Third Notice | | 9/19/2005 | 9/19/2005 | | DONE |
Rita DeYoung
|
|
|
|
Second Notice BLD | 9/15/2005 | 9/15/2005 | 9/19/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/31/2005 | 9/15/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | PASS |
Jim Storey
|
|
|
c/n made ok l/c isued
|
BLD-Final | 8/29/2005 | 8/30/2005 | 8/30/2005 | A | FAIL |
Jim Storey
|
|
|
kent - ###-#### need 2x2 safty glazing 2nd floor next to doors.
|
FIRE-Final Inspection | 8/19/2005 | 8/22/2005 | 8/22/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
FIRE-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | FAIL |
Forrest France
|
|
|
Exit discharge lights at two separate areas failed to operate under backup power source.
|
BLD-Framing/Rough-in | 6/17/2005 | 6/20/2005 | 6/20/2005 | A | PASS |
Jim Storey
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie hard cielling ok in stair
|
BLD-Framing/Rough-in | 5/20/2005 | 5/23/2005 | 5/23/2005 | P | PART |
Jim Storey
|
|
|
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/9/2005 | 5/10/2005 | 5/10/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/9/2005 at 2:05:50 PM. Contact: ###-####.exterior walls ok
|
BLD-Framing/Rough-in | 4/19/2005 | 4/20/2005 | 4/21/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/19/2005 at 9:26:26 AM. Contact: ###-####.si ok 2nd floor deck pour.
|
BLD-Aging Inspection | 4/5/2005 | 4/5/2005 | 4/5/2005 | | PASS |
Jim Storey
|
|
|
wip
|
PubWorks Occupancy Approval | 1/26/2005 | 1/26/2005 | 1/26/2005 | | DONE |
|
|
|
Drainage final approval by B.Murphy 01/26/05
|
BLD-Final | 12/13/2004 | 12/13/2004 | 12/13/2004 | P | PASS |
Jim Storey
|
|
|
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice landings and side walks ok pending si final 12/13/2004 3:41:08 PM
|
BLD-Final | 12/8/2004 | 12/9/2004 | 12/9/2004 | A | NR |
Jim Storey
|
|
|
nick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Aging Inspection | 10/12/2004 | 10/12/2004 | 10/12/2004 | | PASS |
Jim Storey
|
|
|
wip 10/12/2004 7:56:11 AM
|
BLD-Aging Inspection | 8/9/2004 | 8/9/2004 | 8/9/2004 | | PASS |
Jim Storey
|
|
|
wip 8/9/2004 10:22:04 AM
|
BLD-Aging Inspection | 6/7/2004 | 6/7/2004 | 6/7/2004 | | PASS |
Jim Storey
|
|
|
wip 6/7/2004 9:19:38 AM
|
BLD-Footing | 4/2/2004 | 4/5/2004 | 4/5/2004 | A | PART |
Jim Storey
|
|
|
nick bateman; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ft ok wip spi. 4/5/2004 10:12:27 AM
|
BLD-Aging Inspection | 3/9/2004 | 3/9/2004 | 3/9/2004 | | PASS |
Jim Storey
|
|
|
wip 3/9/2004 8:35:58 AM
|
Plan resubmittals received | | | 2/24/2004 | | DONE |
|
|
|
Received three requested changes to the Bown shell and core projects. Routed to Mike P. kmm
|
Plan resubmittals received | | | 12/30/2003 | | DONE |
|
|
|
Received two additional copies of revised sheets C2, A1.11, A2.12, A5.00 A5.11, S2.12, S3.12, S4.11, S5.12, S6.12, S7.11 M1.02. One copy of cover letter. Routed to Marlene. kmm
|
(F) Reprint permit | | | 12/9/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/8/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/8/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/8/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 12/8/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/2/2003 | | 12/5/2003 | | PASS |
|
|
|
|
Plan assigned to (M_P) | 9/16/2003 | | 12/5/2003 | | PASS |
Mike Phillips
|
|
|
12/5/2003 14:10:09 M_P - activity updated through activity BLDA022 from case BLD03-02192.
|
Routing - Erosion and Sediment | 12/2/2003 | | 12/2/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/26/2003 | | 12/2/2003 | | |
|
|
|
|
Plan resubmittals received | | | 12/2/2003 | | DONE |
|
|
|
Recieved two copies of ESC plans and narrative. Routed to Mike P. kmm
|
Routing - PLANNING Land Div | 11/26/2003 | | 11/26/2003 | | PASS |
|
|
|
Riverwalk Subdivision No.1 recorded 11-25-03. Lot 5 of Block 2.
|
Routing - Erosion and Sediment | 11/26/2003 | | 11/26/2003 | | FAIL |
|
|
|
See comments on ESC permit.
|
Routing - PLANNING | 11/26/2003 | | 11/26/2003 | | PASS |
|
|
|
|
Routing - FIRE | 11/24/2003 | | 11/25/2003 | | PASS |
|
|
|
Resubmittal approved
|
Routing - PUBLIC WORKS | 11/14/2003 | | 11/24/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/18/2003 | | DONE |
|
|
|
Received one transmittals with one plan review response letters,1 letters to Marty regarding landscape, Guide specifications, two structural calcs. two sets of sheets A1.11, 4 sets of sheets C2,A2.12,A3.12,A4.12,,A5.00,A5.11,A6.12,S1.11,S2.12,S3.12,S4.11,S5.11,S5.12,S6.12,S7.11,M1.02,M1.02,E2.21
|
Plan resubmittals received | | | 11/17/2003 | | DONE |
|
|
|
Received two copies of revised sheets a1.11, one plan review response letter, one fire flow package from United Water and one letter from Dave Miller. Routed to Mike Phillips. kmm
|
Plan resubmittals received | | | 11/17/2003 | | DONE |
|
|
|
Received two copies of ESC report. Routed to Mike P. kmm
|
Plan resubmittals received | | | 11/14/2003 | | DONE |
|
|
|
Received transmittal letter from Toothman orton engineering & ESC narrative. Taken to Mike P.
|
Routing - FIRE | 11/7/2003 | | 11/13/2003 | | FAIL |
|
|
|
need hydrant and sprinkler flows. Review faxed to architect
|
Routing Off Site -Energy | 9/16/2003 | | 11/7/2003 | | FAIL |
|
|
|
Contacted Ron O for energy review. kmm
Additional information required for further review.
|
Routing - PLAN CHECK | 10/2/2003 | | 11/7/2003 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional informatio be resubmitted for further review, prior to issuing permit.
|
Routing - PLUMBING | 9/26/2003 | | 10/2/2003 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLANNING | 9/26/2003 | | 9/26/2003 | | FAIL |
|
|
|
Landscape plan does not comply with Design Review DRH03-34.
|
Plan resubmittals received | | | 9/26/2003 | | DONE |
|
|
|
Received transmittal sheet with Erosion & sediment control design report. taken to Mike P.
|
Routing - Erosion and Sediment | 9/23/2003 | | 9/26/2003 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 9/16/2003 | | 9/23/2003 | | FAIL |
|
|
|
Requires site plans showing meets and bounds with utilities and easements being shown and building. Per April Miller Requires O&M manual and geotech report. Per Brian Murphy. Sanitary sewer is considered public and needs to be reviewed and approved separately by PW. Per John Johnson. kmm
|
Routing - PLANNING Land Div | 9/16/2003 | | 9/16/2003 | | FAIL |
|
|
|
Do not issue building permit until plat of Riverwalk Subdivision is recorded.
|
Plan routing begun/NEW & ADDTN | | | 9/16/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/16/2003 | | DONE |
|
|
|
RP out to bid. kmm
|
Application received | | | 9/11/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/11/2003 | | |
|
|
|
|
Fee Review-notes | 9/11/2003 | 9/11/2003 | | | |
|
|
|
|