(DR MIKE DAVIS)(WAREING BUILDING) New 1,881 sq.ft. dental office on the west side of an existing vacant shell building per approved plans on file. Shell building was done under BLD03-00758. Work to include new interior walls, interior doors and windows, new suspended ceiling, interior finish, counters/sinks, two new accessible restrooms, new mechanical, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0419-03) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/22/20041/22/2004 DONE
Permanent occupancy  1/22/2004 DONE
Perm. Occ. Cert. # 9943 issued 1-22-04 to Dr. Mike Davis.
Permanent Occupancy 1/14/20041/14/2004 DONE
Details
BLD-Final1/14/20041/14/20041/14/2004PPASS
DetailsJim Sly
for perm occ- jim ###-#### OK for Perm Occ. :) 1/14/2004 2:02:36 PM
BLD-Energy code compliance12/3/200312/4/200312/4/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/3/2003 at 6:57:35 PM. Contact: ###-####.
BLD-Final12/3/200312/4/200312/4/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/3/2003 at 6:58:16 PM. Contact: ###-####. C/N Need Electr sign off for Perm Occ... Once verified.........OK to final structural for Perm Occ. :) 12/4/2003 9:10:47 AM 12/4/2003 9:11:43 AM
Temporary occupancy  12/4/2003 DONE
Temp. Occ. Cert. # 5034 issued 12-4-03 to Dr. Mike Davis.
FIRE-Final Inspection12/2/200312/3/200312/3/2003APASS
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final12/2/200312/3/200312/3/2003PNR
DetailsJim Sly
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need plumb final 12/3/2003 4:28:38 PM
FIRE-Supply Line Cover12/1/200312/2/200312/2/2003AFAIL
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs extinguisher hung 12/2/2003 10:40:39 AM
BLD-Energy code compliance11/14/200311/17/200311/17/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/14/2003 at 5:37:05 PM. Contact: ###-####.
BLD-Other11/14/200311/17/200311/17/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/14/2003 at 5:39:02 PM. Contact: ###-####. Ceiling grid and removal of kraft facing from insul....OK. 11/17/2003 11:37:51 AM
BLD-Framing/Rough-in11/13/200311/14/200311/14/2003PPART
DetailsJim Sly
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Ceiling appears OK....Need to remove exposed kraft paper from ceiling insulation. 11/14/2003 11:34:56 AM
BLD-Framing/Rough-in10/22/200310/23/200310/23/2003APASS
DetailsJim Sly
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in10/21/200310/22/200310/22/2003APASS
DetailsJim Sly
JIM; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Issue PAID IN FULL permit  10/9/2003  
Plan assigned to (JCB)7/24/2003 9/30/2003 PASS
DetailsJason Blais
9/30/2003 13:28:44 JCB - activity updated through activity BLDA022 from case BLD03-01742.
Routing - PLAN CHECK9/30/2003 9/30/2003 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/30/2003 PASS
Print Occupancy Form  9/30/2003 DONE
Permit Ready to Issue  9/30/2003 DONE
Telephone call  9/30/2003 DONE
permit ready and fees due
Routing - FIRE9/23/2003 9/29/2003 PASS
resubmittal approved subject to field verification of quantities of oxidizing gases. Review faxed to architect.
Routing - PLUMBING9/18/2003 9/23/2003 PASS
provide a valve to control all outlets in this space, n2o and o2 systems have been deleted from this project.
Routing - PLAN CHECK8/19/2003 9/18/2003 PEND
Permit can be issued when there is approval by Public Works, Plumbing, and the Fire Department. Plans to route to these divisions.
Routing - PUBLIC WORKS9/18/2003 9/18/2003 PASS
Additional restroom and service sink added.
Plan resubmittals received  9/15/2003 DONE
Response letter to Jason with two sets of A2.1, A7.1,EN-1, M.1, M.2 taken to Jason.
Routing - FIRE8/13/2003 8/19/2003 FAIL
Inadequate Med gas information on plans. Review faxed to architect.
Plan resubmittals requested  8/13/2003  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK8/6/2003 8/13/2003 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans routed to Fire Dept.
Routing - PLUMBING7/25/2003 8/6/2003 FAIL
provide a floor sink at vacuum pump, show intake and exhaust for equipment, water lines to equipment under cabinets will need r.p.s, provide an alarm system for compressed medical gas system, service piping to each tenant shall be separate, a mop sink will be required, show piping.
Routing - PUBLIC WORKS7/24/2003 7/25/2003 PASS
Plan resubmittals received  7/23/2003 DONE
Received three copies of EN-1 sheets for Com-Check, put with plans
Plans ACCEPTED BY PLAN TECH  7/22/2003 PEND
Waiting for mechanical com check.
Application received  7/18/2003