Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-02145
StatusFinaled
Name MARKAR DESIGN AND CONSTRUCTI
Site Address 4980 N ARROW CREST WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3915 sq. ft. two story single family dwelling with a 790 sq. ft. attached three car garage, a 154 sq. ft. covered entry porch and concrete patio area at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space will be maintained. (1st floor 1855 sq. ft.)(2nd floor 2060 sq. ft.) PC #556 CU #44-94 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/25/20043/26/20043/26/2004APASS
DetailsTroy James
marshal; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled3/26/20043/26/20043/26/2004APASS
DetailsTroy James
Finaled by inspector at 3/26/2004 9:56:40 AM
BLD-Grading Inspection3/25/20043/25/20043/25/2004 PASS
DetailsRita DeYoung
Final grading and drainage complete and approved
BLD-Final3/24/20043/25/20043/25/2004PFAIL
DetailsTroy James
Marshall -- late afternoon please. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted 3/25/2004 2:40:12 PM
BLD-Framing/Rough-in12/12/200312/15/200312/15/2003APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 12/12/2003 at 1:00:36 PM. Contact: ###-####.
BLD-Energy code compliance12/10/200312/11/200312/11/2003AFAIL
DetailsTroy James
Becky; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted need sleeve at b-vent first floor and second floor. 12/11/2003 11:44:35 AM
BLD-Framing/Rough-in12/8/200312/9/200312/9/2003APASS
DetailsTony Young
Becky; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in12/5/200312/8/200312/8/2003AFAIL
DetailsTroy James
Marshall; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted 12/8/2003 1:10:42 PM
BLD-Other11/17/200311/18/200311/18/2003APART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/17/2003 at 5:10:57 PM. Contact: ###-####.
ext. shear ok 11/18/2003 10:31:41 AM
BLD-Framing/Rough-in11/17/200311/17/200311/17/2003PNR
DetailsTony Young
shear insp--marshall; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Foundation10/14/200310/15/200310/15/2003APART
DetailsTony Young
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Grading Inspection  10/13/2003 PASS
FOOTING SUBGRADE APPROVED BY THE GEOTECHNICAL ENGINEER
BLD-Footing10/9/200310/10/200310/10/2003ACANC
DetailsJim Storey
DAVE; Phone #: ###-#### Internet Inspection Request from: Annette Moore called and soil report not faxed to office until pm dave call and wanted rolled over to pm. 10/10/2003 9:37:36 AM
BLD-Footing10/10/200310/10/200310/10/2003PPASS
DetailsJim Storey
dave- ###-####
BLD-Footing10/10/200310/10/200310/10/2003PPASS
DetailsJim Storey
DAVE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Issue PAID IN FULL permit  10/1/2003 DONE
Inspection Record Card- Bld  9/29/2003 DONE
Permit Ready to Issue  9/29/2003  
Telephone call  9/29/2003 DONE
Spoke with Marshall and told permit ready & fees
Print Occupancy Form  9/29/2003 DONE
Plan assigned to (DJO)9/18/20039/18/20039/26/2003 PASS
DetailsDan Overy
9/26/2003 14:49:23 DJO - activity updated through activity BLDA022 from case BLD03-02145.
Plan Reviewer's activity  9/26/2003 DONE
received red-lined plans. ok to issue. re-did energy calcs.
Case Summary (BLD)  9/26/2003 DONE
Plan Review Report  9/26/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/26/2003 DONE
Plan Reviewer's activity  9/18/2003 DONE
plans require additional information before issuing permit. missing bearing, engineered sections, rescheck, raised floor sections, concrete footings for girder loads, incomplete 2nd floor framing, joist series.
Plans ACCEPTED BY PLAN CHECK  9/18/2003  
Routing - FIRE9/8/2003 9/12/2003 DONE
No fire sprinklers required (Arrowhead Canyon)
Routing - Erosion and Sediment9/9/2003 9/11/2003 PASS
ESC approved with conditions attached to plans.
Routing - PLANNING9/8/2003 9/8/2003 PASS
Routing - PUBLIC WORKS9/8/2003 9/8/2003 PASS
Routing - PUBLIC WORKS GRADING9/5/2003 9/5/2003 DONE
DetailsRita DeYoung
Approved as Category 3
Application received  9/5/2003  
Pending Assignment by DJO9/5/2003    
DetailsDan Overy
Routing - PLAN CHECK9/12/2003