Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/17/2005 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/17/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10500 issued 3-17-05 to the Marriott Residence Inn.
|
Permanent Occupancy | | 3/16/2005 | 3/16/2005 | | DONE |
|
|
|
|
BLD-Final | 3/10/2005 | 3/11/2005 | 3/11/2005 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/10/2005 at 3:02:08 PM. Contact: ###-####.
|
BLD-Final | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm 3/11/2005 1:31:12 PM
|
FIRE-Final Inspection | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until I get the NFPA record of completion forms and the map is placed.
|
FIRE-Final Inspection | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | FAIL |
Troy Cobbley
|
|
|
Need to final the fire alarm permit. Add exit signs on east end of all floors as discussed and provide two additional fire extinguishers, one near the pool area and one near front desk 3/10/2005 3:49:09 PM
|
Print Occupancy Form | | | 3/9/2005 | | |
|
|
|
|
PubWorks Occupancy Approval | 3/4/2005 | 3/4/2005 | 3/8/2005 | | DONE |
|
|
|
Drainage project complete 3/4/05. R.Rokovitz
|
Code Occupancy Approval | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | CANC |
Scott M.Brown
|
|
|
|
Code Occupancy Approval | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | PASS |
Scott M.Brown
|
|
|
LOCATION LOOKS GOOD AND IN COMPLIANCE, I DID NOTE GRASS PAVERS FOR FIRE TRUCK TURN AROUND AREAS NEED TO BE IN PLACE FOR FIRE INSPECTION. 3/7/2005 4:25:35 PM
|
Inspection Record Card- Bld | | | 3/1/2005 | | DONE |
|
|
|
|
BLD-Other | 2/18/2005 | 2/18/2005 | 2/18/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/18/2005 at 11:11:10 AM. Contact: ###-####.
|
FIRE-Conference | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | DONE |
Troy Cobbley
|
|
|
A stop work order has been issued and posted at the project for any fire alarm installation work after 2/7/05 at Mary's direction. Stop work order given to the superintendant at job site.
|
BLD-Other | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 11:10:06 AM. Contact: ###-####. 4 floor ok 1/27/2005 12:50:51 PM
|
BLD-Other | 1/13/2005 | 1/13/2005 | 1/13/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/13/2005 at 10:58:39 AM. Contact: ###-####. 3rd floor ok 1/13/2005 4:24:01 PM
|
BLD-Other | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 4:02:05 PM. Contact: ###-####. grid ok 2 floor 1/4/2005 10:51:06 AM
|
BLD-Energy code compliance | 12/22/2004 | 12/22/2004 | 12/22/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 10:05:34 AM. Contact: ###-####.
|
BLD-Wall cover | 12/7/2004 | 12/8/2004 | 12/8/2004 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 11:45:53 AM. Contact: ###-####.ok to lay ceiling tile first floor corridor if all trades are approved for cover. 12/8/2004 3:44:46 PM
|
BLD-Energy code compliance | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 9:39:37 AM. Contact: ###-####.
|
Case Summary (BLD) | | | 11/19/2004 | | |
|
|
|
|
BLD-Framing/Rough-in | 11/16/2004 | 11/17/2004 | 11/17/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/16/2004 at 3:39:36 PM. Contact: ###-####. 4 th floor ok to insulate 11/17/2004 10:20:05 AM
|
BLD-Conference | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/2/2004 at 11:27:30 AM. Contact: ###-####.
|
BLD-Conference | 10/28/2004 | 10/29/2004 | 10/29/2004 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/26/2004 | 10/27/2004 | 10/27/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/26/2004 at 2:57:57 PM. Contact: ###-####. 3rd floor ok 10/27/2004 11:04:44 AM
|
BLD-Conference | 10/20/2004 | 10/21/2004 | 10/21/2004 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 9:56:28 AM. Contact: ###-####. 3RD FLOOR 10/14/2004 4:17:51 PM
|
BLD-Framing/Rough-in | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/8/2004 at 11:27:02 AM. Contact: ###-####. 2nd floor ok 10/8/2004 3:56:38 PM
|
BLD-Conference | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 10/6/2004 | 10/6/2004 | 10/6/2004 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/5/2004 | 10/5/2004 | 10/5/2004 | P | PASS |
Tom Arcoraci
|
|
|
dry wall ok 1st floor 10/5/2004 1:41:43 PM
|
BLD-Energy code compliance | 9/30/2004 | 9/30/2004 | 9/30/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/30/2004 at 10:07:50 AM. Contact: ###-####. 1st floor 9/30/2004 4:05:53 PM
|
BLD-Framing/Rough-in | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 9:54:01 AM. Contact: ###-####. ok to insulate 1st floor 9/24/2004 3:21:14 PM
|
BLD-Framing/Rough-in | 9/23/2004 | 9/23/2004 | 9/23/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 10:08:21 AM. Contact: ###-####. wp ok 1st floor 9/23/2004 2:28:06 PM needs plumb pippes fire stopped 9/23/2004 2:28:25 PM
|
BLD-Framing/Rough-in | 9/2/2004 | 9/2/2004 | 9/2/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/2/2004 at 9:17:42 AM. Contact: ###-####. wip ok 9/2/2004 4:48:55 PM
|
BLD-Framing/Rough-in | 8/18/2004 | 8/18/2004 | 8/18/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/18/2004 at 8:42:42 AM. Contact: ###-####. wip ok 8/18/2004 2:51:00 PM
|
FIRE-Conference | 8/11/2004 | 8/11/2004 | 8/11/2004 | P | DONE |
Troy Cobbley
|
|
|
I stopped by the project to check on fire sprinkler system installaton progress and found backboxes for fire alarm devices installed. This includes boxes for audio/visual devices and smoke detectors. I spoke to Danny Robbins with Kendall Electric ###-####, who was the installer, about code requiring plans be submitted and approved prior to installation. I issued a stop work order which is placed on the north wall in the first floor electrical room. The fire alarm system is actually to be installed by Vanguard. I called Keith with Vanguard ###-####, and he stated that they had just gotten the contract the previous day and did not even have plans submitted yet. Mary Froemke verified this fact.
|
BLD-Conference | 8/2/2004 | 8/2/2004 | 8/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/27/2004 | 7/28/2004 | 7/28/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/27/2004 at 3:50:53 PM. Contact: ###-####. 4 floor shear ok 7/28/2004 9:11:31 AM
|
BLD-Framing/Rough-in | 7/19/2004 | 7/20/2004 | 7/20/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/19/2004 at 2:34:18 PM. Contact: ###-####. shear ok as marked on plans 7/20/2004 9:56:52 AM
|
BLD-Framing/Rough-in | 6/28/2004 | 6/29/2004 | 6/29/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/28/2004 at 3:12:18 PM. Contact: ###-####. shear wip ok 2 3 floor 6/29/2004 9:44:59 AM
|
BLD-Conference | 6/22/2004 | 6/29/2004 | 6/29/2004 | A | PASS |
Tom Arcoraci
|
|
|
###-#### stan tom meeting at 9:00am
|
BLD-Conference | 6/22/2004 | 6/28/2004 | 6/28/2004 | A | NR |
Tom Arcoraci
|
|
|
###-#### stan tom this conference should be with Dixie & Stan & you....thanks
|
BLD-Framing/Rough-in | 6/23/2004 | 6/23/2004 | 6/23/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/23/2004 at 9:52:07 AM. Contact: ###-####. Framing 1st floor corridor OK except for shear walls. 6/23/2004 2:09:49 PM
|
BLD-Framing/Rough-in | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/21/2004 at 8:05:21 AM. Sch ed by a contractor via Hello! on 6/21/2004 at 8:05:21 AM. 6/21/2004 1:51:26 PM Inspection of (3) shear walls ...third floor. 10d 6 & 12...Ext OSB prior to covering with rock. Marked on plans. 6/21/2004 1:53:30 PM 6/21/2004 1:54:08 PM
|
Plan resubmittals received | | | 6/15/2004 | | DONE |
|
|
|
Received Transmittal Letter and 3 Sets of A-1.0 , A-1.1, A-1.7, A-2.2 , A-4.7 , A-7.0 These were re-submitted per Tom Arcoraci.. Taken to Mike Phillips
|
BLD-Conference | 5/19/2004 | 5/19/2004 | 5/19/2004 | P | PASS |
Tom Arcoraci
|
|
|
meeting on fur outs and their construction also talked about 2 hr wall resub 5/19/2004 3:02:27 PM
|
(F) Reprint permit | | | 5/11/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/10/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/7/2004 | | |
|
|
|
|
Print Occupancy Form | | | 5/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/7/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/7/2004 | | DONE |
|
|
|
left mess that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 5/6/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/2/2003 | | 5/6/2004 | | PASS |
Mike Phillips
|
|
|
5/6/2004 16:32:08 M_P - activity updated through activity BLDA022 from case BLD03-02084.
|
Routing - PLAN CHECK | 4/27/2004 | | 5/6/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/27/2004 | | DONE |
|
|
|
Received Letter Transmittal, Plan review responce letter, 3 sets of sheets.T-1.0,AR-1.0,SE-1.0,A-1.0,A-1.1A-1.2A-1.3,A-1.4,A-1.5,A-1.6,A-1.7A-2.0A-2.1A-2.2A-3.0A-3.1,A-4.0A-4.0.1,A-4.1A-4.1.1,A-4.2,A-4.4,A-4.5,A-4.6,A-4.7,A-4.8,A-4.9,A-4.10,A-4.11,A-5.0,A-5.1,A-5.2,A-5.4,A-5.5,A-5.6.1,A-5.7A-6.5,A-7.0,A-7.1,A-8.0,A-8.1,A-8.2,A-8.3,A-8.4,ID-1.1,ID-1.2,G-1.0,G-1.1,G-2.0,G-3.0,G-3.1,G-3.2,G-4.0,G-5.0,G-5.1,G-5.2,G-5.5,G-5.6,G-6.1,G-6.2,G-6.3,G-6.4,G-7.0,G-8.1,G-8.2,G-8.3,GID-1.1,P-2.1,P-2.2,P-2.3,P-2.4,P2.6,M-1.0,M-2.1,M-2.2,M-2.3,M-2.4,M-3.3,M3.4,M3.5,E-1.0,E-1.1,E-1.2,E-2.0,E-2.1,E-2.2,E-2.3,E-3.1,E-4.0,E-4.1,E-4.2,E-4.3. Routed to Mike Phillips
|
Routing Off Site - STRUCTURAL | 1/29/2004 | | 2/2/2004 | | PASS |
|
|
|
Routed resubmitted plan to outside engineering contacted PDQ.
No further review required for structural.
|
Plan resubmittals received | | | 2/2/2004 | | DONE |
|
|
|
Received one copy of revised sheets S-1.1 S-1.2, S-1.3, S-1.4, S-2.0, S-3.2, S-4.0. rOUTED TO Mike P. kmm
|
Plan resubmittals received | | | 1/29/2004 | | DONE |
|
|
|
Received two copies of revised sheets S-1.1, S-1.2, S-1.3, S-1.4, S-2.0, S-4.0, S-3.2, and one copy of response letter and correction list. Routed to Mike P. kmm
|
Routing - PLAN CHECK | 10/22/2003 | | 12/29/2003 | | FAIL |
|
|
|
PLan review completed, sent correction report to architect requesting additional information to be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 12/5/2003 | | DONE |
|
|
|
Received two copies of revised sheets T-1.0, AR-1.0, SA-1.0, SA-1.1, SA-1.2, A-1.0, A-1.1, A-1.2, A-1.3, A-1.4, A-1.6, A-17, A-4.0, A-4.1, A-4.2, A-4.8, A-4.9, A-4.10, A-4.11, A-5.2, A-5.3, A-5.6, A-5.6.1, A-7.0, 1D-1.2 and one copy of response letter from Browning & Associates. Routed letter to Mike P. Plans were put into plan set by BRS. kmm
|
Plan resubmittals received | | | 12/3/2003 | | DONE |
|
|
|
Received two copies of revised sheets C-1, C-2, C-3, AR-1.0, LS-1.0 LS-2.0. Routed to Mike P. kmm
|
Plan resubmittals received | | | 11/17/2003 | | DONE |
|
|
|
Recieved two copies of revised sheet DR-1. Routed to Mike P. kmm
|
Routing - PUBLIC WORKS | 10/17/2003 | | 10/22/2003 | | PASS |
|
|
|
|
Received Certificate of Value | | | 10/21/2003 | | DONE |
|
|
|
Received revised cert. of value to reflect a grading permit. Put with file and routed to Mike P. kmm
|
Routing - PLAN CHECK | 10/17/2003 | | 10/17/2003 | | |
|
|
|
Routing to P.W.
|
Routing - PLAN CHECK | 9/22/2003 | | 10/17/2003 | | HOLD |
|
|
|
Sent letter to architect requesting additional informaiton on plans in order to do a complete review. Plans will not be roured to the fire department for review until there is a responce form the architect.
|
Routing Off Site - STRUCTURAL | 9/2/2003 | | 9/24/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering.
Corrections report written, responce required to be reviewed by outside engineering firm.
|
Routing - PUBLIC WORKS | 9/22/2003 | | 9/22/2003 | | FAIL |
|
|
|
|
Routing - PLUMBING | 9/17/2003 | | 9/19/2003 | | PASS |
|
|
|
1. SECTION 711.0 SUDS RELIEF IN UPC-ANY VERTICAL DRAIN FROM A KITCHEN SINK, BATHTUB/SHOWER AND A WASHING MACHINE MUST BE EIGHT FEET FROM A STACK WHEN IT GOES HORIZONAL. 2. WASTE LINE FROM THREE WASHING MACHINES ON FIRST FLOOR MUST BE THREE INCH, WASHING MACHINES IN GROUPS OF THREE OR MORE ARE RATED AT SIX FIXTURE UNITS EACH.
|
Routing - Erosion and Sediment | 9/17/2003 | | 9/17/2003 | | PASS |
|
|
|
ESC approved with attached conditions. Boise City to be notified of RP prior to start of construction.
|
Plan resubmittals received | | | 9/17/2003 | | DONE |
|
|
|
Received completed appliation however RP is out to bid. kmm
|
Routing - PLANNING | 9/12/2003 | | 9/16/2003 | | PASS |
|
|
|
Approved per CUP03-9 and DRH03-59.
|
Routing - Erosion and Sediment | 9/11/2003 | | 9/11/2003 | | FAIL |
|
|
|
Listed RP is not certified by Boise City. Contacted PD on this date.
|
Routing - PLANNING Land Div | 9/11/2003 | | 9/11/2003 | | PASS |
|
|
|
Approved. Legal one-time split of parcel in ROS 4855. Parcel is described in ROS 6217.
|
Routing - PUBLIC WORKS | 9/2/2003 | | 9/10/2003 | | FAIL |
|
|
|
Requies drainage plan revisions per Brian M. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 9/8/2003 | | DONE |
|
|
|
Received two copies of ESC plan and narrative. Put with plans when back from PW. kmm
|
Routing Off Site -Energy | 9/2/2003 | | 9/5/2003 | | FAIL |
|
|
|
Contacted Ron O for outside energy review. kmm
Energy review completed addtional inforation required for further review prior to issuing permit. Additional review required by outside reviewer.
|
Additional plans submitted | | | 9/2/2003 | | DONE |
|
|
|
Received three copies of civil sheets, one copy of drainage calcs and O&M manual. put with plans. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 9/2/2003 | | PEND |
|
|
|
Still waiting for ESC. Will start routing. See where we are before routing to ESC...kmm
|
Routing - PLANNING Land Div | 9/2/2003 | | 9/2/2003 | | FAIL |
|
|
|
Incorrect parcel number on permit, parcel on permit is only .3 acre in size. Assessor has two parcels listed for ROS 4855. There is a 5' Idaho Power easement on ROS that is located near a proposed building pad.
|
Pending Assignment by JCM | 8/29/2003 | | 9/2/2003 | | DONE |
John Menard
|
|
|
9/2/2003 07:45:33 JCM - activity updated through activity BLDA170 from case BLD03-02084.
|
Plan routing begun/NEW & ADDTN | | | 9/2/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/29/2003 | | FAIL |
|
|
|
Requires two copies of ESC plan and narrative, three extra civil sheet with drainage calculation and O&M manual. Contacted Denis Fletcher for extra civil and BRS for ESC plans and narrative. kmm
8/29/03 Received three copies of civila sheets, one copy of drainage calcs and O&M manual.
|
Application received | | | 8/27/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2003 | | DONE |
|
|
|
|
Routing - FIRE | 12/29/2003 | | 1/7/2003 | | PASS |
|
|
|
Review comments and Haz Mat consultant list faxed to architect.
|
Fee Review-notes | 8/27/2003 | 8/27/2003 | | | |
|
|
|
|