Case Summary (BLD) | | | 9/4/2015 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/29/2015 | 8/7/2015 | 8/13/2015 | P | PEND |
Phil Shearer
|
|
|
Owner working on permit
|
BLD-Aging Inspection | 7/16/2015 | 7/23/2015 | 7/29/2015 | P | PEND |
Phil Shearer
|
|
|
|
FIRE-Conference | 7/16/2015 | 7/23/2015 | 7/29/2015 | A | DONE |
Troy Cobbley
|
|
|
Per conversation with owner he is going to meet with plan review
|
FIRE-Conference | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | DONE |
Troy Cobbley
|
|
|
Occupying with no C of O and no fire sprinklers. Fire Code Review in documents
Phil and I met with the owner and discussed the process for a permanant certificate of occupancy. I left a correction notice with three items that included needing city approved drawings and note, fire sprinkler system as per the scope of work and the possible need of a fire sprinkler monitoring system. I deferred the owner to Jason to change status and for a possible change in the scope of work since the Fire Code does not seem to be the dirver for the requirement for the sprinkler system.
|
BLD-Conference | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | FAIL |
Phil Shearer
|
|
|
Occupying with no C of O and no fire sprinklers. Fire Code Review in documents . Fire code inspector wrote a corection no plans onsite.
|
BLD-Aging Inspection | 11/7/2006 | 11/7/2006 | 11/7/2006 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/6/2006 | 9/6/2006 | 9/6/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/7/2006 | 7/7/2006 | 7/7/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/26/2006 | 4/26/2006 | 4/26/2006 | | NR |
Tom Arcoraci
|
|
|
needs sprinks none
|
BLD-Aging Inspection | 2/22/2006 | 2/22/2006 | 2/22/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/19/2005 | 12/19/2005 | 12/19/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/18/2005 | 10/18/2005 | 10/18/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/16/2005 | 8/16/2005 | 8/16/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 6/8/2005 | 6/8/2005 | 6/8/2005 | | PASS |
Tom Arcoraci
|
|
|
wip slow 2hr wall not erquired will use non sep use exp
|
BLD-Framing/Rough-in | 4/4/2005 | 4/5/2005 | 4/5/2005 | A | FAIL |
Tom Arcoraci
|
|
|
richard pedraza; Phone #: ###-#### Internet Inspection Request from: Barbara Moore cn posted on 1 hr and 2hr walls also sprinks 4/5/2005 10:41:10 AM
|
BLD-Aging Inspection | 4/4/2005 | 4/4/2005 | 4/4/2005 | | NR |
Tom Arcoraci
|
|
|
wip 4/4/2005 9:51:42 AM
|
BLD-Aging Inspection | 9/28/2004 | 9/28/2004 | 9/28/2004 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 7/29/2004 | 7/29/2004 | 7/29/2004 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/29/2004 at 10:31:49 AM. Contact: ###-####. no vert bar in place first lift south and east infil walls. 7/29/2004 4:32:34 PM
|
BLD-Foundation | 7/19/2004 | 7/19/2004 | 7/19/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/19/2004 at 11:20:21 AM. Contact: ###-####. wip ok 7/19/2004 2:37:29 PM
|
BLD-Final | 7/19/2004 | 7/19/2004 | 7/19/2004 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm
|
BLD-Concrete | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Tom Arcoraci
|
|
|
rich - checking on block to see if metal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to grout and north footings ok 7/15/2004 12:12:53 PM
|
BLD-Concrete | 7/9/2004 | 7/9/2004 | 7/9/2004 | P | PASS |
Tom Arcoraci
|
|
|
Rich or ###-####; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 7/7/2004 | 7/7/2004 | 7/7/2004 | P | PART |
Tom Arcoraci
|
|
|
1st grout pour ok 7/7/2004 1:36:13 PM
|
BLD-Foundation | 6/10/2004 | 6/10/2004 | 6/10/2004 | P | PART |
Tom Arcoraci
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore south frost wall and west footing ok 6/10/2004 1:32:44 PM
|
BLD-Concrete | 6/7/2004 | 6/8/2004 | 6/8/2004 | A | PASS |
Tom Arcoraci
|
|
|
Tom; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes peirs ok 6/8/2004 9:45:56 AM
|
BLD-Aging Inspection | 6/7/2004 | 6/7/2004 | 6/7/2004 | | NR |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 3/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2004 | | DONE |
|
|
|
will pickup in a couple of weeks--oops we just called yesterday to
|
Routing Off Site -Energy | 1/20/2004 | | 1/28/2004 | | PASS |
|
|
|
faxed to Ron O. the resubmitted sheet.
|
Case Summary (BLD) | | | 1/28/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 1/28/2004 | | 1/28/2004 | | PASS |
|
|
|
passed energy
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/28/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2004 | | DONE |
|
|
|
spoke with James Gipson -- permit is ready.
|
Plan assigned to (MLO) | 8/27/2003 | | 1/28/2004 | | PASS |
Mike Otto
|
|
|
1/28/2004 14:12:30 MLO - activity updated through activity BLDA022 from case BLD03-02061.
|
Routing - PLANNING | 1/21/2004 | | 1/21/2004 | | PASS |
|
|
|
Approved per DRH02-196 and per attached sketch with handicap parking space revision.
|
Plan resubmittals received | | | 1/20/2004 | | DONE |
|
|
|
Received one copy of response letter. routed to Mike O. kmm
|
Routing - FIRE | 1/14/2004 | | 1/20/2004 | | PASS |
|
|
|
resubmittal information acceptable.
|
Routing Off Site -Energy | 1/6/2004 | | 1/14/2004 | | FAIL |
|
|
|
Contacted Ron O for revised energy review of 12/30/03. Sent corrections to architect and spoke with owner on phone. MLO 1/14/04
|
Plan resubmittals received | | | 1/13/2004 | | DONE |
|
|
|
Received two copies of revised sheets A2, two copies of response letter and one copy of fire flow. Routed to Mike O. kmm
|
Plan resubmittals received | | | 12/30/2003 | | DONE |
|
|
|
Received three copies of revised sheet M1. One copy of response letter and three copy of Mech. compliance cert. kmm
|
Routing - PLAN CHECK | 12/22/2003 | | 12/29/2003 | | PEND |
|
|
|
needs energy
|
Plan resubmittals received | | | 12/19/2003 | | DONE |
|
|
|
3 copies of Sheet A2 and cover letter from James Gipson received and forwarded to Mike Otto.
|
Routing Off Site - STRUCTURAL | 12/17/2003 | | 12/18/2003 | | PASS |
|
|
|
Contacted PDQ to take revised foundation calculations of 12/17/03.
|
Plan resubmittals received | | | 12/17/2003 | | DONE |
|
|
|
Received letter from James Gipson Associates with three foundation calculations. Taken to Mike
|
Plan resubmittals received | | | 12/12/2003 | | DONE |
|
|
|
Received one copy of response letter, four copies of revised sheet A2 and three copies of reivsed sheets F-1, F-2, F-3 and Envelope compliance certificate. Routed to Mike O
|
Routing Off Site - STRUCTURAL | 12/9/2003 | | 12/11/2003 | | FAIL |
|
|
|
Contacted PDQ to take (resubmitted plans, 81/2 x 11, of 11/21/03 sheet F2 and F3) to outside engineering. kmm/ NO calculations provided as presvioulsy requested. Architect notified. MLO
|
Plan resubmittals received | | | 11/25/2003 | | DONE |
|
|
|
Received response letter with two sheets of M1 taken to Mike O.
|
Plan resubmittals received | | | 11/21/2003 | | DONE |
|
|
|
Received two copies of revised sheets 1 of 1 two copies of canopy construction details and two copies of foundation detail. Routed to Mike Otto. kmm
|
Routing Off Site -Energy | 10/8/2003 | | 10/15/2003 | | FAIL |
|
|
|
resubs sent to Ron Oltman
|
Plan resubmittals requested | | | 10/8/2003 | | DONE |
|
|
|
IBC corrections
|
Plan resubmittals received | | | 10/6/2003 | | DONE |
|
|
|
Received two copies of revised sheets A1, A2, A3, A4. Three copies of revised ComCheck and one copy of response letter to Mike O. Routed to Mike O. kmm
|
Routing - PLAN CHECK | 10/3/2003 | | 10/5/2003 | | FAIL |
|
|
|
resub incomplete and other previous corrections not all satisfied. Partial correction list sent to architect in reponse to letter regarding corrections.
|
Routing - PLANNING Land Div | 9/30/2003 | | 10/2/2003 | | PASS |
|
|
|
Need new tax parcel number. Talked to James Gipson on 10/3/03. He will get new tax parcel number from Ada County Assessor.
|
Routing - PLAN CHECK | 9/29/2003 | | 10/1/2003 | | FAIL |
|
|
|
written response to letter from architect. Corrections not done to date MLO
|
Routing - FIRE | 9/23/2003 | | 9/29/2003 | | FAIL |
|
|
|
Resubmittal required for fire flow, hydrant sprinkler valving and Haz Mat information. Review faxed to architect.
|
Routing Off Site - STRUCTURAL | 8/28/2003 | | 9/23/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. Corrections sent to architect
|
Routing Off Site -Energy | 8/28/2003 | | 9/23/2003 | | FAIL |
|
|
|
Contacted Ron O for energy review. Corrections sent to architect
|
Plan resubmittals requested | | | 9/23/2003 | | DONE |
|
|
|
IBC , Structural and energy corrections
|
Routing - PLAN CHECK | 9/18/2003 | | 9/23/2003 | | FAIL |
|
|
|
corrections mailed to architect unable to fax. MLO
|
Routing - PLUMBING | 9/12/2003 | | 9/18/2003 | | PASS |
|
|
|
poer plans and 2000 upc, if a floor drainage system is required, resubmit plans for review.
|
Routing - PLANNING | 9/5/2003 | | 9/12/2003 | | FAIL |
|
|
|
Plans do not comply with Design Review conditions of approval. Note handicap accessible parking requires "van accessible" space, and Forestry conditions and have not been addressed.
|
Plan resubmittals received | | | 9/12/2003 | | DONE |
|
|
|
Received two copies of a quitclaim deed and property description for this project. Routed to Mike O. kmm These deeds are for April Miller's corrections of 8/29. Plans will need to be routed back to planning land use after intial review complete. MLO
|
Routing - PUBLIC WORKS | 8/29/2003 | | 9/5/2003 | | PASS |
|
|
|
All pre-treatment goes through Bench sewer district per LW.
|
Routing - Erosion and Sediment | 9/5/2003 | | 9/5/2003 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PLANNING Land Div | 8/28/2003 | | 8/29/2003 | | FAIL |
|
|
|
Existing property line bisects building. There was an ROS 5532 done in 2001 but doesn't appear to have deeds recorded to reflect ROS.
|
Plans ACCEPTED BY PLAN TECH | | | 8/28/2003 | | DONE |
|
|
|
Received one copy of calcs for pre engineered building. Sent to out side engineering. Contacted Jamse Gipson for second copy. kmm
|
Plan routing begun/NEW & ADDTN | | | 8/28/2003 | | DONE |
|
|
|
|
Application received | | | 8/25/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/25/2003 | | |
|
|
|
|
Fee Review-notes | 8/25/2003 | 8/25/2003 | | | |
|
|
|
|