Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01884
StatusFinaled
Name GABRIELLI BUILDS INC
Site Address 4590 N TORRIDON WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3374 sq. ft. two story single family dwelling with a 827 sq. ft. attached three car garage, a 84 sq. ft. covered entry porch and a 334 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof stystem and 30 ft. defensible space shall be maintained. (1st floor 1736 sq. ft.)(2nd floor 1638 sq. ft.) PC #599 DJO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/8/20044/9/20044/9/2004APASS
DetailsTony Young
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
corrections taken care of 4/9/2004 12:44:38 PM
BLD-Grading Inspection4/9/20044/9/20044/9/2004 PASS
DetailsRita DeYoung
Final grading and drainage approved.
BLD-Final4/9/20044/9/20044/9/2004PPASS
DetailsTony Young
BOBphone#; ###-####
corrections were made ok 4/9/2004 3:34:27 PM
DOC - Permit Finaled4/9/20044/9/20044/9/2004PPASS
DetailsTony Young
Finaled by inspector at 4/9/2004 12:44:43 PM
DOC - Permit Finaled4/9/20044/9/20044/9/2004PPASS
DetailsTony Young
Finaled by inspector at 4/9/2004 3:34:28 PM
BLD-Final4/5/20044/7/20044/7/2004AFAIL
DetailsTroy James
bob fink; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need plumbing final. Seal all electrical boxes at exterior walls throughout house. Provide handrail to stairs back of garage. Provide vent well at condensate lines back of house, due to the drains installed below grade.4/7/2004 10:15:56 AM 4/7/2004 10:20:13 AM
BLD-Other1/16/20041/16/20041/16/2004PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 1/16/2004 at 7:36:38 AM. Contact: ###-####.
int. shear ok 1/16/2004 4:35:15 PM
BLD-Framing/Rough-in1/12/20041/13/20041/13/2004PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/12/2004 at 1:07:07 PM. Contact: ###-####.
energy ok also,,need int. later 1/13/2004 2:26:36 PM
BLD-Framing/Rough-in1/9/20041/12/20041/12/2004APART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/9/2004 at 3:44:32 PM. Contact: ###-####.
c/n still posted, ok to insulate 1/12/2004 11:15:20 AM
BLD-Framing/Rough-in1/8/20041/9/20041/9/2004PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 1/8/2004 at 9:49:27 AM. Contact: (208) 841-8
correction notice posted 1/9/2004 3:27:23 PM
BLD-Framing/Rough-in12/23/200312/26/200312/26/2003APART
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
exterior shear ok 12/26/2003 12:04:45 PM
BLD-Framing/Rough-in12/19/200312/22/200312/22/2003PNR
DetailsTony Young
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
conf. only on shear 12/22/2003 3:28:06 PM
BLD-Foundation10/31/200311/3/200311/3/2003PPART
DetailsTony Young
dave; Phone #: ###-#### Internet Inspection Request from: Darla Downs
wip 11/3/2003 1:59:22 PM
BLD-Grading Inspection10/31/200310/31/200310/31/2003 PASS
DetailsRita DeYoung
Footing subgrade approved by geotechnical engineer.
BLD-Footing10/31/200310/31/200310/31/2003PPART
DetailsTony Young
TONY; Phone #: ###-#### Internet Inspection Request from: Annette Moore
poured 10/31/2003 3:33:44 PM
BLD-Footing10/29/200310/30/200310/30/2003ANR
DetailsSteven Webb
tony; Phone #: ###-#### Internet Inspection Request from: Darla Downs Need subgrade approval from TR. 10/30/2003 12:04:00 PM
BLD-Footing10/28/200310/29/200310/29/2003PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 10/28/2003 at 5:07:24 PM. tony g. called to canc this inspection will set up for 10-29-03am ///dld 12:51
Issue PAID IN FULL permit  10/24/2003 DONE
Inspection Record Card- Bld  10/7/2003  
Print Occupancy Form  10/7/2003  
Permit Ready to Issue  10/7/2003  
Telephone call  10/7/2003 DONE
left mess that permit is ready
Plan assigned to (DJO)10/6/200310/6/200310/6/2003 PASS
DetailsDan Overy
Plan Review Report  10/6/2003 DONE
Plans ACCEPTED BY PLAN CHECK  10/6/2003  
PLANS/APPL TAKEN TO FRONT DESK  10/6/2003 DONE
Routing - PLAN CHECK10/2/2003 10/6/2003 PASS
Routing - FIRE10/1/2003 10/2/2003 DONE
No fire sprinklers required (Highlands Hackberry 4)
Routing - Erosion and Sediment9/30/2003 10/1/2003 PASS
ESC approved with conditions attached to plans.
Routing - PLANNING9/29/2003 9/30/2003 PASS
Required on site turnaround approved per CCNR's & ACHD's Scott Rudel per plat note #1. AKT
Routing - PUBLIC WORKS9/26/2003 9/26/2003 PASS
Approved minor revision of driveway. Routed to T. Records for review of resubmittal. AKT
Routing - PLANNING8/25/2003 9/23/2003 FAIL
Msg. for Tony: Must comply w/ACHD turnaround standards--must provide approval or show CCNR drawings per plat. Resubmitted w/ letter from neighborhood 9/22. still needed: approveable driveway turnaround. Rediscussed adjacent lot w/ Tony (driveway approved in 2001 by R. Jones). Spoke with Scott Rudel at ACHD to outline plat note & implications of such. Talked w/ Tony about 3 alternatives & driveway must be limited to 33' wide in front setback. Will redesign driveway to provide adequate turnaround. AKT
Routing - PLANNING8/7/2003 8/8/2003 FAIL
Spoke w/ Tony a.m.:On site turn around required per plat note #1. He spoke with developer--directed him that it must be per CCNR's b/c they are incorporated into plat. AKT
Routing - PUBLIC WORKS GRADING8/5/2003 8/7/2003 PASS
DetailsRita DeYoung
Approved as Category 3 with conditions of approval in letter from Boise Public Works attached to the plans.
Routing - PUBLIC WORKS8/7/2003 8/7/2003 PASS
NORTHWEST BOISE SEWER DISTRICT
Application received  8/5/2003  
Pending Assignment by DJO8/5/2003    
DetailsDan Overy