Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD03-01997
StatusFinaled
Name BEACHWOOD BUILDERS INC
Site Address 3457 S ANNETT AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1190 sq. ft. two story single family dwelling with a 462 sq. ft. attached two car garage, a 120 sq. ft. covered entry porch and concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City. (1st floor 846 sq. ft.)(2nd floor 344 sq. ft.) PC #502 DJO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/10/200312/10/200312/10/2003PPASS
DetailsTroy James
brian--call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final12/8/200312/8/200312/8/2003PFAIL
DetailsJim Storey
Brian --- please call first for garage code and access. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes min 5/8 by 5/8 dato 12/8/2003 3:54:59 PM
BLD-Final12/4/200312/5/200312/5/2003PFAIL
DetailsRuss Owen
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n front window hand rail in garage. 12/5/2003 1:19:40 PM
BLD-Energy code compliance10/1/200310/1/200310/1/2003PPASS
DetailsJim Storey
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in9/30/20039/30/20039/30/2003PPASS
DetailsJim Storey
steve; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Foundation9/3/20039/3/20039/3/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/3/2003 at 7:39:51 AM. Contact: ###-####. pwoi 9/3/2003 1:33:26 PM
BLD-Footing9/2/20039/2/20039/2/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/2/2003 at 7:19:47 AM. Contact: ###-####.
Issue PAID IN FULL permit  8/26/2003 DONE
CHANGE ISSUED DATE  8/26/2003  
Plan assigned to (DJO)8/20/20038/20/20038/20/2003 PASS
DetailsDan Overy
Plan Review Report  8/20/2003 DONE
Inspection Record Card- Bld  8/20/2003 DONE
Telephone call  8/20/2003 DONE
permit ready and fees due
Pending Assignment by DJO8/18/2003 8/20/2003 DONE
DetailsDan Overy
Routing - PLAN CHECK8/18/2003 8/20/2003 PASS
Plans ACCEPTED BY PLAN CHECK  8/20/2003  
PLANS/APPL TAKEN TO FRONT DESK  8/20/2003  
Application received  8/18/2003  
Routing - PLANNING8/18/2003 8/18/2003 PASS
Routing - PUBLIC WORKS8/18/2003 8/18/2003 PASS