(F) Reprint permit | | | 4/13/2004 | | DONE |
|
|
|
|
BLD-Final | 3/25/2004 | 3/26/2004 | 3/26/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/25/2004 at 7:43:45 PM. Contact: ###-####.
|
DOC - Permit Finaled | 3/26/2004 | 3/26/2004 | 3/26/2004 | P | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 3/26/2004 2:38:46 PM
|
BLD-Final | 3/24/2004 | 3/25/2004 | 3/25/2004 | A | FAIL |
Troy James
|
|
|
call 1st for access david -###-####-re-insp
Still need handrail at lower portion of stairs and seal attic access at garage and house. 3/25/2004 8:46:12 AM
|
BLD-Final | 3/19/2004 | 3/22/2004 | 3/22/2004 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/19/2004 at 4:37:09 PM. Contact: ###-####.
no access,,, RE-INSPECTION FEE IMPOSED,,,$44.10 3/22/2004 11:35:32 AM
|
BLD-Final | 3/17/2004 | 3/17/2004 | 3/17/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/17/2004 at 10:47:45 AM. Contact: ###-####.c/n posted on kitchen counter. 3/17/2004 3:39:51 PM
|
BLD-Final | 3/9/2004 | 3/9/2004 | 3/9/2004 | P | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/9/2004 at 10:30:07 AM. Contact: ###-####. Unable to obtain access to house and need to complete mechanical and plumbing final. 3/9/2004 3:18:27 PM
|
BLD-Final | 1/28/2004 | 1/29/2004 | 1/29/2004 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/28/2004 at 9:24:13 PM. Contact: ###-####.
need trades 1st 1/29/2004 3:11:24 PM
|
BLD-Conference | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/17/2003 at 11:23:17 AM. Contact: ###-####.
U value on windows are OK 12/17/2003 3:01:27 PM
|
BLD-Conference | 10/14/2003 | 10/14/2003 | 10/14/2003 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 9:48:37 AM. Contact: ###-####.
ok to cover,,, floor over porch was blown in 10/14/2003 2:58:26 PM
|
BLD-Energy code compliance | 10/14/2003 | 10/14/2003 | 10/14/2003 | P | PART |
Tony Young
|
|
|
verify new windows at final. need to be .35 u value
|
BLD-Energy code compliance | 10/13/2003 | 10/13/2003 | 10/13/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/13/2003 at 10:23:10 AM. Contact: ###-####. c/n stated do not insulate/mech check report not as built for window e value. 10/13/2003 3:30:36 PM
|
BLD-Energy code compliance | 10/10/2003 | 10/10/2003 | 10/10/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/10/2003 at 10:10:55 AM. Contact: ###-####. two items on c/n note complete do not cover 10/10/2003 4:51:11 PM
|
BLD-Framing/Rough-in | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/8/2003 at 5:01:36 PM. Contact: ###-####.
c/n posted,,, ok to insulate 10/9/2003 12:24:45 PM
|
BLD-Energy code compliance | 10/7/2003 | 10/8/2003 | 10/8/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/7/2003 at 12:35:57 PM. Contact: ###-####.
c/n not completed, do not insulate 10/8/2003 10:09:49 AM
|
BLD-Framing/Rough-in | 10/6/2003 | 10/7/2003 | 10/7/2003 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/6/2003 at 6:28:04 PM. Contact: ###-####.
do not insulate, c/n posted 10/7/2003 1:46:32 PM
|
BLD-Framing/Rough-in | 10/2/2003 | 10/7/2003 | 10/6/2003 | A | CANC |
Tony Young
|
|
|
monica ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Disp set to [CANC] by a contractor via Hello! on Oct 6 2003 6:27PM.
|
BLD-Framing/Rough-in | 9/5/2003 | 9/8/2003 | 9/5/2003 | A | CANC |
Tony Young
|
|
|
MONICA; Phone #: ###-#### Internet Inspection Request from: Marc Lileks Disp set to [CANC] by a contractor via Hello! on Sep 5 2003 12:28PM.
|
BLD-Framing/Rough-in | 9/5/2003 | 9/5/2003 | 9/5/2003 | P | PART |
Tony Young
|
|
|
MONICA SHEER WALL; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
shear inspection not reqd., ok to cover exterior, no inspection made 9/5/2003 3:24:08 PM
|
BLD-Foundation | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | PART |
Tony Young
|
|
|
###-#### curtis
c/n to provide 5' west side setback 8/20/2003 11:15:58 AM
|
BLD-Footing | 8/19/2003 | 8/19/2003 | 8/19/2003 | P | PART |
Dave Hannah
|
|
|
CURTIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Issue PAID IN FULL permit | | | 8/15/2003 | | DONE |
|
|
|
|
Pending Assignment by DJO | 7/28/2003 | | 8/7/2003 | | DONE |
Dan Overy
|
|
|
8/7/2003 11:35:11 SAM - activity updated through activity BLDA183 from case BLD03-01812.
|
Routing - PLAN CHECK | 7/30/2003 | | 8/7/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/7/2003 | | 8/7/2003 | | PASS |
Steve Munroe
|
|
|
8/7/2003 14:10:18 SAM - activity updated through activity BLDA022 from case BLD03-01812.
|
Case Summary (BLD) | | | 8/7/2003 | | |
|
|
|
|
Plan Review Report | | | 8/7/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2003 | | FAIL |
|
|
|
tried to call # on application of ###-#### says it was disconnected.
|
Routing - PLANNING | 7/30/2003 | | 7/30/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/30/2003 | | 7/30/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PLANNING Land Div | 7/28/2003 | | 7/28/2003 | | PASS |
|
|
|
Approved, parcel is result of one time allowable lot split. Lot was platted in 1949.
|
Application received | | | 7/28/2003 | | |
|
|
|
|