Case Summary (BLD) | | | 9/26/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/29/2004 | 1/29/2004 | | DONE |
|
|
|
|
BLD-Final | 1/28/2004 | 1/29/2004 | 1/29/2004 | P | PASS |
Russ Owen
|
|
|
Larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. ok perm oc. 1/29/2004 3:38:43 PM
|
First Notice | | 1/29/2004 | 1/29/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/29/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 9953 issued 1-29-04 to the Que Huong 2 restaurant.
|
FIRE-Final Inspection | 1/28/2004 | 1/28/2004 | 1/28/2004 | P | PASS |
Rick Jackson
|
|
|
fire/life safety okay; will max occupant load for structural inspector 1/28/2004 3:53:49 PM
|
BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | PART |
Russ Owen
|
|
|
Larry --- please call first for access. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. walls ok , 1 hr shaft not built. 12/9/2003 4:31:13 PM
|
Plan Reviewer's activity | | | 11/19/2003 | | |
|
|
|
Architect has provided some small addendum sheets concerning this project. There is an existing rear exit door (was covered by a furred wall at former restroom) so a new one will not be provided. Because of this existing door, the restrooms will be moved slightly toward the front of the space and the water-heater/service sink closet will be relocated near the rear wall. This will allow minimum required clearances to the rear exit door. Addendum copies provided to the inspector and to the Records Department.
|
Issue PAID IN FULL permit | | | 11/5/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/3/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/3/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/3/2003 | | DONE |
|
|
|
Spoke with Pat told permit ready & fees
|
Plan assigned to (JCB) | 8/21/2003 | | 11/3/2003 | | PASS |
Jason Blais
|
|
|
11/3/2003 08:35:08 JCB - activity updated through activity BLDA022 from case BLD03-02014.
|
Routing - PLAN CHECK | 10/17/2003 | | 11/3/2003 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
Plan resubmittals received | | | 10/29/2003 | | DONE |
|
|
|
Received transmittal letter with two copies of structural calculations, two sets of A1.0,A2.1,A3.1,A3.2,M1.0,P1.0,two of E1.0,EN1.1 taken to Jason B.
|
Routing - PLUMBING | 10/16/2003 | | 10/17/2003 | | PASS |
|
|
|
per resubmitted plans dated 10/15/03 and 2000 upc
|
Routing - PLAN CHECK | 9/17/2003 | | 10/16/2003 | | FAIL |
|
|
|
Resubmittal plans did not adequately address or address some issues at all from the original plan review report. Second plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Resubmittal plans to route to Plumbing for review.
|
Plan resubmittals received | | | 10/15/2003 | | DONE |
|
|
|
two sets of sheets A1.0,A2.1,A3.1,M1.0,P1.0,E1.0,E1.0,EN1.1, taken to Jason.
|
Routing - FIRE | 9/10/2003 | | 9/16/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 9/10/2003 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 8/28/2003 | | 9/10/2003 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
|
Routing - PLUMBING | 8/27/2003 | | 8/28/2003 | | FAIL |
|
|
|
vent all fixtures(floor drains), mop sink required, move all floor sinks out from under cabinets and equipment, provide a fixture schedule, 1500 gal. grease interceptor required, show all fixtures required by CDHD and piping.
|
Routing - PUBLIC WORKS | 8/21/2003 | | 8/27/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/25/2003 | | DONE |
|
|
|
Resubmittal sheet EN1.1 showing the comp check report submitted and put with plans currently routing.
|
Additional plans submitted | | | 8/20/2003 | | DONE |
|
|
|
Received three copies of sheet E1.0 energy compliance. Put with plans. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 8/19/2003 | | DONE |
|
|
|
1. Need owners signature on "Design Professional" sheet.
2. Need applicants signature on Certificate of Value sheet.
3. No energy compliance/worksheets.
Called and faxed documents to Pat Dalgleish/Olson and Associates to have signed and fax back.
8/20/03 Received signed Design Professional sheet and signed cert. of value. Put with file and plans. kmm
|
Application received | | | 8/19/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/19/2003 | | DONE |
|
|
|
|
Fee Review-notes | 8/19/2003 | 8/19/2003 | | | |
|
|
|
|