Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD03-01902
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron
Customer NumberPCS #5757
ePlanReviewNo
Description
Micron Building #15 - FAb 3 - NF3 Bulk Distribution System * To construct a new 290 square foot reinforced concrete slab with a new 290 square foot structural steel shade cover and fence enclosure. This shade structure is being constructed approximately 72 feet east of Micron Building #15. This structure is for NF3 gas distribution suport. All construction per the approved plans and calculations on file. This area will lighted and have 110V power. This area shall comply with the outside storage requirements of the International Fire Code. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/3/20042/3/20042/3/2004PPASS
DetailsJim Storey
l/c isued
DOC - Permit Finaled2/3/20042/3/20042/3/2004PPASS
DetailsJim Storey
Finaled by inspector at 2/3/2004 4:00:48 PM
BLD-Final1/29/20041/29/20041/29/2004PPASS
DetailsJim Storey
final ok
FIRE-Final Inspection1/23/20041/26/20041/26/2004PPASS
DetailsRick Jackson
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection1/22/20041/23/20041/23/2004PFAIL
DetailsRick Jackson
STEVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs need resubmittals for review prior to sign off 1/23/2004 2:07:42 PM
FIRE-Final Inspection1/21/20041/22/20041/22/2004PFAIL
DetailsRick Jackson
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need NFPA 704 signs 1/22/2004 3:24:44 PM
Routing - PLAN CHECK1/20/2004 1/20/2004 DONE
Issue copy taken to front desk for Paul to pick up and office copy taken to records due to resubmittals given to fire and approved by Sam R.
Telephone call  1/20/2004 DONE
E-amiled Paul to let him know they are over here in the drawer for pick up.....1/20/04 1:00pm BAM
Plan Modification Accepted  1/16/2004 PASS
Resubmittal showing required details for approval of gas cylinder installation. REissue approved modified plans.
Print Occupancy Form  12/23/2003 DONE
Print Occupancy Form  12/23/2003 DONE
Print Occupancy Form  12/22/2003 DONE
Inspection Record Card- Bld  12/22/2003 DONE
BLD-Final12/17/200312/18/200312/18/2003ACANC
DetailsJim Storey
Steve; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes moved to pm 12/18/2003 10:12:58 AM
BLD-Final12/18/200312/18/200312/18/2003PPART
DetailsJim Storey
Steve; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to sing off upon fire approval. 12/18/2003 3:03:25 PM
Plan resubmittals received  12/10/2003 DONE
Received two sets of sheets A0,A2.0,P2.0,P2.1.1,P2.2.1 taken to Sam R.
BLD-Aging Inspection11/19/200311/19/200311/19/2003 PASS
DetailsJim Storey
pending final requst. 11/20/2003 7:24:17 AM
BLD-Footing9/15/20039/18/20039/18/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/15/2003 at 12:52:30 PM. Contact: ###-####. covered w specal insp. 9/18/2003 1:48:59 PM
BLD-Footing9/15/20039/17/20039/17/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/15/2003 at 12:51:43 PM. Contact: ###-####. placed under special insp. pending report to plan compliance. 9/17/2003 11:10:56 AM
BLD-Footing9/15/20039/16/20039/16/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/15/2003 at 12:51:00 PM. Contact: ###-####. rebar ok special insp.report pending. 9/16/2003 8:11:15 AM
Inspection Record Card- Bld  9/9/2003 DONE
Print Occupancy Form  9/9/2003 DONE
Telephone call  9/9/2003 DONE
will e-mail paul that permit is ready
CHANGE STATUS TO (R)  9/9/2003 DONE
permit is now ready
Issue & PRINT to be Invoiced  9/9/2003 DONE
Plan assigned to (JCM)8/11/20038/11/20039/8/2003 PASS
DetailsJohn Menard
9/8/2003 13:31:08 JCM - activity updated through activity BLDA022 from case BLD03-01902.
Routing - PLAN CHECK8/26/2003 9/8/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/8/2003 PASS
Routing - FIRE8/19/2003 8/26/2003 PASS
Approved for slab/cover construction only. NO installation of NF3 gas equipment allowed under this permit as no details were provided. Discussed with Paul Marcolina.
Routing - PLAN CHECK8/19/2003 8/19/2003 PASS
Plan Reviewer's activity  8/19/2003 PASS
Plan reviewed and aproved as submitted. JCM
Routing - PLANNING8/15/2003 8/18/2003 PASS
Routing - Erosion and Sediment8/13/2003 8/14/2003 PASS
Waiver letter. ESC waiver approved with conditions attached to plans.
Routing - PUBLIC WORKS8/11/2003 8/13/2003 PASS
Plans ACCEPTED BY PLAN TECH  8/13/2003 DONE
Received waiver letter and application. kmm
Routing - PLANNING Land Div8/11/2003 8/11/2003 PASS
Approved, site is over 5 acres in size.
Plans ACCEPTED BY PLAN TECH  8/11/2003 DONE
1. No ESC permit application.
2. No ESC prepared plans. Called Paul Marcolina, he will be faxing over permit application with waiver letter.
Fee Review-notes8/7/20038/7/20038/7/2003 DONE
Application received  8/7/2003  
Recd Pcfee & Taken To Pln CK  8/7/2003 DONE