Permit Information
Permit NumberBLD03-02216
StatusFinaled
Name JAMES GIPSON
Site Address 3684 N HARBOR LN
Project NameErland Medical Office
Customer Number 
ePlanReviewNo
Description
Dr. Erland Medical Office Building - To construct a new 2200 square foot, one story, wood framed office building and related site improvements. All construction per the approved plans and attached comment list. A lot line adjustment must be recorded prior to issuance of the certificate of occupancy. By signing this permit, the applicant unstands that he is proceeding at his own risk and that a recorded lot line adjustment is required prior to legal ocupancy. PC#563-03 CUP98-00039/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/23/20043/23/2004 DONE
First Notice 3/23/20043/23/2004 DONE
Permanent occupancy UNPAID FEE  3/23/2004 DONE
Perm. Occ. Cert. # 10046 issued 3-19-04 to the Erland Medical Office.
Permanent Occupancy 3/19/20043/19/2004 DONE
Details
FIRE-Final Inspection3/17/20043/18/20043/18/2004APASS
DetailsTroy Cobbley
fire life safety finaled. Hvac unit did not require automatic shutdown 3/18/2004 11:07:08 AM
BLD-Final3/17/20043/18/20043/18/2004PPART
DetailsTony Young
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
perm. c of o ok after trades 3/18/2004 4:41:35 PM
Case Summary (BLD)  2/18/2004  
BLD-Framing/Rough-in1/16/20041/16/20041/16/2004PPASS
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
energy ok also 1/16/2004 4:35:43 PM
BLD-Framing/Rough-in1/14/20041/14/20041/14/2004PPART
DetailsTony Young
bob ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n on truss fixes 1/14/2004 4:25:00 PM
(F) Reprint permit  11/21/2003  
BLD-Foundation11/18/200311/19/200311/19/2003APART
DetailsTony Young
Jason; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Footing11/18/200311/18/200311/18/2003PPART
DetailsTony Young
jason; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  11/17/2003 DONE
Inspection Record Card- Bld  11/17/2003 DONE
Print Occupancy Form  11/17/2003 DONE
Override - Parcel Holds  11/13/2003  
Permit Ready to Issue  11/13/2003 DONE
Telephone call  11/13/2003 DONE
left mess that permit is ready
Routing - PLAN CHECK11/10/2003 11/12/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/12/2003 PASS
Plan assigned to (JCM)9/18/2003 11/12/2003 PASS
DetailsJohn Menard
11/12/2003 09:44:08 JCM - activity updated through activity BLDA022 from case BLD03-02216.
Routing - FIRE11/6/2003 11/10/2003 PASS
resubmittal acceptable
Routing - PLANNING11/3/2003 11/6/2003 PASS
Approved per DRH03-184.
Routing - PLAN CHECK11/6/2003 11/6/2003 PASS
Plan Reviewer's activity  11/6/2003 PASS
Plans reviewed and approved with attached comment list and redlined notes. JCM
Routing - PLAN CHECK10/27/2003 11/3/2003  
Plan resubmittals received  11/3/2003 DONE
Received one copy of plan review response letter, one copy of letter from Fred Ramey attorney at law, two copies of envelope compliance certificate and four copies of revised sheets 1 thru 6. Routed to John M. kmm
Routing - PUBLIC WORKS10/24/2003 10/27/2003 PASS
Routing - Erosion and Sediment10/23/2003 10/24/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS10/17/2003 10/23/2003 FAIL
Requies geotech plan per Brian Murphy. kmm
Routing - PLAN CHECK10/13/2003 10/17/2003  
Routing - FIRE10/8/2003 10/13/2003 FAIL
No fire flow info, no hydrants, no FD access shown. REview faxed to architect.
Plan resubmittals requested  10/8/2003  
Mailed the architect a copy of plan review report and energy report requesting revisions. JCM
Routing - PLAN CHECK10/2/2003 10/8/2003 FAIL
Routing - PLUMBING10/1/2003 10/1/2003 PASS
Routing - PLANNING9/25/2003 10/1/2003 FAIL
Needs Design Review approval. Phone James Gipson and informed him of the status. He stated that he will contact Bob Erland.
Plan resubmittals received  9/26/2003 DONE
Received two copies of revised ESC plans and Narrative. Put with plans. kmm
Routing - Erosion and Sediment9/24/2003 9/24/2003 FAIL
RP listed is not certified and plan not specific to project.
Routing - PUBLIC WORKS9/19/2003 9/22/2003 FAIL
Requires drainage plan and geotech report.
Plan resubmittals received  9/22/2003 DONE
Received signed ESC plans. kmm
Plan resubmittals received  9/22/2003 DONE
Received six sheets of C1 put with plans
Routing - PLANNING Land Div9/18/2003 9/19/2003 PASS
Approved, Lot 2 of Pyrmont Subdivision.
Plans ACCEPTED BY PLAN TECH  9/18/2003 DONE
Have asked for two signed ESC plans. The ones submitted were not signed. Contacted Bob Erland. kmm
Plan routing begun/NEW & ADDTN  9/18/2003 DONE
Application received  9/12/2003  
Recd Pcfee & Taken To Pln CK  9/12/2003  
Fee Review-notes9/12/20039/12/2003   
Routing Off Site -Energy9/18/2003    
Contacted Ron O to pick up plans. kmm