Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01993
StatusExpired
Name THOMAS HUNT
Site Address 10931 W SOUTHERLAND ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2463 sq. ft. two story single family dwelling with a 969 sq. ft. attached three car garage, a 266 sq. ft. covered entry porch and a 380 sq. ft. covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City. (1st floor 1375 sq. ft.)(2nd floor 1088 sq. ft.) PC #504 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference3/3/20083/3/20083/3/2008PCANC
DetailsMike Jordan
DOC - Permit Expired3/3/20083/3/20083/3/2008PPASS
DetailsMike Jordan
Appears that all trades are finaled. Permit has expired.
BLD-Final6/21/20046/21/20046/21/2004PFAIL
DetailsJim Sly
Thomas; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need F/P final...only. 6/21/2004 4:46:39 PM
BLD-Framing/Rough-in12/5/200312/5/200312/5/2003PPASS
DetailsRuss Owen
thomas; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Energy code compliance12/5/200312/5/200312/5/2003PPASS
DetailsRuss Owen
thomas; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Energy code compliance12/3/200312/4/200312/4/2003PFAIL
DetailsRuss Owen
THOMAS; Phone #: ###-#### Internet Inspection Request from: Darla Downs complete #2 on prior c/n. 12/4/2003 3:28:00 PM
BLD-Framing/Rough-in12/2/200312/2/200312/2/2003PPART
DetailsGeorge Slane
thomas-- ###-####
ok to insulate, verify item #2 c/n framing 12/2/2003 2:59:04 PM
Override - Parcel Holds  12/2/2003  
BLD-Framing/Rough-in11/25/200311/25/200311/25/2003PFAIL
DetailsRuss Owen
thomas ###-####
Override - Parcel Holds  11/25/2003  
BLD-Foundation9/23/20039/23/20039/23/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/23/2003 at 6:18:18 AM. Contact: ###-####. wip. 9/22/2003 5:27:29 PM
BLD-Footing9/20/20039/22/20039/22/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/20/2003 at 10:00:03 AM. Contact: ###-####. WIP. 9/21/2003 6:19:00 PM
Issue PAID IN FULL permit  9/16/2003 DONE
Inspection Record Card- Bld  8/22/2003 DONE
Telephone call  8/22/2003 DONE
Spoke with Thomas told permit ready & fees
CHANGE STATUS TO (R)  8/22/2003 DONE
Plan assigned to (DJO)8/21/20038/21/20038/21/2003 PASS
DetailsDan Overy
8/21/2003 16:50:14 DJO - activity updated through activity BLDA022 from case BLD03-01993.
Case Summary (BLD)  8/21/2003  
Plan Review Report  8/21/2003  
PLANS/APPL TAKEN TO FRONT DESK  8/21/2003 DONE
Plans ACCEPTED BY PLAN CHECK  8/21/2003  
Application received  8/18/2003  
Routing - PLANNING8/18/2003 8/18/2003 PASS
Routing - PUBLIC WORKS8/18/2003 8/18/2003 PASS
Pending Assignment by DJO8/18/2003    
DetailsDan Overy
Routing - PLAN CHECK8/18/2003