| BLD-Final | 2/6/2004 | 2/6/2004 | 2/6/2004 | P | PASS |
Dave Hannah
|
|
|
###-#### tony keen ok for occ 2/6/2004 2:29:02 PM
|
| Letter of compliance | | | 2/6/2004 | | DONE |
|
|
|
Letter of Compliance issued 2-6-04.
|
| Inspection Record Card- Bld | | | 2/3/2004 | | DONE |
|
|
|
|
| (F) Reprint permit | | | 12/17/2003 | | |
|
|
|
|
| Issue PAID IN FULL permit | | | 12/12/2003 | | DONE |
|
|
|
|
| Inspection Record Card- Bld | | | 12/5/2003 | | DONE |
|
|
|
|
| Telephone call | | | 12/5/2003 | | DONE |
|
|
|
THEY CALLED & PERMIT READY & FEE GIVEN 12-5-03 1:11 ///DLD
|
| CHANGE STATUS TO (R) | | | 12/5/2003 | | DONE |
|
|
|
|
| Routing - PLAN CHECK | 12/4/2003 | | 12/4/2003 | | PASS |
|
|
|
Approved as red-lined on plans and attached plan review reports by all reviewing agencies. Routing to permit desk.
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2003 | | PASS |
|
|
|
To permit desk to prepare for issuing of permit.
|
| Plan assigned to (DRS) | 8/22/2003 | | 12/4/2003 | | PASS |
Dan Stuart
|
|
|
12/4/2003 11:15:12 DRS - activity updated through activity BLDA022 from case BLD03-02029.
|
| Routing - FIRE | 12/3/2003 | | 12/4/2003 | | PASS |
Bill Alexander
|
|
|
|
| Telephone call | | | 12/3/2003 | | DONE |
|
|
|
Called IBI Tanks, Caldwell, ID & Ontario, OR., ###-####, and talked with Scott concerning tank design. Designed per UL-142, Double wall tank (tank W/I tank) with 125% of liquid capacity in outer tanks with leakage detection. Discussed what would happen if piping between generators was broken what keep the fuel from draining onto the floor, etc. Scott said anti siphon device used to close off opening from tank to pipes to prevent spills. 2000 IBC Sec.Section 414.5.5 states that spill & secondary containment is to be provided when required by the 2000 IFC. I am routing the plans with this data / information to the code analyst for determination of requirements.
|
| Print Pending Permit.LaserJet4 | | | 12/2/2003 | | |
|
|
|
|
| Case Summary (BLD) | | | 12/2/2003 | | |
|
|
|
|
| Case Summary (BLD) | | | 12/2/2003 | | |
|
|
|
|
| Routing - PLAN CHECK | 11/19/2003 | | 12/2/2003 | | PEND |
|
|
|
Resubmittals received. Routing back to fire code analyst for re-review.
|
| Telephone call | | | 11/26/2003 | | DONE |
|
|
|
Call from Dave Cutbirth. No existing containment at site but the double wall tank used to store fuel qualifies as spill contol & secondary containment based on supplier, Tim Horting, Western States Equipment. I got phone number for Tim Horting, ###-####, to call for verification.
|
| Plan Reviewer's activity | | | 11/26/2003 | | DONE |
|
|
|
Found IFC reference Sec. 202, Deffinitions, tying into IBC Sec. 307.9, looking up 'Hazardous Group H' which has an exception stating "occupancies as provided for in the IBC shall not be classified in Group "H" but shall be classified in the occupancy which they most nearly resemble", same basic language in IBC. So will not be an "H" occupancy under either IFC or IBC.
|
| Plan Reviewer's activity | | | 11/25/2003 | | DONE |
|
|
|
Received e-mail from Will Winslow reviewing his thoughts on the spill & secondary containment requirements and if they would be applicable. He provided two scenerios. On stating that the spill and containment were required per the IFC and that they were required if an "H" occupancy. This would not be and "H" occupancy and thus not required.
The other interpretation would be that spill and secondary comtainment is required whebever the Maximum Allowable Quantities of hazardous material are exceeded regardless of occupancy use group. He felt this interpretation made more sense considering the potential hazards if there were to be a fire and spill and secondary containment was not provided.
|
| Telephone call | | | 11/25/2003 | | DONE |
|
|
|
Call to Will Winslow, Haz Mat Expert and member of IFC Committee. Ask him concerning new section in IBC, Sec. 307.9, item 5 which says that closed system with combustible products that serve equipment are not to be classified as "H" occupancy even when the combustible product on hand exceeds the allowable limits. I ask if this was the intent of this code section, if he new where a similar statement was made in the IFC and if a double wall tank used for the deisel fuel, designed per UL 142 qualified as a providing compliance for spill control & secondary containment requirements. He felt this code section did intend to modify the use group classification so not and "H" occupancy, he would check the IFC but did not know of a similar code section but the intent was for the IBC to declare occupancy use group - not the IFC, and he felt the double wall tank would satisfy the spill and containment requirements since this was an "H" occupancy requirement which this occupancy use would not be. I said that section 414.5.5, Spill control, drainage & containment, referenced as still needing to be complied with in Sec. 307.9, did not reference an "H" occupancy but was required for storage of hazardous materials when required by the IFC. He will research and get back to me.
|
| Telephone call | | | 11/25/2003 | | DONE |
|
|
|
Called for Dave Cutbirth, DC Engineering and got Aaron. I ask him questions about existing containment at site and if there is an existing fire separation between the two areas (Loading Bay & Office). Aaron didi not know but will pass on to Dave and Dave will call me back this time.
|
| Telephone call | | | 11/24/2003 | | DONE |
|
|
|
Call from Bill Litzebaur, Lea Electric, applicant and contractor for project. He had gone to the field and verified that there were 1-hour walls in place as occupancy separation and said the existing doors were labeled as 1-1/2 hour assembly with closers.
|
| Telephone call | | | 11/21/2003 | | DONE |
|
|
|
Call from John Gordon, DC Engineering saying that Dave Cutbirth was out of office but would call me on 11/24/03.
|
| Telephone call | | | 11/20/2003 | | DONE |
|
|
|
Call to Bill Litzebaur, Lea Electric, applicant, to see if I had received all of the resubmittal documents from DC Engineering. He said he had presented all he had but would check with Dave Cutbirth, DC Engineering to be sure. I told him the resubmittals had not addressed all of the fire code analyst comments and I would like them complete before I routed back to them.
|
| Plan resubmittals received | | | 11/19/2003 | | DONE |
|
|
|
Received transmittal letter with two sets of sheets E1,E2,E2.1,E4.0,M1.0, taken to Dan S.
|
| Routing - PLAN CHECK | 10/16/2003 | | 10/21/2003 | | FAIL |
|
|
|
Plan was failed by fire code analyst and based on quantities of deisel fuel, CL2, 950 gallons declared by applicant, for emergency generators % verification per fire code analyst, the generator room is classified as an "H2" occupancy which has specific separation and design requirements. Talked with Victoria Moore, Lea Electric, who transferred me to Bill. Bill said he had received the review comments from
Sam Rogers & D&C Engineering was working on plan resubbitals & response and had promised them to Lea Electric on Thursday, 10/23/03, and they would resubmit to Boise City.
|
| Routing - FIRE | 10/7/2003 | | 10/10/2003 | | FAIL |
|
|
|
10/10 - Called Jared Miller, Elkhorn engineers, re. need for piped fill line and vent line not shown on plans. He'll check plans and call back on Monday. Keep plans on hold
10/15 - Additional information received to allow completion of plan review. REsubmittal required; for change to H occpancy and related Haz Mat requirements.
|
| Routing - PLAN CHECK | 10/7/2003 | | 10/7/2003 | | FAIL |
|
|
|
Routed back to fire code analyst for further review.
|
| Routing - FIRE | 9/26/2003 | | 10/3/2003 | | FAIL |
|
|
|
Hold for additional info to be provided by DC engr'g
|
| Routing - PLAN CHECK | 8/22/2003 | | 9/26/2003 | | PEND |
|
|
|
Work has been done without permit and it is uncertain of inspections. A permit for electrical, ELE03-01801 was issued and tied to a project at 1221 Idaho; a mechanical permit, MEC03-1801. There are two fire permits, FIR03-00472 & FIR03-00466 that may also be connected to this project.Routing to fire code analyst for review.
|
| Plans ACCEPTED BY PLAN TECH | | | 8/21/2003 | | DONE |
|
|
|
Per Dan Stuart.
|
| Application received | | | 8/20/2003 | | |
|
|
|
|
| Recd Pcfee & Taken To Pln CK | | | 8/20/2003 | | |
|
|
|
|
| Fee Review-notes | 8/20/2003 | 8/20/2003 | | | |
|
|
|
the payment for the plan check had to be re-added in, fees were backed out because of a overpayment.
|