Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01837
StatusFinaled
Name DOMINGO'S ASIAN MARKET
Site Address 9975 W FAIRVIEW AVE
Project NameDomingo's
Customer Number 
ePlanReviewNo
Description
Domingo's * Fire Repair * To rebuild a 22' X 40' 880 sq.ft. portion of this building on the southern end which was destroyed by fire and remodel the remainder of this building to accommodate a retail market. Work to include the remodel of the existing restroom and add one new restroom, add 258 sq.ft. second floor for office area, new HVAC systems, electrical light fixtures and suspended ceiling. All construction per the approved plans and attached comment list. Note: This permit is to including the approval by the structural inspector, a previously constructed, 15' X 40'. non-permitted, pole type building at the south end of the property. This building must meet fire and life safety requirements. Structural integerity has been approved by MTC Inc. a copy of this approval letter is in the file. MJP DRH03-00142 PC#441-03
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/26/20043/26/2004 DONE
First Notice 3/26/20043/26/2004 DONE
First Notice 3/26/20043/26/2004 DONE
Permanent occupancy  3/26/2004 DONE
Perm. Occ. Cert. # 10056 issued 3-26-04 to Domingo's Asian Market.
Permanent Occupancy 3/23/20043/23/2004 DONE
Details
BLD-Final12/23/200312/23/200312/23/2003PFAIL
DetailsJim Sly
Joan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/23/2003 3:53:53 PM Check all Previous notes (history) Need CDHD final verified, and final on Zoning (note: Bonded for landscaping)...... OK to final for Perm. Occ. (in computer) when CDHD and Zoning verified for Perm. 12/23/2003 4:37:07 PM 12/23/2003 4:39:58 PM
BLD-Final12/11/200312/11/200312/11/2003PPART
DetailsJim Sly
Joan --- please call first for access.+; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/11/2003 12:48:32 PM 12/11/2003 1:45:58 PM OK for Temp Occ. Need CDHD and Plumb final for Perm. Occ. Verify zoning OK..... C/N Need all req signatures for Perm. Occ. within 90 days of this notice. Structural OK when all sinatures received. 12/11/2003 2:02:08 PM
BLD-Final12/9/200312/10/200312/10/2003AFAIL
DetailsJim Sly
Joan -- please call first for access.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need all req. signatures. 12/10/2003 9:14:42 AM
FIRE-Final Inspection12/9/200312/9/200312/9/2003PPASS
DetailsRick Jackson
Joan; Phone #: ###-####, please call first for access. thanks. Internet Inspection Request from: Aimee Hughes
BLD-Final11/26/200311/28/200311/28/2003ACANC
DetailsGeorge Slane
joan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection11/26/200311/28/200311/28/2003AFAIL
DetailsRick Jackson
joan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need address; fire extinguishers at both levels; NE exit must be openable from the inside without special knowledge and SE exit has deadbolt to be removed; stagjing exit to be lever type; need duct detectors for AC 1 and 2 with remote indicators; need "Door to Remian unlocked..." above main exit double doors 11/28/2003 11:33:21 AM
Print Occupancy Form  11/25/2003 DONE
Inspection Record Card- Bld  11/25/2003 DONE
BLD-Framing/Rough-in11/20/200311/20/200311/20/2003PFAIL
DetailsJim Sly
joan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Eng provided for ledgers and attachment.....OK. C/N Eng to advise for bottom chord bracing.....can check at final..... 11/20/2003 2:25:24 PM 11/20/2003 2:27:12 PM
BLD-Framing/Rough-in11/12/200311/12/200311/12/2003PFAIL
DetailsJim Sly
phillip-- ###-#### C/N Nail roof sheath to blocks or Eng fix (E wall) Blocks and nailing of sheathing at W wall?....Eng to advise fireblock at HVAC chase. 11/12/2003 4:04:53 PM
BLD-Framing/Rough-in11/5/200311/5/200311/5/2003PFAIL
DetailsJim Sly
joan; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N Roof/truss not per appr plan.....Eng to provide detail for truss bearing at CMU wall....and attachment.....E wood firred wall ...bearing wall? or Eng to detail ledger and attach for truss bearing? ....Do not cover these areas....need truss eng. 11/5/2003 2:48:19 PM
BLD-Concrete10/22/200310/22/200310/22/2003PPART
DetailsJim Sly
joan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Slab......Still need special insp ...unless letter provided from Engineer. 10/22/2003 5:08:15 PM
Inspection Record Card- Bld  10/22/2003 DONE
Print Occupancy Form  10/22/2003  
BLD-Concrete10/7/200310/8/200310/8/2003PPART
DetailsJim Sly
joan; Phone #: ###-#### Internet Inspection Request from: Annette Moore 10/8/2003 12:18:46 PM OK pending special insp (strata) reports and appr. 10/8/2003 3:21:29 PM
BLD-Footing10/2/200310/6/200310/6/2003APART
DetailsJim Sly
joan-- ###-#### C/N Need either spec insp or letter from Eng lowering conc PSI from 3000 to 2500 rebar etc appears OK. 10/6/2003 8:58:18 AM
Routing - PLAN CHECK9/30/2003 10/2/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/2/2003 DONE
Print Pending Permit.LaserJet4  10/2/2003 DONE
Case Summary (BLD)  10/2/2003 DONE
Permit Ready to Issue  10/2/2003 DONE
Telephone call  10/2/2003 DONE
left mess that permit is ready
Issue PAID IN FULL permit  10/2/2003 DONE
Plan assigned to (M_P)8/4/2003 10/2/2003 PASS
DetailsMike Phillips
10/2/2003 09:03:56 M_P - activity updated through activity BLDA022 from case BLD03-01837.
Plan resubmittals received  9/30/2003 DONE
Received four copies of revised sheets A2-1, A2-2 one copy of letter from MTC inc. routed to Mike P. kmm
Routing - PLANNING9/30/2003 9/30/2003 PASS
Approved per DRH03-142.
Routing - Erosion and Sediment9/25/2003 9/29/2003 PASS
ESC approved with conditions attached to plans.
Routing - PLAN CHECK9/4/2003 9/25/2003 FAIL
Waiting for informaiton on rear structure and equipment and furnishings layout, prior to issuing permit. Permit might be issued as a vanilla finish without a certificate of occupancy. Others need to approve project prior to issuance of this permit.
Plan resubmittals received  9/25/2003 DONE
received ESC application with BMP information and responsible person check list. Taken to Mike P.
Plan resubmittals received  9/24/2003 DONE
Received two copies of revised sheets C-2, C-3, C-4R, S-002, E-1, M-1, P-1, P-2, P-3. Routed to Mike P. kmm
Routing Off Site - STRUCTURAL9/16/2003 9/17/2003 PASS
contacted PDQ for outside engineering.
Plan resubmittals received  9/16/2003 DONE
Received three copies of S-001,S-002,S-003, S-004,S-005,S-006, two copies of C-4 two response letters addressing plan review comments, copy of the plan review report, three calculations from Eagle Engineering, taken to Mike P.
Routing - Erosion and Sediment9/4/2003 9/4/2003 FAIL
ESC plan does not meet per BCC 8-17, RP and PD are not certified with Boise City. No inspector checklist, etc.
Routing - FIRE8/27/2003 9/4/2003 PASS
Approved subject to conformace with all Building (IBC) plan review comments, no additional review comments atttached.
Print permit w/o conditions  8/27/2003  
Routing - PLAN CHECK8/11/2003 8/27/2003 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing Off Site - STRUCTURAL8/5/2003 8/18/2003 DONE
contaced PDQ to take to outside engineering. kmm
Outside engineering is requireing a follow-up review prior to issuing permit.
Plan resubmittals received  8/12/2003 DONE
Received two copies of ESC02-00671 to put with plans. kmm
Plan resubmittals received  8/12/2003 DONE
Received two copies of project information with two ESC plans and taken to Mike P,
Routing - PLUMBING8/8/2003 8/11/2003 PASS
Routing - PLANNING8/7/2003 8/8/2003 PEND
Design Review approval pending ACHD Commission approval. The ACHD Commission hearing is August 20, 2003.
Routing - Erosion and Sediment8/6/2003 8/7/2003 FAIL
ESC does not meet standards of BCC 8-17 or appendix A&C of Plan Designer Manual.Contacted Joan at ###-####.
Routing - PUBLIC WORKS8/4/2003 8/6/2003 PASS
Pending Assignment by JCM8/1/2003 8/4/2003 DONE
DetailsJohn Menard
8/4/2003 09:07:19 JCM - activity updated through activity BLDA170 from case BLD03-01837.
Plans ACCEPTED BY PLAN TECH  8/1/2003 PASS

Routing - PLANNING Land Div8/1/2003 8/1/2003 PASS
Approved. ROS 0295.
Plan routing begun/NEW & ADDTN  8/1/2003 DONE
Application received  7/30/2003  
Routing Off Site -Energy     
Mike P. will do energy review.