BLD-Aging Inspection | 10/4/2005 | 10/4/2005 | 10/5/2005 | | PASS |
Dave Hannah
|
|
|
|
First Notice | 10/5/2005 | 10/5/2005 | 10/5/2005 | | DONE |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/5/2005 | 10/5/2005 | 10/5/2005 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/29/2005 | 7/29/2005 | 8/1/2005 | | PART |
Dave Hannah
|
|
|
temp occ issued work in progress
|
FIRE-Conference | 2/8/2005 | 2/9/2005 | 2/9/2005 | A | DONE |
Troy Cobbley
|
|
|
I spoke to contractor about life safety issues such as emergency light and exit sign placement. It doesn't appear exit signs will be required on ground floor of east empty tenant 2/9/2005 10:00:54 AM
|
FIRE-Final Inspection | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Conference | 1/24/2005 | 1/24/2005 | 1/24/2005 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 1/20/2005 | 1/21/2005 | 1/21/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 3:11:41 PM. Contact: ###-####.
|
BLD-Conference | 1/18/2005 | 1/19/2005 | 1/19/2005 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 1:07:20 PM. Contact: ###-####.
|
BLD-Wall cover | 1/17/2005 | 1/18/2005 | 1/18/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 1:24:06 PM. Contact: ###-####. fire dampers in 2 hr wall ok to cover 1/18/2005 10:24:39 AM
|
BLD-Conference | 1/13/2005 | 1/13/2005 | 1/13/2005 | A | PART |
Dave Hannah
|
|
|
fire dampers in 2hr wall not installed per manfactors rec crew will rework 1/13/2005 10:01:22 AM
|
FIRE-Conference | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Rick Jackson
|
|
|
Met with GC about the new RTU that will require a duct detector for unit shutdown as it is over 2000 cfm; there are no detectors required at the new fire dampers in 2 hr wall; will need knox box; there are different addresses that need to be updated with PDS 1/12/2005 1:58:51 PM
|
BLD-Framing/Rough-in | 12/30/2004 | 1/3/2005 | 1/3/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/30/2004 at 11:46:23 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/3/2005 | 1/3/2005 | 1/3/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/30/2004 at 11:46:23 AM. Contact: ###-####.
|
BLD-Conference | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 9:34:34 AM. Contact: ###-####. talked about fire walls needs to go to plan reveiw 12/21/2004 11:06:23 AM
|
FIRE-Conference | 12/21/2004 | 12/21/2004 | 12/21/2004 | A | PART |
Rick Jackson
|
|
|
Met with GC, architect and Dave H. about changing the 2 hour wall - told them to get with PDS plan review for submittals/approval prior to changing approved plans 12/21/2004 11:06:50 AM
|
BLD-Framing/Rough-in | 12/10/2004 | 12/14/2004 | 12/14/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/10/2004 at 7:58:07 AM. Contact: ###-####.
|
FIRE-Conference | 12/8/2004 | 12/10/2004 | 12/10/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 9:18:45 AM. Contact: ###-####. Met with GC - the exiting from the core restrooms will require occupants to exit without key through tenant spaces and the building is supposed to be fire sprinklered throughout the entire building - the architect is aware of both issues and is working on them 12/10/2004 2:51:53 PM
|
BLD-Framing/Rough-in | 12/7/2004 | 12/9/2004 | 12/9/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 1:51:29 PM. need details for steel stud spanes over bathrooms at doors also hall way along back and starage above restrooms alnd full height walls storage to old walls ok to start covering the rest of the walls 12/9/2004 10:26:07 AM
|
BLD-Concrete | 12/7/2004 | 12/8/2004 | 12/8/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 1:48:26 PM. slab on slab 12/8/2004 1:49:39 PM
|
BLD-Concrete | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 10:28:37 AM. Contact: ###-####. slab over slab 12/7/2004 11:11:42 AM
|
CHANGE STATUS TO (ISS) | | | 12/6/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/6/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/2/2004 | | DONE |
|
|
|
left mess for rob thornton at ###-#### that pernit is ready
|
Override - Parcel Holds | | | 12/1/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/1/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/1/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/1/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 12/1/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 12/1/2004 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 10/22/2004 | | 11/29/2004 | | PASS |
|
|
|
11/29/2004 16:03:26 RMH - activity updated through activity BLDA022 from case BLD03-02187.
|
Routing - PLAN CHECK | 11/15/2004 | | 11/29/2004 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 11/29/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/23/2004 | | DONE |
|
|
|
Received response letter, two sets of sheets A0.11,E3.1 taken to Ron H.
|
Routing - FIRE | 11/9/2004 | | 11/15/2004 | | PASS |
|
|
|
PLAN MODIFICATION. Acceptable per revised comments attached and faxed to architect.
|
Routing - PLAN CHECK | 11/2/2004 | | 11/9/2004 | | FAIL |
|
|
|
PLAN MODIFICATION. Faxed and mailed requirements to the architect, routed plans to the fire department on 11/09/04
|
Routing - PLUMBING | 10/29/2004 | | 11/2/2004 | | PASS |
|
|
|
PLAN MODIFICATION.
N/A ; no plumbing on modification, but have not started or completed plumbing on original Bld03-02187
|
Routing - PLANNING | 10/26/2004 | | 10/29/2004 | | PASS |
|
|
|
PLAN MODIFICATION - Approved by Tempra Wilson (DRH03-67).
|
Routing - PUBLIC WORKS | 10/22/2004 | | 10/26/2004 | | PASS |
|
|
|
PLAN MODIFICATION
|
Plan Modification Accepted | | | 10/22/2004 | | DONE |
|
|
|
PLAN MODIFICATION SUBMITTED. 3 copies of sheets a2.11, a3.11, a6.11, m1.01, m2.01, e3.1 received. Modification includes exterior and interior changes to the proposed tenant space in northeast corner of building, exit corridor, storage room, exterior lighting and basement remodel. Plans started routing to PW, Planning, Plumbing, Plan Check and Fire.
|
FIRE-Conference | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | PART |
Rick Jackson
|
|
|
TIM WILL CALL ABOUT CONFERENCE; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell The owner wants to sprinkler the TI spaces and not the brew pub; per conversation with Ron Hill the plans were submitted with the building being fully sprinklered; per Ron the architect will have to submit showing the building not sprinklered; left message with Tim about this requirement 9/29/2004 10:34:05 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 3/5/2004 | 3/8/2004 | 3/8/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/5/2004 at 1:43:20 PM. Contact: ###-####. north stair ok to cover 3/8/2004 8:57:43 AM
|
BLD-Framing/Rough-in | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/24/2004 at 9:17:15 AM. Contact: ###-####. walls for stairs out of basement and exit corrodor out backok to cover 2/24/2004 2:27:33 PM
|
FIRE-Conference | 2/19/2004 | 2/20/2004 | 2/20/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/19/2004 at 3:54:07 PM. Contact: ###-####. need plans/permit for TI in basement 2/20/2004 1:33:18 PM
|
BLD-Foundation | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 2/11/2004 at 4:16:09 PM. Contact: ###-####. Footing & columns in basement are ok, per plan. 2/12/2004 8:26:14 AM
|
BLD-Foundation | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/3/2004 at 1:04:38 PM. Contact: ###-####.frg for cmu wall basement stairs ok to pour 2/4/2004 2:27:28 PM
|
BLD-Conference | 1/30/2004 | 2/2/2004 | 2/2/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/30/2004 at 12:42:01 PM.
|
Plan assigned to (R_H) | 9/23/2003 | | 11/25/2003 | | PASS |
|
|
|
11/25/2003 09:20:03 RMH - activity updated through activity BLDA022 from case BLD03-02187.
|
Routing - PLAN CHECK | 11/24/2003 | | 11/25/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/25/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/25/2003 | | |
|
|
|
|
Telephone call | | | 11/25/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 11/25/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/24/2003 | | 11/21/2003 | | |
|
|
|
|
Routing - PLANNING | 11/21/2003 | | 11/21/2003 | | PASS |
|
|
|
Approved per DRH03-67.
|
Plan resubmittals received | | | 10/28/2003 | | DONE |
|
|
|
Received two copies of revised sheets topography, 2.10, 2.21, 2.25, 2.31, 2.41, 2.51, 2.61, 2.65, S0.1, S1.1, S1.2, S2.1, S5.1, S7.1, m0.01, m1.01, m2.01, m3.01, m4.01, m4.02, m5.01, m6.01, m7.01, p1.01, p1.02, p2.01, p3.01, e1.0, e2.0, e3.0, e4.0, e5.0, e6.0. One copy of cover letter. Routed to Ron Hill. kmm
|
Plan resubmittals received | | | 10/28/2003 | | DONE |
|
|
|
Received one set of structural design calculations. Taken to Ron H.
|
Routing - FIRE | 10/14/2003 | | 10/23/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/20/2003 | | |
|
|
|
Recieved two copies of revised sheets a2.01, a2.11, a4.11, a5.11, a6.11, a2.01, a2.11, a4.11, a5.11, a6.11 and two copies of structural engineer's design calculations and one copy of plan review response letter. Routed to Ron Hill. kmm
|
Routing - PLAN CHECK | 9/25/2003 | | 10/14/2003 | | FAIL |
|
|
|
Faxed and mailed requriements to the architect on 10/14/03, routed plans to the fire department on same day.
|
Routing - PLANNING | 9/25/2003 | | 9/25/2003 | | FAIL |
|
|
|
Bonding for streetscape needs to be provided. See letter from Tempra Wilson, dated July 16, 2003.
|
Routing - PLUMBING | 9/23/2003 | | 9/24/2003 | | PASS |
|
|
|
per plans and 2000 upc.
|
Routing - PUBLIC WORKS | 9/12/2003 | | 9/23/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/12/2003 | | DONE |
|
|
|
|
Application received | | | 9/10/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/10/2003 | | |
|
|
|
|
Fee Review-notes | 9/10/2003 | 9/10/2003 | | | |
|
|
|
|