BLD-Aging Inspection | 6/6/2006 | 6/6/2006 | 6/12/2006 | | FAIL |
Tony Young
|
|
|
|
DOC - Permit Expired | 6/12/2006 | 6/12/2006 | 6/12/2006 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/17/2006 | 3/17/2006 | 3/20/2006 | | FAIL |
Tony Young
|
|
|
expired
|
DOC - Permit Expired | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | FAIL |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/11/2006 | 1/11/2006 | 1/13/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/31/2005 | 10/31/2005 | 11/2/2005 | | PASS |
Tony Young
|
|
|
|
BLD-Foundation | 6/20/2005 | 6/20/2005 | 6/20/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/20/2005 at 4:25:01 AM. Contact: ###-####. column ftgs for stairs ok to pour
|
BLD-Framing/Rough-in | 6/15/2005 | 6/17/2005 | 6/17/2005 | P | PART |
Tony Young
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa doorway areas ok to cover
|
Telephone call | | | 12/31/2004 | | DONE |
|
|
|
Called Pat McKeegan to set up appointment to review the plan resubmittals he had turned in on 12/10/03. They did not answer the requirements of the 8/19/03 plan review. We set time for 10 am on 1/5/04.
|
BLD-Framing/Rough-in | 12/1/2004 | 12/2/2004 | 12/2/2004 | A | NR |
Tony Young
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
conf only,,, need to go back to arch. and plan review if you want changes to plan 12/2/2004 1:23:35 PM
|
BLD-Aging Inspection | 9/30/2004 | 9/30/2004 | 9/30/2004 | | PART |
Tony Young
|
|
|
|
Issue PAID IN FULL permit | | | 7/1/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/24/2004 | | 5/6/2004 | | PASS |
|
|
|
Plan resubmittals & engineering provided per plan review conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2004 | | PASS |
|
|
|
To permit desk to process for permit.
|
Permit Ready to Issue | | | 5/6/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/6/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 4/21/2004 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A2.2, A2.3, one copy of respnse letter. Routed to Dan S. kmm
|
Routing - PLANNING Land Div | 2/24/2004 | | 2/24/2004 | | PASS |
|
|
|
Approved as Parcel "A" on ROS 6257 recorded on September 2, 2003.
|
Routing - FIRE | 2/18/2004 | | 2/23/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 12/31/2003 | | 2/18/2004 | | FAIL |
|
|
|
Additional clarification corrections required from resubmittals of 2/4/04. Copy faxed, mailed and e-mailed to Pat. Routing plans to fire code analyst and then to Planning-Land Div. for re-review.
|
Plan assigned to (DRS) | 7/24/2003 | | 2/18/2004 | | DONE |
Dan Stuart
|
|
|
Energy review by Dan S. Energy code requirements do not apply to historical structures per section 101.4.2.3, 2000 IECC.
|
Plan resubmittals received | | | 2/4/2004 | | DONE |
|
|
|
Received transmittal letter, copies of details from Trus Joist, four sets of sheetsA2.0,A2.1,A2.2,A2.3, taken to Dan S.
|
CHANGE STATUS TO (PND) | | | 2/3/2004 | | DONE |
|
|
|
per marlene change status back to pend
|
Permit EXTENDED | | | 1/30/2004 | | DONE |
|
|
|
per letter from jenifer gilliland extend until july 19, 2004/mls
|
Plan Reviewer's activity | | | 1/26/2004 | | DONE |
|
|
|
Copy of 180 day application expiration letter faxed, e-mailed and hard copy to Pat McKeegan 180 days was up on 1/19/04. Gave until 1/30/04 to request extension or application will be expired.
|
Meeting | | | 1/5/2004 | | DONE |
|
|
|
Met with Pat McKegan to review plan re-submittals of 12/11/03, provided in response to 8/14/03 plan review comments. A copy of the specific application and plan submittal items had been given to Pat McKeegan with the 8/14/03 plan review and the data provided in response had not addressed the plan review comments, added additional confusion trying to determine what was done and had not provided the specific items required for submital per the PDS Dept. House Conversion to Office Guideline. I had Pat come in to review the submittals. He was cnfused as the plans did not reflect the changes and data he said he had collected and I had received the wrong plan resubmittals. Pat took notes on missing items and said he would review his plans and make sure I received the right copies for review.I verified with him that he had a copy of the minimum guidelines for plan submittals for house to office conversion that he could reference to make sure all required information was provided. he stated he had the information.
|
Routing - PLAN CHECK | 8/25/2003 | | 12/31/2003 | | FAIL |
|
|
|
Resubmittal to 8/19/03 review comments received on 12/10/03. 12/31/03 - Plans were incomplete. I called architect to arrange for meeting to review the plan resubmittals and outstanding items.Arranged to meet on 1/5/04. Plans held at my desk until corrections provided.
|
Plan resubmittals received | | | 12/11/2003 | | DONE |
|
|
|
Received two copies of revised sheets T1.0, A1.0, A2.0, A2.1, A2.2, A2.3, EN1.0, one copy of cover letter and loads from Trus Joist. Routed to Dan S. kmm
|
Routing - PLAN CHECK | 8/13/2003 | | 8/19/2003 | | FAIL |
|
|
|
Plan submittals so incomplete that proper plan review cannot be performed . Notified architect by fax.
|
Plan resubmittals requested | | | 8/19/2003 | | FAIL |
|
|
|
Copy of review notice faxed to Pat McKeegan.
|
Plan resubmittals received | | | 8/14/2003 | | DONE |
|
|
|
Memorandum from Patrick McKeegan, Vicinity map, copy of fire flow information, two sealed hydrant site plans. taken to Dan S.
|
Routing - FIRE | 8/7/2003 | | 8/12/2003 | | FAIL |
|
|
|
plans lack hydrant locations and fire flow. Review faxed to architect.
|
Routing - PUBLIC WORKS | 8/6/2003 | | 8/7/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/4/2003 | | 8/5/2003 | | DONE |
|
|
|
Routed back to PW for another review.
|
Routing - PLANNING | 7/31/2003 | | 8/4/2003 | | PASS |
|
|
|
Approved per DRH03-137 and CUP03-126.
|
Routing - Erosion and Sediment | 7/31/2003 | | 7/31/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING Land Div | 7/29/2003 | | 7/30/2003 | | FAIL |
|
|
|
Do not issue building permit until Record of Survey is completed. Parcel has already been split - two illegal parcels.
|
Routing - PUBLIC WORKS | 7/24/2003 | | 7/29/2003 | | FAIL |
|
|
|
Requires drainage plan per Brian M. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 7/23/2003 | | PASS |
|
|
|
no tenant, converting house to office, Bryan stated we can use extra civil sheets for both address.
|
Application received | | | 7/23/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/23/2003 | | |
|
|
|
|
Meeting | | | 1/5/2003 | | DONE |
|
|
|
Met with Pat McKeegan to review plan resubmittals of 12/10/03. Pat looked at plans and said the wrong ones had been submitted and he will provide correct copies for re-review with correct data provided.
|
Fee Review-notes | 7/23/2003 | 7/23/2003 | | | |
|
|
|
|