Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 8/5/2004 | 4/26/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/10/2004 | 8/10/2004 | 8/10/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Framing/Rough-in | 8/5/2004 | 8/5/2004 | 8/5/2004 | P | PASS |
Jim Sly
|
|
|
bob smith; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued. 8/5/2004 12:37:44 PM
|
DOC - Permit Finaled | 8/5/2004 | 8/5/2004 | 8/5/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 8/5/2004 12:37:52 PM
|
BLD-Framing/Rough-in | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | NR |
Jim Sly
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 7/27/2004 | 7/28/2004 | 7/28/2004 | A | FAIL |
Jim Sly
|
|
|
please call 30 mins prior to inspection so he can meet ya there///bob smith; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need Plumb permit finaled. 7/28/2004 9:19:51 AM
|
FIRE-Final Inspection | 7/27/2004 | 7/27/2004 | 7/27/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety for the shell only is OK 7/27/2004 10:47:02 AM
|
BLD-Framing/Rough-in | 7/20/2004 | 7/20/2004 | 7/20/2004 | P | NR |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs fire life saftey sign off 7/20/2004 3:16:49 PM
|
PubWorks Occupancy Approval | 7/15/2004 | 7/15/2004 | 7/15/2004 | | DONE |
|
|
|
Drainage project complete, signed final occupancy 7/15/03. R.Rokovitz
|
FIRE-Final Inspection | 7/14/2004 | 7/14/2004 | 7/14/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide building address and suite numbers. Provide door hardware for compliance verification. Provide "Door to remain unlocked..." sticker on the tenant exit. Provide approved door hardware on the rear doors. Key locking as provided is not allowed. Provide a fire extinguisher per review notes. Provide panic hardware on the main exit. Install and test exit sign. 7/14/2004 4:04:31 PM
|
BLD-Framing/Rough-in | 7/9/2004 | 7/12/2004 | 7/12/2004 | A | PASS |
Jim Sly
|
|
|
WILLIAM; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/5/2003 at 8:02:51 AM. Contact: ###-####.
|
BLD-Other | 10/28/2003 | 10/28/2003 | 10/28/2003 | P | PASS |
Jim Sly
|
|
|
straps around windows//###-#### travis All straps OK....Located under OSB. 10/28/2003 1:59:52 PM
|
BLD-Foundation | 10/6/2003 | 10/6/2003 | 10/6/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/6/2003 at 7:16:50 AM. Contact: ###-####.
|
BLD-Footing | 10/3/2003 | 10/3/2003 | 10/3/2003 | P | PASS |
Tom Arcoraci
|
|
|
dane; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
(F) Reprint permit | | | 9/24/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/23/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/4/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/4/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/4/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/4/2003 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PLAN CHECK | 9/3/2003 | | 9/3/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/3/2003 | | 9/3/2003 | | PASS |
|
|
|
ESC approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2003 | | PASS |
|
|
|
|
Routing - FIRE | 8/25/2003 | | 9/3/2003 | | PASS |
|
|
|
resubmittal acceptable.
|
Plan assigned to (JCM) | 7/18/2003 | | 9/3/2003 | | PASS |
John Menard
|
|
|
9/3/2003 16:24:58 JCM - activity updated through activity BLDA022 from case BLD03-01726.
|
Plan resubmittals received | | | 8/29/2003 | | DONE |
|
|
|
Received three copies of ESC plan and two copies of narrative. Routed to John M. kmm
|
Routing - Erosion and Sediment | 8/21/2003 | | 8/25/2003 | | FAIL |
|
|
|
ESC plan does not meet conditions of BCC 8-17 and plan designer Appendix A, B, and C. Notified PD via telephone voice message.
|
Routing - PLANNING | 8/20/2003 | | 8/21/2003 | | PASS |
|
|
|
Approved per conditions of approval of CUP03-34.
|
Plan Reviewer's activity | | | 8/20/2003 | | PASS |
|
|
|
Plan resubmittals reviewed and approved with attached comment list for clarification. JCM
|
Routing - PLAN CHECK | 8/5/2003 | | 8/20/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/19/2003 | | DONE |
|
|
|
received two ESC narratives with three A1.1 sheets and taken to John M.
|
Plan resubmittals received | | | 8/18/2003 | | DONE |
|
|
|
Received two copies of revised sheet A1.2 and landscape plans for Lot 1 blk 4 and lot 15 block 4. Routed to John M. kmm
|
Plan resubmittals received | | | 8/12/2003 | | DONE |
|
|
|
received from Robin two letters from united water, two response letters from Studio L Arch. two copies of A2.0 taken to John M.
|
Routing - FIRE | 7/30/2003 | | 8/4/2003 | | FAIL |
|
|
|
Need hydrant flow information. IFC review comments faxed to architect.
|
Routing - PLAN CHECK | 7/29/2003 | | 7/30/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/30/2003 | | |
|
|
|
Mailed a copy of the plan review comment list to Architect requesting revisions. JCM
|
Routing - PLUMBING | 7/25/2003 | | 7/28/2003 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PUBLIC WORKS | 7/21/2003 | | 7/24/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 7/24/2003 | | 7/24/2003 | | FAIL |
|
|
|
No ESC plan or waiver request with submitted plans.
|
Routing - PLANNING | 7/24/2003 | | 7/24/2003 | | FAIL |
|
|
|
Fail due to non-compliance with conditions of approval of CUP02-43 and CUP03-34.
|
Routing - PLANNING Land Div | 7/18/2003 | | 7/18/2003 | | PASS |
|
|
|
Approved. Lot 1, Block 4 of Nokomis Pointe Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 7/18/2003 | | DONE |
|
|
|
using some of the UBC on cover sheet code data.
|
Plan routing begun/NEW & ADDTN | | | 7/18/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 7/16/2003 | | |
|
|
|
|
Application received | | | 7/16/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 7/16/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2003 | | |
|
|
|
|
Fee Review-notes | 7/16/2003 | 7/16/2003 | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | | | | | |
|
|
|
John to do Engineering
|
Routing Off Site -Energy | 7/18/2003 | | | | |
|
|
|
contacted Dave Musgrove for Energy review.
|