Permit Information
Permit NumberBLD03-01795
StatusFinaled
Name GARRIK CONSTRUCTION NW
Site Address 6187 S TEAK AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a four bedroom, two and half bathroom 2325 sq. ft. two story single family dwelling (1175 sq. ft. first floor/1150 sq. ft. second floor) with a attached 808 sq. ft. three car garage and a 166 sq. ft. covered front porch. Per approved plans, engineering and requirement list. PC#452 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/3/200312/3/200312/3/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/3/2003 at 10:48:04 AM. Contact: ###-####.
DOC - Permit Finaled12/3/200312/3/200312/3/2003PPASS
DetailsJim Storey
Finaled by inspector at 12/3/2003 3:51:08 PM
BLD-Energy code compliance10/28/200310/29/200310/29/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/28/2003 at 6:17:02 PM. Contact: ###-####.
BLD-Framing/Rough-in10/27/200310/28/200310/28/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/27/2003 at 6:17:36 PM. Contact: ###-####.
BLD-Foundation8/22/20038/22/20038/22/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/22/2003 at 7:01:05 AM. Contact: ###-####. wip ok 8/22/2003 10:53:32 AM
BLD-Footing8/20/20038/20/20038/20/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/20/2003 at 6:40:53 AM. Contact: ###-####. 98 % 8/20/2003 11:35:27 AM
BLD-Footing8/18/20038/19/20038/19/2003ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/18/2003 at 6:33:32 AM. Contact: ###-####.
BLD-Footing8/19/20038/19/20038/19/2003PNR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 8/19/2003 at 8:54:10 AM. Contact: ###-####. No form boards or humans in excavation--called contact number, left message, do not pour. Complete set-up and call for inspection. 8/19/2003 1:44:49 PM
BLD-Footing8/18/20038/18/20038/18/2003PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/18/2003 at 6:33:32 AM. Contact: ###-####. out of time. 8/18/2003 5:05:38 PM
Issue PAID IN FULL permit  8/13/2003 DONE
Inspection Record Card- Bld  8/7/2003 DONE
Pending Assignment by DJO7/24/2003 8/5/2003 DONE
DetailsDan Overy
8/5/2003 14:04:21 SAM - activity updated through activity BLDA183 from case BLD03-01795.
Routing - PLAN CHECK7/25/2003 8/5/2003 DONE
Plan assigned to (SAM)8/5/2003 8/5/2003 PASS
DetailsSteve Munroe
8/5/2003 16:16:05 SAM - activity updated through activity BLDA022 from case BLD03-01795.
Case Summary (BLD)  8/5/2003  
Plan Review Report  8/5/2003  
PLANS/APPL TAKEN TO FRONT DESK  8/5/2003 DONE
Routing - PUBLIC WORKS7/24/2003 7/25/2003 PASS
Application received  7/24/2003  
Routing - PLANNING7/24/2003 7/24/2003 PASS