Permit Information
Permit NumberBLD03-02002
StatusFinaled
Name CARRE'S CHOCOLATES
Site Address 803 W BANNOCK ST
Project NameBLOCK 44
Customer Number 
ePlanReviewNo
Description
(CARRE'S CHOCOLATES) This building is NOT fire sprinklered. To remodel an existing 1,100 square foot retail store for a new retail sales tenant. This tenant space is located within a 9,849 square foot, one story building. The restroom within this tenant space was created in 1994 and shall be maintained accessible to the disabled as defined by the standards in effect at that time. The 800 square foot basement has been converted to a crawl space and is NOT approved for occupancy. Work is to include interior nonbearing walls, millwork, and finishes all per the approved drawings and plan review report on file. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/3/2005  
First Notice 10/16/200310/16/2003 DONE
Permanent occupancy  10/16/2003 DONE
Perm. Occ. Cert. #9843 issued 10-15-03 to Carrie's Chocolates.
Permanent Occupancy 10/14/200310/14/2003 DONE
Details
BLD-Final10/9/200310/10/200310/10/2003APASS
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 10/10/2003 11:35:41 AM
Temporary occupancy  10/10/2003 DONE
Temp. Occ. Cert. #5010 issued 10-10-03 to Carre's Chocolates.
FIRE-Final Inspection10/9/200310/9/200310/9/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/9/2003 at 9:47:10 AM. Contact: ###-####.
BLD-Framing/Rough-in9/30/20039/30/20039/30/2003PPART
DetailsRuss Owen
dave ###-#### insulation in store room ok, also firewall almost complete. ok to finish. 9/30/2003 1:01:55 AM
BLD-Framing/Rough-in9/29/20039/29/20039/29/2003PPART
DetailsRuss Owen
###-#### dave neeed to insulate cooler also needs plumbing and electrical and need to see 2nd layer drywall. at 3 hr wall contrator on site notified. 9/28/2003 9:44:26 PM
Print Occupancy Form  9/29/2003 DONE
Inspection Record Card- Bld  9/29/2003 DONE
Permit Ready to Issue  9/29/2003 DONE
Telephone call  9/29/2003 DONE
Spoke with Matt and told permit ready & fees
Issue PAID IN FULL permit  9/29/2003 DONE
Routing - PLUMBING9/26/2003 9/26/2003 PASS
approved per plan and 2000 UPC
Routing - PLAN CHECK9/26/2003 9/26/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/26/2003 PASS
Plan assigned to (CJW)8/21/2003 9/26/2003 PASS
DetailsCarl Westfall
9/26/2003 15:43:08 CJW - activity updated through activity BLDA022 from case BLD03-02002.
Routing - FIRE9/18/2003 9/25/2003 PASS
Approved with no written review comments, subject to satisfactory field inspection.
Routing - PLAN CHECK8/22/2003 9/18/2003 PASS
IBC plan review started September 17, 2003 and finished the next day. The drawings were approved with clarifications. See the plan review report.
Plan resubmittals received  8/27/2003 DONE
Resubmittal sheet P1.0 received (3 copies) and forwarded to Carl Westfall.
Routing - PUBLIC WORKS8/21/2003 8/22/2003 PASS
Routing - PLUMBING8/22/2003 8/22/2003  
Failed first UPC review. need plumbing plan
Plans ACCEPTED BY PLAN TECH  8/19/2003 DONE
Less than $25,000
1. No plumbing or mechanical plans.
Application received  8/18/2003  
Recd Pcfee & Taken To Pln CK  8/18/2003 DONE
Fee Review-notes8/18/20038/18/2003