Permit Information
Permit NumberBLD03-01830
StatusFinaled
Name IDAHO CENTRAL CREDIT UNION
Site Address 200 N 4TH ST
Project NameTERRACE PLAZA
Customer Number 
ePlanReviewNo
Description
(IDAHO CENTRAL CREDIT UNION)(TERRACE PLAZA) To remodel restrooms on all floors for accessibility upgrade, provide new interior finish upgrades, add new smoke door across the existing corridor to separate the new breakroom area from the exit corridor, add support structure with decorative finishes to the building exterior and upgrade electrical, mechanical, plumbing and basement sprinkler sytem to meet tenant needs and provide compliance with current codes, all per approved plans to include notes theron & all attached plan review comments. NOTE: This building is fire sprinklered in the basement only. This project has been submitted and reviewed for a change in construction type, as a Type IIIB rather than Type IIIA construction type, since the building is not compliant with 1-hour construction. A "Letter of Compliance" is required for this project. DRH03-00109 PC03-436/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/30/2005 DONE
Letter of Compliance issued 12-30-05.
BLD-Final11/29/200511/29/200512/1/2005PPASS
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Aging Inspection11/21/200511/21/200511/21/2005 NR
DetailsTom Arcoraci
FIRE-Final Inspection9/19/20059/19/20059/20/2005PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Final9/19/20059/19/20059/19/2005PFAIL
DetailsDave Hannah
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs handrail on ramp in basement
FIRE-Final Inspection9/14/20059/14/20059/14/2005PPART
DetailsForrest France
A smoke door to separate the new breakroom from the exiting corridor was not installed as indicated on the scope of work, contractor says plans do not indicate this door, waiting on clarification from architect in regards to this issue.
FIRE-Final Inspection7/14/20057/15/20057/15/2005AFAIL
DetailsForrest France
Clarify scope of work in regard to the installation of a new smoke door at exiting corridor from break room, fire sprinkler permit FIR04-00358 must be finaled prior to sign-off on building permit.
BLD-Framing/Rough-in5/4/20055/4/20055/4/2005PPART
DetailsDave Hannah
ceiling inspection please///paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover main entry area holes around elev and stair tower patched
BLD-Aging Inspection5/2/20055/2/20055/3/2005 PASS
DetailsDave Hannah
work in progress
BLD-Framing/Rough-in5/2/20055/2/20055/2/2005PPART
DetailsDave Hannah
paul///ceiling inspection on 1st floor lobby only please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceiling grid is org so its ok but need to patch holes in stair tower and elev shaft above ceiling line
BLD-Framing/Rough-in2/24/20052/25/20052/25/2005PPART
DetailsDave Hannah
Paul; Phone #: ###-#### Internet Inspection Request from: Jan Rice ceiling grid ok to drop in pannels 2/25/2005 3:23:19 PM
BLD-Framing/Rough-in2/15/20052/16/20052/16/2005APART
DetailsTroy James
Paul-basement; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to cover walls only upon approval of all trades. 2/16/2005 9:32:25 AM
BLD-Framing/Rough-in2/2/20052/2/20052/2/2005PPART
DetailsDave Hannah
this is in the basement bathroom please///paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore restrooms in basement ok to cover 2/2/2005 1:55:00 PM
BLD-Conference1/20/20051/21/20051/21/2005ACANC
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Conference1/21/20051/21/20051/21/2005PPART
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ada restrooms in basement 1/21/2005 2:12:41 PM
BLD-Framing/Rough-in1/14/20051/14/20051/14/2005PPART
DetailsDave Hannah
ceiling inspection please///paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to drop in pannels 1/14/2005 4:19:23 PM
BLD-Framing/Rough-in12/9/200412/10/200412/10/2004APART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice 1st floor bath room 12/10/2004 11:19:35 AM
BLD-Conference12/1/200412/1/200412/1/2004PDONE
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in11/18/200411/18/200411/18/2004PPART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ceiliong grid second floor bath rooms ok to drop in pannels 11/18/2004 3:19:21 PM
BLD-Framing/Rough-in11/5/200411/8/200411/8/2004PPART
DetailsDave Hannah
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore restroom on second floor ok to cover 11/8/2004 2:41:47 PM
BLD-Foundation10/14/200410/14/200410/14/2004PCANC
DetailsDave Hannah
ceiling grid-- mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/14/200410/14/200410/14/2004PPART
DetailsDave Hannah
ceiling grid-- mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 3rd floor ok to drop in ceiling panels after elec sign off
BLD-Framing/Rough-in9/30/200410/1/200410/1/2004PPART
DetailsDave Hannah
MIKE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 3rd floor bath rooms ok to cover after plumbing r/i 10/1/2004 2:05:41 PM
BLD-Aging Inspection8/17/20048/17/20048/17/2004 PASS
DetailsDave Hannah
wip 8/17/2004 9:28:54 AM
BLD-Conference6/5/20046/7/20046/7/2004ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/5/2004 at 12:59:06 PM. Contact: ###-####.
BLD-Footing5/13/20045/17/20045/17/2004APART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes north side column ftgs ok they will also have spec inspe 5/17/2004 11:12:38 AM
BLD-Aging Inspection5/12/20045/12/20045/12/2004 DONE
DetailsDave Hannah
exps on 8/4 5/12/2004 7:27:43 AM
Issue PAID IN FULL permit  2/11/2004 DONE
Telephone call  1/27/2004 DONE
left mess that permit is ready
Plan assigned to (DRS)8/1/2003 1/6/2004 PASS
DetailsDan Stuart
1/6/2004 11:32:48 DRS - activity updated through activity BLDA022 from case BLD03-01830.
Routing - PLAN CHECK1/6/2004 1/6/2004 PASS
Approved as noted on plans, attached plan review comments of all agencies and recorded Letter of Agreement on property for five year time frame to fully sprinkler the building from the date of permit issuance. Copy attached to plans.
PLANS/APPL TAKEN TO FRONT DESK  1/6/2004 PASS
To permit desk to process for issuing of building permit.
Telephone call  1/6/2004 DONE
Called Steve Christianson, LCA, to let him know the plans were approved by fire and have been taken to the permit desk for processing for building permit.
Inspection Record Card- Bld  1/6/2004 DONE
Permit Ready to Issue  1/6/2004 DONE
Telephone call  1/6/2004 DONE
left a message with Gus at Gorringe Brothers -- permit is ready.
Routing - PLAN CHECK10/6/2003 12/22/2003 PEND
Approved as noted and attached plan review comments and the Letter of Agreement for a five year time frame from date of permit issuance to have the building fully sprinklered.
Plan resubmittals received  12/19/2003  
Received two copies of reivsed sheets A2.08, A2.11, A2.12, A4.0, A4.1, E1.0, E2.1D, E2.1, E2.2D, E2.2, E3.0, and response letter. routed to Dan S. kmm
Telephone call  10/6/2003 DONE
telcon from Jeff at Eidam; explained my review comments relative to FA requirements. Faxed a copy to them for their review.
Routing - FIRE9/26/2003 10/3/2003 FAIL
Inadequate alarm and related information. Review comments faxed to architect
Plan resubmittals requested  9/26/2003 FAIL
FAXED TO STEVE CHRISTIANSEN
Meeting  9/25/2003 DONE
Met with Steve Christiansen, LCA, and Anna Lisby & Kent Oram of Idaho Central Credit Union. Discussion concerning 1) Making sure restroom stall doors are big enough to meet accessiblity requirements (32" clear width);
2) Letter of agreement in file under BLD01-00231 signed by Mr. Adams (last owner) & Tim Hogland (Building Official) agreeing to upgrade restrooms for accessibility compliance and smoke guard protection at all elevato openings, to be completed by Feb 2004. Mr. Oram or Ms. Lisby had never heard of the agreement. A copy was given to them;
3) The corridors throughout the building are not in compliance as 1-hour rated with openings, penetrations & glazing protected as noted in codes under which constructed and permits that have been issued. We discussed options for upgrade agreement proposal. Over a proposed period of time upgrade all corridor deficiencies (construction, doors, glazing, fire dampers, hardware) or sprinkler the builidng throughout over a to be proposed time frame that would elliminate the need for rated corridors.
We also noted that there appears to be an access panel in the third floor stair enclosure, NW stair, to access mechanical. Stair enclosure are to have no penetrations except by utilities specifically serving the enclosure only. They would check this out.
Routing - PLAN CHECK8/6/2003 9/25/2003 FAIL
ROUTING TO FIRE CODE ANALYST WHILE WAITING FOR RESPONSE FROM ARCHITECT.
Telephone call  9/24/2003 DONE
Call from Steve Chritiansen, Lombard Conrad Architects requesting a meeting with himself and two representative with Idaho Central Credit Union to discuss options for the lack of a rated corridor system. We agreed to 10 AM on Thursday, 9/25/03.
Routing - PLANNING8/5/2003 8/6/2003 PASS
Approve per DRH03-109.
Routing - Erosion and Sediment8/4/2003 8/4/2003 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS8/1/2003 8/4/2003 PASS
Plans ACCEPTED BY PLAN TECH  7/30/2003 DONE
Application received  7/29/2003  
Recd Pcfee & Taken To Pln CK  7/29/2003 DONE
Routing - FIRE12/23/2003 1/5/2003 PASS
Resubmittal acceptable.
Fee Review-notes7/29/20037/29/2003