Permit Information
Permit NumberBLD03-01925
StatusFinaled
Name COLE-MARR
Site Address 404 S 8TH ST Unit: B-100
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(COLE-MARR - 8TH STREET MARKETPLACE - SUITE 100-B) The fire sprinkler system is used to substitute for 1-hr fire-resistive construction of the building. To create a 1,944 square foot photography/art gallery in the basement of an existing building at 8th Street Market Place by combining 2 tenant spaces. Work is to include interior nonbearing walls, a new entrance door, 3 darkrooms, millwork, and interior finishes all per approved drawings and plan review report on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/16/2011  
First Notice 2/19/20042/19/2004 DONE
Permanent occupancy  2/19/2004 DONE
Perm. Occ. Cert. # 10002 issued 2-19-04 to Cole-Marr in the 8th St. Marketplace.
BLD-Framing/Rough-in11/17/200311/18/200311/18/2003ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/17/2003 at 12:05:01 PM. Contact: ###-####.
Permanent Occupancy 10/6/200310/6/2003 DONE
Details
FIRE-Final Inspection9/29/20039/29/20039/29/2003PPASS
DetailsRick Jackson
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore the fire panel is scheduled for complete replacement and the plans will be submitted to the city within a few weeks; this permit is okay for occupancy 9/29/2003 1:44:36 PM
BLD-Final9/29/20039/29/20039/29/2003PPASS
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 9/29/2003 1:40:14 PM
BLD-Final9/25/20039/26/20039/26/2003PCANC
DetailsTom Arcoraci
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/9/20039/10/20039/10/2003APASS
DetailsDave Hannah
DAVID- ###-#### ok to cover 9/10/2003 11:33:46 AM
Inspection Record Card- Bld  9/9/2003 DONE
Print Occupancy Form  9/9/2003 DONE
Permit Ready to Issue  9/9/2003 DONE
Telephone call  9/9/2003 DONE
Left message for james woodbury (applicant) and mark gier (architect) permit ready and fees due
Issue PAID IN FULL permit  9/9/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/5/2003 PASS
Plan assigned to (CJW)8/11/2003 9/5/2003 PASS
DetailsCarl Westfall
9/5/2003 15:22:44 CJW - activity updated through activity BLDA022 from case BLD03-01925.
Routing - PLAN CHECK9/3/2003 9/5/2003 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  9/3/2003 DONE
Resubmittal Sheet A1.0 (3 copies) and cover letter received and forwarded to Carl.
Routing - FIRE8/25/2003 9/2/2003 PASS
Routing - PLAN CHECK8/12/2003 8/25/2003  
(green tag) Failed first IBC plan review. IBC plan review started August 22, 2003 and finished August 25, 2003. A response from the architect was required. See the plan review report.
Routing - PUBLIC WORKS8/11/2003 8/12/2003 PASS
DetailsBrandi Dominguez
Plans ACCEPTED BY PLAN TECH  8/11/2003 DONE
Application received  8/8/2003  
Recd Pcfee & Taken To Pln CK  8/8/2003 DONE
Fee Review-notes8/8/20038/8/2003