BLD-Aging Inspection | 5/5/2005 | 5/5/2005 | 5/5/2005 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/5/2005 | 5/5/2005 | 5/5/2005 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 2/14/2005 | 2/14/2005 | 2/14/2005 | | DONE |
|
|
|
Drainage project found complete 2/14/05. R.Rokovitz
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
wip 8/2/2004 11:26:05 AM
|
BLD-Aging Inspection | 1/21/2004 | 1/21/2004 | 1/21/2004 | | DONE |
Dave Hannah
|
|
|
wip 1/21/2004 8:48:39 AM
|
Case Summary (BLD) | | | 11/5/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 10/6/2003 | | 10/21/2003 | | |
|
|
|
awaiting PW approval plans in hold box.
|
Plan resubmittals received | | | 10/21/2003 | | DONE |
|
|
|
Received five sets of sheets 1 thru 8 taken to Kathy.
|
Routing - PUBLIC WORKS | 10/21/2003 | | 10/21/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2003 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/21/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/21/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2003 | | DONE |
|
|
|
|
Plan assigned to (KMM) | 8/13/2003 | | 10/21/2003 | | PASS |
Kathy Miller
|
|
|
10/21/2003 14:45:59 KMM - activity updated through activity BLDA022 from case BLD03-01953.
|
Routing - PLAN CHECK | 9/30/2003 | | 10/6/2003 | | |
|
|
|
Plans in hold box waiting PW and Planning approval. kmm
|
Plan resubmittals received | | | 10/6/2003 | | DONE |
|
|
|
Received two copies of revised sheets Landscape plans. Put with plans. kmm
|
Routing - PLANNING | 10/6/2003 | | 10/6/2003 | | PASS |
|
|
|
Approved per DRH03-9 Mod. #1.
|
Routing - PLAN CHECK | 9/29/2003 | | 9/30/2003 | | |
|
|
|
Plans in hold box. Waiting for Planning to approve. kmm
|
Routing - PUBLIC WORKS | 9/30/2003 | | 9/30/2003 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian Murphy. kmm
|
Routing - PLANNING | 9/26/2003 | | 9/29/2003 | | FAIL |
|
|
|
Have asked the applicant to look at an alternative retention pond configuration for the 9th and River street location. This is not typically allowed.
|
Routing - FIRE | 9/18/2003 | | 9/25/2003 | | PASS |
|
|
|
resubmittal acceptable with scope limited to parking lot improvements shown
|
Routing - PLAN CHECK | 9/17/2003 | | 9/18/2003 | | |
|
|
|
|
Plan resubmittals received | | | 9/18/2003 | | DONE |
|
|
|
received two copies of revised sheets L.1 and a1.11. Put with plans. kmm
|
Routing - FIRE | 9/4/2003 | | 9/12/2003 | | FAIL |
|
|
|
application is inconsistent with plans. Letter faxed to applicant and architect explaining revisions necessary.
|
Plan resubmittals received | | | 9/8/2003 | | DONE |
|
|
|
Received two copies of revised site plan. Will put with plan when they are back from fire. Plans in hold box. kmm
|
Routing - PLUMBING | 9/3/2003 | | 9/4/2003 | | PASS |
|
|
|
ok
|
Routing - PUBLIC WORKS | 9/2/2003 | | 9/3/2003 | | FAIL |
|
|
|
|
Telephone call | | | 9/3/2003 | | DONE |
|
|
|
Spoke with Chip Gallagher, he will email Erstad to get me two copies of revised landscape plans. I will go ahead and continue routing. kmm
|
Routing - PLAN CHECK | 8/26/2003 | | 9/2/2003 | | |
|
|
|
hold box
|
Telephone call | | | 8/27/2003 | | PEND |
|
|
|
Plans in hold box, waiting complete resubmittals, per Mark. kmm
|
Routing - PLANNING | 8/26/2003 | | 8/26/2003 | | FAIL |
|
|
|
Plans submitted are the wrong out of date sets. Mark called and notified them that they need to be resubmitted. Plans put on HOLD.
|
Routing - Erosion and Sediment | 8/19/2003 | | 8/26/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans. Individual listed as RP is not certified by boise city. 10/15/03 Certified RP is Devin Wiggett.
|
Routing - PUBLIC WORKS | 8/15/2003 | | 8/19/2003 | | FAIL |
|
|
|
Requires drainage plan revision per Brian M. kmm
|
Routing - PLANNING Land Div | 8/13/2003 | | 8/13/2003 | | PASS |
|
|
|
For grading only. Do not issue building permit for structure. Appears to be two parcels on this site. Proposed building will be located on property line.
|
Plan routing begun/TENANTS | | | 8/13/2003 | | DONE |
|
|
|
|
Application received | | | 8/13/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/13/2003 | | DONE |
|
|
|
|