Permit Information
Permit NumberBLD03-02063
StatusFinaled
Name CHRIS CONNER CONSTRUCTION LL
Site Address 3196 S MILLSPUR WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4064 sq. ft. two story single family dwelling with a 1015 sq. ft. attached three car garage, a 112 sq. ft. covered entry porch and a partially covered concrete patio at rear of structure per approved plans and attached requirement lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City. (1st floor 2582 sq. ft.)(2nd floor 1482 sq. ft.) PC #521 SOLAR PROTECTED SHADE RESTRICTED CUP #98-116 DJO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/1/20046/1/20046/1/2004 DONE
DetailsJim Sly
Fireplace finaled - ok for LC
Letter of compliance  6/1/2004 DONE
Letter of Compliance issued 6-1-04.
BLD-Final5/21/20045/24/20045/24/2004PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/21/2004 at 4:17:46 PM. Contact: ###-####. Need F/P finaled. 5/24/2004 3:48:39 PM
BLD-Framing/Rough-in2/25/20042/26/20042/26/2004APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/25/2004 at 4:55:40 PM. Contact: ###-####. front entry 2/26/2004 9:14:49 AM
BLD-Wall cover2/10/20042/11/20042/11/2004APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 2/10/2004 at 11:19:42 AM. Okay to sheetrock interior walls. Framing not complete at exterior entry. 2/11/2004 9:53:16 AM
BLD-Framing/Rough-in2/9/20042/9/20042/9/2004PPART
DetailsTroy James
ok to insulate. Framing not complete at entry exterior.
BLD-Framing/Rough-in2/5/20042/6/20042/6/2004PFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 2/5/2004 at 11:20:57 AM. Contact: ###-####. Need to complete penetration seal at top plate where drop ceiling occur. Need additional 1 3/4 x 117/8 LVL second level floor. See note 3. Need to complete front entry framing. Fire blocking at pantry drop ceiling. 2/6/2004 4:38:24 PM
BLD-Footing9/30/200310/1/200310/1/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/30/2003 at 2:05:40 PM. Contact: ###-####. work in progress 10/1/2003 9:53:16 AM
Routing - PLANNING9/30/2003 9/30/2003 PASS
Rotated home, submitted new site plan to reflect changes. PASS. AKT
(F) Reprint permit  9/19/2003  
Issue & PRINT permit  9/18/2003 DONE
Inspection Record Card- Bld  9/2/2003 DONE
Print Occupancy Form  9/2/2003 DONE
Permit Ready to Issue  9/2/2003 DONE
Telephone call  9/2/2003 DONE
permit ready and fees due
Plan assigned to (DJO)8/29/20038/29/20038/29/2003 PASS
DetailsDan Overy
Plan Review Report  8/29/2003 DONE
Plans ACCEPTED BY PLAN CHECK  8/29/2003  
PLANS/APPL TAKEN TO FRONT DESK  8/29/2003 DONE
Pending Assignment by DJO8/26/2003 8/29/2003 DONE
DetailsDan Overy
Routing - PLAN CHECK8/28/2003 8/29/2003 PASS
Routing - PUBLIC WORKS8/27/2003 8/28/2003 PASS
Application received  8/26/2003  
Routing - PLANNING8/26/2003 8/26/2003 PASS
contacted builder and designer requested new site plans reflecting proper set-backs; designer rotated building footprint to fit standard set-backs