Case Summary (BLD) | | | 5/20/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/19/2016 | | DONE |
|
|
|
|
BLD-Final | 7/29/2004 | 7/30/2004 | 7/30/2004 | P | NH |
Troy James
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
No access to house. Need bond set for landscaping per terry records. 7/30/2004 2:19:12 PM
|
BLD-Final | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | PASS |
Troy James
|
|
|
|
DOC - Permit Finaled | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 7/30/2004 4:12:45 PM
|
FIRE-Final Inspection | 7/28/2004 | 7/28/2004 | 7/28/2004 | A | PASS |
Rick Jackson
|
|
|
fire sprinklers finalled; smoke detectors tested okay 7/28/2004 12:13:42 PM
|
FIRE-Sprinkler Rough-in | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/29/2004 at 7:49:20 AM. Contact: ###-####. Okay to cover 4/29/2004 2:56:03 PM
|
BLD-Framing/Rough-in | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/29/2004 at 7:49:45 AM. Contact: ###-####.
|
BLD-Energy code compliance | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/29/2004 at 7:50:09 AM. Contact: ###-####.
|
FIRE-Sprinkler Rough-in | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 4:10:31 PM. Contact: ###-####. Need approved plans; tenting problems; water meter is 3/4 inch - plans show 1 inch; head overspaced in game room 4/27/2004 10:11:19 AM
|
BLD-Framing/Rough-in | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 4:11:09 PM. Contact: ###-####.ok to cover after firew sprinkler r/i sign off 4/27/2004 9:37:59 AM
|
BLD-Final | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 4:11:49 PM. Contact: ###-####.
|
BLD-Energy code compliance | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 4:12:09 PM. Contact: ###-####.
|
BLD-Conference | 4/27/2004 | 4/27/2004 | 4/27/2004 | P | PART |
Rick Jackson
|
|
|
Per Dave Miller the sprinkler flow switch will allowed to activate an outside alarm device instead of connection to the smoke detectors; this info was relayed to Todd of Peak Electric 4/27/2004 3:09:10 PM
|
BLD-Framing/Rough-in | 4/23/2004 | 4/23/2004 | 4/23/2004 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/23/2004 at 9:09:14 AM. Contact: ###-####. c/n on site ok to insulate 4/23/2004 4:49:57 PM
|
BLD-Other | 3/24/2004 | 3/25/2004 | 3/25/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 4:30:41 PM. Contact: ###-####. shear ok ext 3/25/2004 1:54:06 PM
|
BLD-Framing/Rough-in | 3/23/2004 | 3/24/2004 | 3/24/2004 | A | CANC |
Dave Hannah
|
|
|
shear wall inspection please///robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 3/24/2004 | 3/24/2004 | 3/24/2004 | P | FAIL |
Dave Hannah
|
|
|
shear wall inspection please///robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to renail per schedule and add fl/fl mst48 stapes 3/24/2004 2:10:29 PM
|
BLD-Foundation | 12/30/2003 | 12/31/2003 | 12/31/2003 | P | PART |
Dave Hannah
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Barbara Moore shop walls ok to place concrete 12/31/2003 1:28:43 PM
|
BLD-Footing | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Dave Hannah
|
|
|
Jay; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes shop ftg 12/23/2003 10:37:03 AM
|
BLD-Grading Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade for RV garage has been approved by the geotechnical engineer
|
BLD-Foundation | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PART |
Dave Hannah
|
|
|
jake; Phone #: ###-#### Internet Inspection Request from: Darla Downs upper crawel wall 12/12/2003 8:08:31 AM
|
BLD-Grading Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 | | PASS |
Rita DeYoung
|
|
|
All remaining footing subgrade, EXCEPT FOR THE DETACHED RV GARAGE, is approved.
|
BLD-Foundation | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PART |
Troy James
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 12/2/2003 | 12/2/2003 | 12/2/2003 | P | PART |
Dave Hannah
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second level retaining wall ok to cast 12/2/2003 1:59:39 PM
|
BLD-Footing | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PART |
Dave Hannah
|
|
|
retaining wall footing upper level 11/26/2003 3:27:51 PM
|
BLD-Grading Inspection | 11/26/2003 | 11/26/2003 | 11/26/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade for the lower of the two retaining walls that are located along the eastern property line.
|
BLD-Footing | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | CANC |
Dave Hannah
|
|
|
jay-- ###-####
|
BLD-Foundation | 11/20/2003 | 11/20/2003 | 11/20/2003 | P | PART |
Dave Hannah
|
|
|
Jay; Phone #: ###-#### Internet Inspection Request from: Aimee Hughesretainnig wall west side of basement 11/20/2003 1:36:04 PM
|
BLD-Grading Inspection | 11/17/2003 | 11/17/2003 | 11/17/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade for the retaining wall on the west side of the house.
|
BLD-Footing | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | NR |
Dave Hannah
|
|
|
|
BLD-Footing | 11/12/2003 | 11/14/2003 | 11/14/2003 | A | NR |
Dave Hannah
|
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Foundation | 11/12/2003 | 11/14/2003 | 11/14/2003 | A | NR |
Dave Hannah
|
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Concrete | 11/13/2003 | 11/13/2003 | 11/13/2003 | A | PART |
Dave Hannah
|
|
|
upper retainning wall ok to pour
|
BLD-Footing | 11/7/2003 | 11/10/2003 | 11/10/2003 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/7/2003 at 12:40:03 PM. Contact: ###-####.
|
BLD-Concrete | 11/7/2003 | 11/7/2003 | 11/7/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/7/2003 at 5:05:15 AM. Contact: ###-####. basement walls and retaining wall footings 11/7/2003 12:38:41 PM
|
BLD-Grading Inspection | 11/7/2003 | 11/7/2003 | 11/7/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade for retaining wall on eastern property line has been approved by the geotechnical engineer.
|
BLD-Footing | 10/30/2003 | 10/31/2003 | 10/31/2003 | P | PASS |
Tom Arcoraci
|
|
|
Kurt; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Grading Inspection | 10/30/2003 | 10/30/2003 | 10/30/2003 | | PASS |
Rita DeYoung
|
|
|
Basement footing subgrade has been approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 9/19/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 9/10/2003 | 9/10/2003 | 9/18/2003 | | PASS |
Dan Overy
|
|
|
9/18/2003 09:57:35 DJO - activity updated through activity BLDA022 from case BLD03-02023.
|
Plan Reviewer's activity | | | 9/18/2003 | | DONE |
|
|
|
received new engineered sections. retaining wall at covered porch area relocated to carry roof/deck loads. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/18/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/18/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/18/2003 | | DONE |
|
|
|
permit ready and fees due
|
Case Summary (BLD) | | | 9/10/2003 | | |
|
|
|
|
Plan Review Report | | | 9/10/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 9/10/2003 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/10/2003 | | |
|
|
|
waiting for engineered sections for strip footings, column footings/pier pads and lintel. before issuing, retaining wall design and grading will be resolved.
|
Routing - Erosion and Sediment | 9/2/2003 | | 9/3/2003 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 9/3/2003 | | 9/3/2003 | | DONE |
|
|
|
This lot requires the building to be provided with an NFPA 13D fire sprinkler system including all closets, bathrooms and attached garages (Nativa Terrra, Block 6, Lot 7)
|
Routing - PLANNING | 9/2/2003 | | 9/2/2003 | | PASS |
|
|
|
Rerfer to Sev Jones per CFH98-0002
|
Routing - PUBLIC WORKS | 9/2/2003 | | 9/2/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/19/2003 | | 8/29/2003 | | PASS |
Rita DeYoung
|
|
|
APPROVED AS CATEGORY 2 BY CFH03-00016
|
Application received | | | 8/19/2003 | | |
|
|
|
|
Pending Assignment by DJO | 8/19/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 9/3/2003 | | | | |
|
|
|
|