Permit Information
Permit NumberBLD03-01833
StatusFinaled
Name DAVE STORY (GC REP)
Site Address 212 N 9TH ST
Project NameJORDAN BLDG
Customer Number 
ePlanReviewNo
Description
(PIAZZA DI VINO) This building is NOT fire sprinklered. To remodel a former restaurant for a new restaurant and retail sales art gallery tenant. This tenant space is located within an existing 2 story building having a first floor area of 6,000 square feet. This tenant space has a 656 square foot 1st floor and a 712 square foot 2nd floor. The 2nd floor will be used for display and retail sales of art and the 1st floor will be used as a restaurant with an accessory kitchen. The "basement" is classified as a crawl space and is NOT approved for occupancy, including storage. Work is to include millwork and interior finishes all per the approved drawings and the plan review report on file. The occupant load of the 2nd floor (10) shall be posted on an approved sign at the top of the stairs. The occupant load of the first floor (22) shall be posted on an approved sign near the exit door. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 10/9/200310/9/2003 DONE
Permanent occupancy UNPAID FEE  10/9/2003 DONE
Perm. Occ. Cert. # 9837 issued 10-9-03 to Piazza Di Vino.
Permanent Occupancy 10/8/200310/8/2003 DONE
Details
FIRE-Final Inspection10/7/200310/8/200310/8/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/7/2003 at 2:39:25 PM. will have "Door to remain unlocked..." sign above door for structural inspector 10/8/2003 4:06:48 PM
BLD-Final10/7/200310/8/200310/8/2003PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/7/2003 at 2:40:34 PM. ok for perm occ 10/8/2003 3:47:51 PM
FIRE-Final Inspection10/1/200310/2/200310/2/2003PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/1/2003 at 3:48:53 PM. Contact: ###-####.
FIRE-Final Inspection10/1/200310/2/200310/2/2003PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/1/2003 at 3:48:53 PM. Contact: ###-####. received a call from Jeff and they aren't ready and will reschedule 10/2/2003 1:49:35 PM
BLD-Final10/1/200310/2/200310/2/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/1/2003 at 3:51:13 PM. Contact: ###-####.
BLD-Final10/1/200310/2/200310/2/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/1/2003 at 3:51:13 PM. Contact: ###-####.
BLD-Framing/Rough-in9/18/20039/19/20039/19/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/18/2003 at 11:05:26 AM. Contact: ###-####. ok to cover suspended ceiling after elec r/i 9/19/2003 10:50:11 AM
Issue PAID IN FULL permit  9/10/2003 DONE
Routing - PLAN CHECK9/9/2003 9/9/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/9/2003 PASS
Inspection Record Card- Bld  9/9/2003 DONE
Print Occupancy Form  9/9/2003 DONE
Permit Ready to Issue  9/9/2003 DONE
Telephone call  9/9/2003 DONE
PERMIT READY AND FEES DUE
Plan assigned to (CJW)8/1/2003 9/9/2003 PASS
DetailsCarl Westfall
9/9/2003 08:17:53 CJW - activity updated through activity BLDA022 from case BLD03-01833.
Routing - FIRE9/2/2003 9/8/2003 PASS
Approved subject to inspection to verify IFC code compliance; no written comments.
Routing - PLAN CHECK8/6/2003 9/2/2003 PASS
IBC plan review started August 29, 2003 and finished September 2, 2003. The drawings were approved with conditions. See the plan review report. A copy was sent to the architect.
Routing - PLUMBING8/4/2003 8/6/2003 PASS
1. water heater will require a pan with a drain to approved location 2. service sink required.
Routing - PUBLIC WORKS8/1/2003 8/4/2003 PASS
Application received  7/30/2003  
Plans ACCEPTED BY PLAN TECH  7/30/2003 DONE
plan accepted per Carl W. CDH approval by Bud Fulleton.
Recd Pcfee & Taken To Pln CK  7/30/2003 DONE
Fee Review-notes7/30/20037/30/2003