BLD-Final | 2/27/2004 | 2/27/2004 | 2/27/2004 | P | PASS |
Troy James
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
DOC - Permit Finaled | 2/27/2004 | 2/27/2004 | 2/27/2004 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 2/27/2004 3:20:48 PM
|
BLD-Final | 2/25/2004 | 2/26/2004 | 2/26/2004 | P | FAIL |
Troy James
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Need landing to exterior doors in rear, address numbers posted, and guard east side of entry door landing. 2/26/2004 2:10:58 PM
|
BLD-Energy code compliance | 12/1/2003 | 12/2/2003 | 12/2/2003 | P | PASS |
Steven Webb
|
|
|
Troy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 12/1/2003 | 12/2/2003 | 12/2/2003 | A | PASS |
Steven Webb
|
|
|
Troy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 11/26/2003 | 11/28/2003 | 11/28/2003 | A | PART |
Steven Webb
|
|
|
TROY; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N issued--Ok to insulate. 11/28/2003 10:36:19 AM
|
BLD-Foundation | 10/3/2003 | 10/6/2003 | 10/6/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/3/2003 at 9:03:51 AM. Contact: ###-####.
|
BLD-Footing | 10/3/2003 | 10/3/2003 | 10/3/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/3/2003 at 9:02:50 AM. Contact: ###-####.
|
Permit Ready to Issue | | | 9/23/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/23/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/23/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 9/23/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/17/2003 | | 9/22/2003 | | PASS |
Steve Munroe
|
|
|
9/22/2003 16:18:45 SAM - activity updated through activity BLDA022 from case BLD03-02210.
|
Routing - PLAN CHECK | 9/15/2003 | | 9/22/2003 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/22/2003 | | PEND |
|
|
|
9/22/03 13:30 I called and left a message for Scott to call me regarding the plans. I need the REScheck to show the doors, all windows and floor area. I also need bearing in foundation for loads from above.
|
Case Summary (BLD) | | | 9/22/2003 | | |
|
|
|
|
Plan Review Report | | | 9/22/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2003 | | DONE |
|
|
|
|
Pending Assignment by DJO | 9/12/2003 | | 9/17/2003 | | DONE |
Dan Overy
|
|
|
9/17/2003 08:17:51 SAM - activity updated through activity BLDA183 from case BLD03-02210.
|
Plan Reviewer's activity | | | 9/17/2003 | | PEND |
|
|
|
9/17/03 09:43 I called and left a message on the builders phone. I let them know that someone need to pick up the plans and provide tall wall engineering, if done like plans show, and the foundation needs to be redesigned to handle loads.
|
Routing - PUBLIC WORKS | 9/12/2003 | | 9/15/2003 | | PASS |
|
|
|
|
Application received | | | 9/12/2003 | | |
|
|
|
|
Routing - PLANNING | 9/12/2003 | | 9/12/2003 | | PASS |
|
|
|
|