Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02060
StatusFinaled
Name USTICK GROVE CLUB HOUSE
Site Address 9220 W USTICK RD
Project NameUstick Grove Estates
Customer Number 
ePlanReviewNo
Description
Ustick Grove Estates - Club House * To construct a new 4,260 sq.ft. two story, wood framed, club house for the residences of the mobile home park. The first floor is 2,435 sq.ft. A-3 assembly occupancy, the second floor is 1,835 sq.ft. noncombustible storage. NOTE: There can not be any vehicles parked, stored or repaired in the hobby/laundry area, and the second floor can not have any habital spaces or areas. All construction per the approved plans and attached comment list. MJP CUP03-00029 PC#516-03
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 12/17/20044/26/2005 DONE
First Notice Sent 11/15/20044/26/2005 DONE
Permanent occupancy UNPAID FEE  12/17/2004 DONE
Perm. Occ. Cert. # 10389 issued 12-17-04 to the Ustick Grove Clubhouse.
BLD-Final12/10/200412/10/200412/10/2004PPASS
DetailsJim Sly
Internet Inspection Request from: Jan Rice \ OK for Perm Occ. :) 12/10/2004 3:14:48 PM 12/10/2004 3:15:04 PM
Permanent Occupancy 12/10/200412/10/2004 DONE
Details
CHANGE STATUS TO (ISS)  12/10/2004 DONE
per jim sly change status not fn yet/mls
DOC - Permit Finaled11/15/200411/15/200411/15/2004APASS
DetailsCarol Montgomery
Finaled by inspector at 11/15/2004 8:42:04 AM
BLD-Framing/Rough-in11/10/200411/15/200411/15/2004ANR
DetailsJim Sly
Scott; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
FIRE-Final Inspection11/12/200411/15/200411/15/2004AFAIL
DetailsTroy Cobbley
Smoke detector did not work 11/15/2004 8:24:21 AM
FIRE-Final Inspection11/15/200411/15/200411/15/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled 11/15/2004 10:39:55 AM
Code Occupancy Approval11/15/200411/12/200411/12/2004APASS
DetailsCarol Montgomery
Meets compliance withthe CU. Passed. 11/15/2004 8:42:01 AM
FIRE-Final Inspection11/10/200411/12/200411/12/2004AFAIL
DetailsTroy Cobbley
Provide photo detector or push to silence feature at kitchen. Provide occupant load sign. Provide blank on exit door from laundry. Provide building address 11/12/2004 8:53:12 AM
Application received  11/10/2004 DONE
Drainage project complete 11/10/04. G.Irons OK for Cathy W. to sign permanent occupancy card 12/18/04.
FIRE-Conference11/9/200411/9/200411/9/2004PDONE
DetailsTroy Cobbley
Scott; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Conference10/19/200410/20/200410/20/2004APART
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need to meet with Dixie and HVAC Contr. 10/20/2004 3:17:20 PM
BLD-Conference9/16/20049/16/20049/16/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/16/2004 at 9:31:10 AM. Contact: ###-####.
BLD-Energy code compliance8/16/20048/17/20048/17/2004APASS
DetailsJim Sly
SCOTT; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Energy code compliance8/17/20048/17/20048/17/2004PPASS
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Frame pass......all penitrations in floor/ceiling assembly to have ceiling dampers exept 1 at N. E. corner. all ceilings are insulated.....No attic access for vaulted area except at Cupulo. 8/17/2004 2:03:43 PM
BLD-Energy code compliance8/10/20048/11/20048/11/2004PPASS
DetailsJim Sly
SCOTT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Scott to call me back to look at some membrane penitration issues....ie tunnelizing HVAC. 8/11/2004 1:52:31 PM
BLD-Framing/Rough-in8/9/20048/10/20048/10/2004PPASS
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 8/10/2004 3:19:50 PM
BLD-Energy code compliance8/5/20048/6/20048/6/2004AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/5/2004 at 4:56:49 PM. C/N posed. 8/6/2004 11:26:47 AM
BLD-Framing/Rough-in8/4/20048/5/20048/5/2004PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/4/2004 at 12:14:19 PM. Contact: ###-####. 8/5/2004 1:08:04 PM
BLD-Framing/Rough-in7/26/20047/26/20047/26/2004PPART
DetailsTom Arcoraci
Scott; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK TO COVER EXT DRYWALL 7/26/2004 1:51:02 PM
BLD-Framing/Rough-in7/16/20047/19/20047/19/2004APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/16/2004 at 10:30:52 AM. Contact: ###-####. ext nailing ok 7/19/2004 9:32:31 AM
BLD-Framing/Rough-in7/13/20047/13/20047/13/2004PPART
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Conf with Contractor. 7/13/2004 3:18:20 PM
BLD-Foundation6/3/20046/4/20046/4/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/3/2004 at 2:28:25 PM.
BLD-Concrete6/3/20046/3/20046/3/2004PPASS
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Footing. 6/3/2004 2:36:24 PM
(F) Reprint permit  5/24/2004  
Plan assigned to (M_P)8/26/2003 5/21/2004 PASS
DetailsMike Phillips
5/21/2004 10:14:46 M_P - activity updated through activity BLDA022 from case BLD03-02060.
Routing - PLAN CHECK5/21/2004 5/21/2004 NR
PLANS/APPL TAKEN TO FRONT DESK  5/21/2004 DONE
Print Pending Permit.LaserJet4  5/21/2004 DONE
Case Summary (BLD)  5/21/2004 DONE
Inspection Record Card- Bld  5/21/2004 DONE
Print Occupancy Form  5/21/2004 DONE
Issue PAID IN FULL permit  5/21/2004  
Routing - FIRE5/19/2004 5/20/2004 PASS
Per Review Comments Attached
Routing - PLAN CHECK5/14/2004 5/19/2004  
Routing to fire.
Plan resubmittals received  5/18/2004 DONE
Received two copies of letters from twin dolphin pools, two copies of material safety data sheets #1, #2, #4, Robard super blue MSDS chemical emergency sheet with attached report #971.//two copies of schematic main floor electrical, upper floor electrical, taken to Mike P.
Meeting  5/17/2004 DONE
met with contractor Scott Fenwick and owner; did Haz Mat review of 5 chemicals they propose to use. They will resubmit MSDS's in duplicate along with plan revision removing smoke detectors.
Routing - PLAN CHECK4/27/2004 5/14/2004 PEND
Waiting for others to approve prior to issuing permit.
Plan resubmittals received  5/13/2004 DONE
Received fax transmittal letter to Sam Rogers with response letter,United Water flow information sheet all taken to Mike Phillips.
Plan resubmittals received  5/7/2004 DONE
Received 2 Sets 52 Sheets T-1 ...Sent to Mike Phillips
Routing - FIRE4/22/2004 4/26/2004 FAIL
No respnse to 3/16/04 IFC review comments were resubmitted. Called architect, left message advising a Fire Code response is required.
Routing - PLAN CHECK3/17/2004 4/22/2004 FAIL
Need additional information on fire assemblies, do to changing building from nonrated to one-hour rating. Comcheck program does not match plans, heating load calcs do not match comcheck program. No cooling load calc's provided.
Plan resubmittals received  4/21/2004 DONE
Received one copy of response letter and two copies of revised sheets T-1, ST-1, ESC-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, A-11, A-12, A-13, A-14, A-15, A-16, M0.0, M0.1, M1.0, M1.1, M2.0, M01.1, EN1.0, routed to Mike P. kmm
Routing - FIRE3/15/2004 3/16/2004 FAIL
no response in resubmittal from architect to resubmittal requirements per 12/15/03 review comments # 4, 5 & 6. Called architect to discuss and confirm fax number which is not on application or plans; not available, left voice message to call back.
Routing - PLAN CHECK12/16/2003 3/15/2004 FAIL
Second review failed, faxed correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  2/26/2004 DONE
Received two copies of a letter, United Water letter, one response letter, two letter to reply to questions, two copies of Lighting Compliance Certificates, two copies of additional calculations, two of the site plan with ESC-1,A-1,A-2,A-3,A-4,A-5,A-6,A-7,A-8,A-9,A-10,A-11,A-12,A-13,A-14,A-15,A-16,M-1 taken to Mike P.
Routing - Erosion and Sediment12/16/2003 12/16/2003 PASS
ESC approved with conditions attached to plans.
Routing - FIRE12/12/2003 12/15/2003 FAIL
Hydrant location, hydrant waterflow, haz mat, and smoke detection information required. Review faxed to architect.
Routing - PLAN CHECK11/3/2003 12/12/2003 FAIL
Removed from the hold and placed back in order for review.
Plan reviewed completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLAN CHECK10/6/2003 11/3/2003  
Received a new set of plans. Will put back in plan check order.
Plan resubmittals received  10/29/2003 DONE
Received two copies of reivsed sheets A-1, A-2, A-3, A-5, A-8, two structural clac's and two copies of response letters. Routed to Mike P. kmm
Routing - PLAN CHECK9/17/2003 10/6/2003  
Removed from hold and put back in the review process today.
Sent letter requesting an appointment with the architect to discuss the 2000 Code requirements.
Plan resubmittals received  9/24/2003 DONE
Received two copies of Erosion & Sediment control plan with two copies of Narrative. Taken to Mike P.
Routing - PLUMBING9/16/2003 9/16/2003 PASS
1. need building backflow device 2. must bring 4 inch sewer into building with a clean out two feet outside 3. install clean outs per uniform plumbing code 4. water heater needs pan with a drain, expansion protection protection, and approved location for T&P drain(recommend floor drain with primer by water heater) 5. provide freeze protection for outdoor shower
Routing - PLANNING9/12/2003 9/15/2003 PASS
Passed for planning and sent on to building
Routing - Erosion and Sediment9/9/2003 9/11/2003 FAIL
ESC plan does not meet requirements of BCC8-17 or appendix A&C of plan designer manual.
Routing - PUBLIC WORKS8/29/2003 9/9/2003 PASS
Plan resubmittals received  9/4/2003 DONE
Received three copies of revised sheet ESC-7. Routed to Brian M. kmm
Routing - PLANNING Land Div8/27/2003 8/29/2003 PASS
Approved. Site is over 5 acres in size.
Plans ACCEPTED BY PLAN TECH  8/27/2003 DONE
Plan routing begun/NEW & ADDTN  8/27/2003  
Application received  8/25/2003  
Recd Pcfee & Taken To Pln CK  8/25/2003  
Fee Review-notes8/25/20038/25/2003