BLD-Final | 4/8/2004 | 4/9/2004 | 4/9/2004 | A | PASS |
Tony Young
|
|
|
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
corrections taken care of 4/9/2004 12:44:38 PM
|
BLD-Grading Inspection | 4/9/2004 | 4/9/2004 | 4/9/2004 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Final | 4/9/2004 | 4/9/2004 | 4/9/2004 | P | PASS |
Tony Young
|
|
|
BOBphone#; ###-####
corrections were made ok 4/9/2004 3:34:27 PM
|
DOC - Permit Finaled | 4/9/2004 | 4/9/2004 | 4/9/2004 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 4/9/2004 12:44:43 PM
|
DOC - Permit Finaled | 4/9/2004 | 4/9/2004 | 4/9/2004 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 4/9/2004 3:34:28 PM
|
BLD-Final | 4/5/2004 | 4/7/2004 | 4/7/2004 | A | FAIL |
Troy James
|
|
|
bob fink; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need plumbing final. Seal all electrical boxes at exterior walls throughout house. Provide handrail to stairs back of garage. Provide vent well at condensate lines back of house, due to the drains installed below grade.4/7/2004 10:15:56 AM 4/7/2004 10:20:13 AM
|
BLD-Other | 1/16/2004 | 1/16/2004 | 1/16/2004 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/16/2004 at 7:36:38 AM. Contact: ###-####.
int. shear ok 1/16/2004 4:35:15 PM
|
BLD-Framing/Rough-in | 1/12/2004 | 1/13/2004 | 1/13/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 1:07:07 PM. Contact: ###-####.
energy ok also,,need int. later 1/13/2004 2:26:36 PM
|
BLD-Framing/Rough-in | 1/9/2004 | 1/12/2004 | 1/12/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/9/2004 at 3:44:32 PM. Contact: ###-####.
c/n still posted, ok to insulate 1/12/2004 11:15:20 AM
|
BLD-Framing/Rough-in | 1/8/2004 | 1/9/2004 | 1/9/2004 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/8/2004 at 9:49:27 AM. Contact: (208) 841-8
correction notice posted 1/9/2004 3:27:23 PM
|
BLD-Framing/Rough-in | 12/23/2003 | 12/26/2003 | 12/26/2003 | A | PART |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
exterior shear ok 12/26/2003 12:04:45 PM
|
BLD-Framing/Rough-in | 12/19/2003 | 12/22/2003 | 12/22/2003 | P | NR |
Tony Young
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
conf. only on shear 12/22/2003 3:28:06 PM
|
BLD-Foundation | 10/31/2003 | 11/3/2003 | 11/3/2003 | P | PART |
Tony Young
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Darla Downs
wip 11/3/2003 1:59:22 PM
|
BLD-Grading Inspection | 10/31/2003 | 10/31/2003 | 10/31/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by geotechnical engineer.
|
BLD-Footing | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PART |
Tony Young
|
|
|
TONY; Phone #: ###-#### Internet Inspection Request from: Annette Moore
poured 10/31/2003 3:33:44 PM
|
BLD-Footing | 10/29/2003 | 10/30/2003 | 10/30/2003 | A | NR |
Steven Webb
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Darla Downs Need subgrade approval from TR. 10/30/2003 12:04:00 PM
|
BLD-Footing | 10/28/2003 | 10/29/2003 | 10/29/2003 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/28/2003 at 5:07:24 PM. tony g. called to canc this inspection will set up for 10-29-03am ///dld 12:51
|
Issue PAID IN FULL permit | | | 10/24/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2003 | | |
|
|
|
|
Print Occupancy Form | | | 10/7/2003 | | |
|
|
|
|
Permit Ready to Issue | | | 10/7/2003 | | |
|
|
|
|
Telephone call | | | 10/7/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 10/6/2003 | 10/6/2003 | 10/6/2003 | | PASS |
Dan Overy
|
|
|
|
Plan Review Report | | | 10/6/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/6/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/2/2003 | | 10/6/2003 | | PASS |
|
|
|
|
Routing - FIRE | 10/1/2003 | | 10/2/2003 | | DONE |
|
|
|
No fire sprinklers required (Highlands Hackberry 4)
|
Routing - Erosion and Sediment | 9/30/2003 | | 10/1/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING | 9/29/2003 | | 9/30/2003 | | PASS |
|
|
|
Required on site turnaround approved per CCNR's & ACHD's Scott Rudel per plat note #1. AKT
|
Routing - PUBLIC WORKS | 9/26/2003 | | 9/26/2003 | | PASS |
|
|
|
Approved minor revision of driveway. Routed to T. Records for review of resubmittal. AKT
|
Routing - PLANNING | 8/25/2003 | | 9/23/2003 | | FAIL |
|
|
|
Msg. for Tony: Must comply w/ACHD turnaround standards--must provide approval or show CCNR drawings per plat. Resubmitted w/ letter from neighborhood 9/22. still needed: approveable driveway turnaround. Rediscussed adjacent lot w/ Tony (driveway approved in 2001 by R. Jones). Spoke with Scott Rudel at ACHD to outline plat note & implications of such. Talked w/ Tony about 3 alternatives & driveway must be limited to 33' wide in front setback. Will redesign driveway to provide adequate turnaround. AKT
|
Routing - PLANNING | 8/7/2003 | | 8/8/2003 | | FAIL |
|
|
|
Spoke w/ Tony a.m.:On site turn around required per plat note #1. He spoke with developer--directed him that it must be per CCNR's b/c they are incorporated into plat. AKT
|
Routing - PUBLIC WORKS GRADING | 8/5/2003 | | 8/7/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter from Boise Public Works attached to the plans.
|
Routing - PUBLIC WORKS | 8/7/2003 | | 8/7/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Application received | | | 8/5/2003 | | |
|
|
|
|
Pending Assignment by DJO | 8/5/2003 | | | | |
Dan Overy
|
|
|
|