolt; need emergency light in west corridor;
|
Plan Reviewer's activity | | | 10/22/2003 | | DONE |
|
|
|
Deferred submittal sheets have been provided as requested. Project is cleared to proceed by Plan Check.
|
Plan resubmittals received | | | 10/20/2003 | | DONE |
|
|
|
Received two copies of revised sheets M1.0, M1.1 and M1.2. Routed to Mike O. kmm
|
BLD-Framing/Rough-in | 10/8/2003 | 10/8/2003 | 10/8/2003 | P | NR |
Dave Hannah
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore trusses crew still setting 10/8/2003 1:49:40 PM
|
Plan resubmittals received | | | 10/2/2003 | | DONE |
|
|
|
Received three copies of revised sheets A1.2, A2.1, A3.1, A3.2 from Britco and one cover letter. Routed to Mike O. kmm
|
BLD-Framing/Rough-in | 9/22/2003 | 9/23/2003 | 9/23/2003 | A | PART |
Steven Webb
|
|
|
###-#### ken Bearing point in crawl between building 10 and 11 against foundation wall located on south east corner of building. Installation OK. 9/23/2003 9:22:02 AM
|
(F) Reprint permit | | | 9/22/2003 | | DONE |
|
|
|
|
BLD-Footing | 9/17/2003 | 9/17/2003 | 9/17/2003 | P | PASS |
Jim Storey
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Foundation | 9/17/2003 | 9/17/2003 | 9/17/2003 | P | PASS |
Jim Storey
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Foundation | 9/16/2003 | 9/16/2003 | 9/16/2003 | P | PART |
Dave Hannah
|
|
|
KEN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks west half ok to pour 9/16/2003 3:35:31 PM
|
BLD-Foundation | 9/12/2003 | 9/15/2003 | 9/15/2003 | A | PART |
Tom Arcoraci
|
|
|
Bill; Phone #:###-#### Internet Inspection Request from: Annette Moore wip ok partial footing perimeter 9/15/2003 9:08:21 AM
|
(F) Reprint permit | | | 9/12/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 7/17/2003 | | 9/11/2003 | | PASS |
Mike Otto
|
|
|
9/11/2003 08:54:01 MLO - activity updated through activity BLDA022 from case BLD03-01716.
|
Plan resubmittals received | | | 9/11/2003 | | DONE |
|
|
|
Received revised certificate of value. MLO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/11/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/11/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/11/2003 | | DONE |
|
|
|
Is actually here to pick up needs achd
|
Telephone call | | | 9/11/2003 | | DONE |
|
|
|
permit is ready customer knows
|
Routing - PLAN CHECK | 9/9/2003 | | 9/10/2003 | | PASS |
|
|
|
approved with deferred submittals required on plan sheets A1.2, A2.1, revised sheets A3.1and 3.2, sheet M1.1 and any on sight mechancial not shown on factory drawings which are all stamped and signed by an Idaho Lic. architect or engineer. Plan sheets to be provided and approved prior to any rough-in inspections. MLO
|
Plan resubmittals requested | | | 9/10/2003 | | DONE |
|
|
|
Called architect to get revised certificate of value for all work to be done. MLO
|
Routing - PUBLIC WORKS | 9/5/2003 | | 9/9/2003 | | PASS |
|
|
|
|
Routing Off Site -Energy | 8/26/2003 | | 9/8/2003 | | PASS |
|
|
|
Contacted Eric M. for energy review on resubmittals of 8/26/03. Eric has outstanding corrections on the bi-level switching for lighting within the modulars and feels the design does not comply. However, the City of Boise has no jurisdiction on items built in the factory as reviewed and approved and inspected by the State of Idaho. Any site work done on the lighting which is permitted by the City must comply with energy requirements as regulated by the CIty of Boise. MLO
|
Routing Off Site - STRUCTURAL | 8/26/2003 | | 9/5/2003 | | PASS |
|
|
|
|
Routing - FIRE | 8/28/2003 | | 9/4/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/2/2003 | | DONE |
|
|
|
Received four copies of revised sheets a1.11, a1.12 and two copies of line item responses. Routed to Mike O.
|
Plan resubmittals requested | | | 8/28/2003 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 8/8/2003 | | 8/28/2003 | | FAIL |
|
|
|
8/26/2003 have received additional resubmittals and approved plans from the State of Idaho as requested for plan review. MLO 8/28 corrections sent to architect
|
Plan resubmittals received | | | 8/27/2003 | | FAIL |
|
|
|
sheets A3.1, A3.2 from Britco not stamped or signed. Cannot use in approval documents.
|
Plan resubmittals received | | | 8/26/2003 | | DONE |
|
|
|
Received four copies of revised sheets a1.12. Two copies of line item response to energy code review comments and state plan review comments and responses.
One copy of state approved plans. Routed to Mike Otto. kmm
|
Routing - PLUMBING | 8/6/2003 | | 8/8/2003 | | PASS |
|
|
|
verify water service piping with building requirements. supply minimum requirements.
|
Routing - PLANNING | 7/24/2003 | | 8/6/2003 | | PASS |
|
|
|
Approved per DRH03-31; pending CU analyst sign-off.
Approved by CU analyst
|
Routing Off Site -Energy | 7/17/2003 | | 8/6/2003 | | FAIL |
|
|
|
corrections faxed to architect
|
Plan resubmittals requested | | | 8/6/2003 | | DONE |
|
|
|
energy corrections
|
Plan resubmittals received | | | 8/6/2003 | | DONE |
|
|
|
three transmittal letters, letter from erstad thornton arch, two copies regarding response to request for clarification, two sheets of A1.11, three sets of A0.1,A3.1, taken to Mike O.
|
Plan resubmittals received | | | 7/28/2003 | | DONE |
|
|
|
3 page fax transmittal, two copies of details from Idaho Truss stamped not approved for construction, four copies of general notes & specification for construction, Four sets of AO.1,AO.2,A1.O,A1.1A1.2,A2.1,A3.1,A3.2,A4.1,E1.1,M1.1,PL1.1,PL1.2,taken to Mike O.
|
Routing Off Site - STRUCTURAL | 7/18/2003 | | 7/28/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 7/28/2003 | | DONE |
|
|
|
structural corrections
|
Routing - PUBLIC WORKS | 7/18/2003 | | 7/23/2003 | | FAIL |
|
|
|
Requires drainage plan legal per Brian M. addressing has approved 8-27-2003: still needs final approval by Public Works
|
Routing - Erosion and Sediment | 7/23/2003 | | 7/23/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING Land Div | 7/17/2003 | | 7/18/2003 | | PASS |
|
|
|
Approved.
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2003 | | DONE |
|
|
|
Mech. and outside elev. sheets not stamped or signed. kmm
|
Plan routing begun/NEW & ADDTN | | | 7/17/2003 | | DONE |
|
|
|
|
Application received | | | 7/16/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2003 | | |
|
|
|
|
Third Notice BLD | 3/3/2009 | 3/3/2009 | | | |
|
|
|
Second Notice has not been responded to.
|