BLD-Final | 8/12/2004 | 8/13/2004 | 8/13/2004 | A | FAIL |
Lane Manuel
|
|
|
weston; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
c'n for grippable handrails 2 loc. 8/13/2004 10:35:29 AM
|
BLD-Grading Inspection | 8/13/2004 | 8/13/2004 | 8/13/2004 | | BOND |
|
|
|
contractor has submitted $1,000 bond for correcting driveway drainage and fine grading. All other grading & drainage approved per Terry Records///8/13/04 BAM
|
BLD-Framing/Rough-in | 5/27/2004 | 5/28/2004 | 5/28/2004 | A | PASS |
Dave Hannah
|
|
|
Travis -- sheer wall, plans are above the fireplace.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to cover ext 5/28/2004 10:21:23 AM
|
BLD-Energy code compliance | 5/19/2004 | 5/20/2004 | 5/20/2004 | A | PASS |
Dave Hannah
|
|
|
weston; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/19/2004 | 5/19/2004 | 5/19/2004 | P | PART |
Dave Hannah
|
|
|
ok to insulate basement 5/19/2004 12:01:53 PM
|
BLD-Framing/Rough-in | 5/14/2004 | 5/17/2004 | 5/17/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/14/2004 at 3:16:03 PM. Contact: ###-####. c/n posted on front window. 5/17/2004 9:50:53 AM
|
BLD-Framing/Rough-in | 5/12/2004 | 5/13/2004 | 5/13/2004 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/12/2004 at 1:32:02 PM. Contact: ###-####. foam seal not done. 5/13/2004 11:09:21 AM
|
BLD-Framing/Rough-in | 5/13/2004 | 5/13/2004 | 5/13/2004 | P | FAIL |
Dave Hannah
|
|
|
Weston; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n on site 5/13/2004 4:09:07 PM
|
BLD-Framing/Rough-in | 4/20/2004 | 4/20/2004 | 4/20/2004 | P | FAIL |
Dave Hannah
|
|
|
weston; Phone #: ###-#### Internet Inspection Request from: Annette Moore shear engineering calc with 7/16 sheetingcrews installed fiberbrace reengineer or resheet 4/20/2004 2:12:14 PM
|
BLD-Foundation | 3/12/2004 | 3/12/2004 | 3/12/2004 | P | PASS |
Troy James
|
|
|
RJ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/6/2004 | 3/8/2004 | 3/8/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/6/2004 at 8:20:23 AM. Contact: ###-####.
|
BLD-Concrete | 2/26/2004 | 2/26/2004 | 2/26/2004 | P | CANC |
Dave Hannah
|
|
|
RJ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Concrete | 2/25/2004 | 2/25/2004 | 2/25/2004 | P | CANC |
Dave Hannah
|
|
|
rj; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Troy James
|
|
|
RJ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Troy James
|
|
|
RJ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 1/30/2004 | 2/2/2004 | 2/2/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/30/2004 at 12:52:05 PM. Contact: ###-####. basement walls 2/2/2004 3:20:25 PM
|
BLD-Footing | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/27/2004 at 8:35:25 PM. Contact: ###-####. This is ok per Terry Records. 1/28/2004 12:56:32 PM
|
BLD-Footing | 1/21/2004 | 1/21/2004 | 1/21/2004 | P | FAIL |
Dave Hannah
|
|
|
rj or wes ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 1/21/2004 2:41:17 PM frozen ground 1/21/2004 4:36:35 PM
|
BLD-Foundation | 1/17/2004 | 1/20/2004 | 1/20/2004 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 1/17/2004 at 7:13:40 AM. Contact: ###-####. Informed contractor via voice mail--No soils sign off, no rebar installed at time of inspection and no plans on job site. 1/20/2004 10:17:44 AM
|
MISC ACTIONS | | | 1/20/2004 | | PASS |
Bob Archibald
|
|
|
Soil subgrade approved by MTI.
|
BLD-Other | 12/17/2003 | 12/17/2003 | 12/17/2003 | A | FAIL |
Steven Webb
|
|
|
Travis ###-#### Informed Travis due to what appears to be that the ESC permit is under another contractor a Stop Work is issued until permits can be figured out. Stop Work per JLR. 12/17/2003 8:46:45 AM. Data Base indicates Travis Perry RP certificaiton expired on January, 2003.
|
Issue PAID IN FULL permit | | | 11/19/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/18/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/18/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2003 | | DONE |
|
|
|
Spoke with Travis told him permit is ready & fees
|
Plan Reviewer's activity | | | 11/17/2003 | | DONE |
|
|
|
plans resubmitted with smaller basement area. will charge two additional hours for review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/17/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 9/4/2003 | 9/4/2003 | 9/12/2003 | | PASS |
Dan Overy
|
|
|
9/12/2003 14:39:31 DJO - activity updated through activity BLDA022 from case BLD03-02072.
|
Plan Reviewer's activity | | | 9/12/2003 | | DONE |
|
|
|
received new res-check. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2003 | | |
|
|
|
|
Permit Ready to Issue | | | 9/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/12/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 9/8/2003 | | PEND |
|
|
|
will issue when someone contacts me about energy calcs. have spoken with shiloh and called designer (no answering machine)
|
Plans ACCEPTED BY PLAN CHECK | | | 9/4/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 9/4/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 9/4/2003 | | DONE |
|
|
|
|
Routing - FIRE | 8/29/2003 | | 9/2/2003 | | DONE |
|
|
|
No fire spirnklers required (Morningside, Block 1, Lot 11)
|
Routing - PLANNING | 8/28/2003 | | 8/29/2003 | | PASS |
|
|
|
Per Cup43-90. AKT
|
Routing - Erosion and Sediment | 8/29/2003 | | 8/29/2003 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS GRADING | 8/26/2003 | | 8/28/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as category 3 with conditions of approval in letter from Boise Public Works attached to the plan.
|
Routing - PUBLIC WORKS | 8/28/2003 | | 8/28/2003 | | PASS |
|
|
|
|
Application received | | | 8/26/2003 | | |
|
|
|
|
Pending Assignment by DJO | 8/26/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 9/3/2003 | | | | |
|
|
|
|