Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02210
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 4415 E TANOAK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a four bedroom, two and half bathroom 2516 sq. ft. two story single family dwelling (1455 sq. ft. first floor/1061 sq. ft. second floor) with a attached 859 sq. ft. three car garage and a 56 sq. ft. covered front porch. Per approved plans, engineering and requirement list. PC#558 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/27/20042/27/20042/27/2004PPASS
DetailsTroy James
troy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
DOC - Permit Finaled2/27/20042/27/20042/27/2004PPASS
DetailsTroy James
Finaled by inspector at 2/27/2004 3:20:48 PM
BLD-Final2/25/20042/26/20042/26/2004PFAIL
DetailsTroy James
troy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Need landing to exterior doors in rear, address numbers posted, and guard east side of entry door landing. 2/26/2004 2:10:58 PM
BLD-Energy code compliance12/1/200312/2/200312/2/2003PPASS
DetailsSteven Webb
Troy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in12/1/200312/2/200312/2/2003APASS
DetailsSteven Webb
Troy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in11/26/200311/28/200311/28/2003APART
DetailsSteven Webb
TROY; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N issued--Ok to insulate. 11/28/2003 10:36:19 AM
BLD-Foundation10/3/200310/6/200310/6/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/3/2003 at 9:03:51 AM. Contact: ###-####.
BLD-Footing10/3/200310/3/200310/3/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/3/2003 at 9:02:50 AM. Contact: ###-####.
Permit Ready to Issue  9/23/2003  
Inspection Record Card- Bld  9/23/2003 DONE
Telephone call  9/23/2003 DONE
left mess that permit is ready
Issue PAID IN FULL permit  9/23/2003 DONE
Plan assigned to (SAM)9/17/2003 9/22/2003 PASS
DetailsSteve Munroe
9/22/2003 16:18:45 SAM - activity updated through activity BLDA022 from case BLD03-02210.
Routing - PLAN CHECK9/15/2003 9/22/2003 DONE
Plan Reviewer's activity  9/22/2003 PEND
9/22/03 13:30 I called and left a message for Scott to call me regarding the plans. I need the REScheck to show the doors, all windows and floor area. I also need bearing in foundation for loads from above.
Case Summary (BLD)  9/22/2003  
Plan Review Report  9/22/2003  
PLANS/APPL TAKEN TO FRONT DESK  9/22/2003 DONE
Pending Assignment by DJO9/12/2003 9/17/2003 DONE
DetailsDan Overy
9/17/2003 08:17:51 SAM - activity updated through activity BLDA183 from case BLD03-02210.
Plan Reviewer's activity  9/17/2003 PEND
9/17/03 09:43 I called and left a message on the builders phone. I let them know that someone need to pick up the plans and provide tall wall engineering, if done like plans show, and the foundation needs to be redesigned to handle loads.
Routing - PUBLIC WORKS9/12/2003 9/15/2003 PASS
Application received  9/12/2003  
Routing - PLANNING9/12/2003 9/12/2003 PASS