Permit Information
Permit NumberBLD03-02236
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 3138 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(Bown Crossing Market Place-Bldg A) * To construct a new 8,870 sq.ft. noncombustible, two story, combination retail, office and residential, shell only building, on a zero lot line. The 1st floor is 5,080 sq,ft and the 2nd floor is 3,790 sq.ft. NOTE: This building is fully fire sprinklered per NFPA 13 and is being used for code reductions and fire flow. Separate permits, plans and Certificate of Occupancies must be obtained and approved for each tenant space to be occupied. All construction per the approved plans and attached comment list. MJP PC#551-03 DRH03-00034
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/17/200510/17/200510/17/2005 PASS
DetailsJim Storey
First Notice10/17/200510/17/200510/17/2005 DONE
DetailsJim Storey
DOC - Permit Finaled10/17/200510/17/200510/17/2005PPASS
DetailsJim Storey
First Notice 9/19/20059/19/2005 DONE
Second Notice 9/19/20059/19/2005 DONE
Third Notice 9/19/20059/19/2005 DONE
FIRE-Final Inspection8/12/20058/15/20058/15/2005APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection8/11/20058/12/20058/12/2005AFAIL
DetailsTroy Cobbley
Need to repair the emergency lights in the stairwells and the exit discharge lighting. Provide NFPA 72 record of completion forms to the inspector as well.
BLD-Final8/11/20058/12/20058/11/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/11/2005 at 10:53:01 AM. Contact: ###-####.ceilling ok
FIRE-Final Inspection8/11/20058/11/20058/11/2005PFAIL
DetailsTroy Cobbley
repair emergency lights and provide the canopies for the sprinkler pendants. final fire alrm permit
Code Occupancy Approval8/10/20058/10/20058/10/2005PPASS
DetailsWm. Michael Meloy
Compliance met.
BLD-Aging Inspection6/20/20056/20/20056/20/2005 PASS
DetailsJim Storey
wip
BLD-Framing/Rough-in4/19/20054/19/20054/19/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/19/2005 at 9:17:31 AM. Contact: ###-####.east stair framing ok.
BLD-Framing/Rough-in4/7/20054/8/20054/8/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/7/2005 at 12:40:16 PM.
BLD-Framing/Rough-in3/22/20053/23/20053/23/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/22/2005 at 5:00:24 PM. Contact: ###-####. p/l wall ok /insulation ok. 3/23/2005 2:59:12 PM
BLD-Other3/15/20053/15/20053/15/2005PPASS
DetailsJim Storey
first floor to 2nd ok 2hr wall joint fire stopping
PubWorks Occupancy Approval1/26/20051/26/20051/26/2005 DONE
Final approval of drainage by B.Murphy 01/26/05
BLD-Aging Inspection9/10/20049/10/20049/10/2004 PASS
DetailsJim Storey
wip 9/13/2004 11:39:18 AM
BLD-Aging Inspection6/22/20046/22/20046/22/2004 PASS
DetailsJim Storey
BLD-Framing/Rough-in4/16/20044/16/20044/16/2004PPASS
DetailsJim Storey
nick grouting; Phone #: ###-#### Internet Inspection Request from: Darla Downs special insp. onsite. 4/16/2004 3:49:36 PM
BLD-Aging Inspection3/15/20043/15/20043/15/2004 PASS
DetailsJim Storey
wip 3/15/2004 8:18:22 AM
Plan resubmittals received  2/24/2004 DONE
Received three requested changes to the Bown shell and core projects. Routed to Mike P. kmm
BLD-Foundation1/9/20041/12/20041/12/2004APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/9/2004 at 2:35:08 PM. Contact: ###-####. Subject to special inspection. 1/12/2004 10:52:27 AM
BLD-Footing12/30/200312/31/200312/31/2003ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/30/2003 at 8:59:26 AM. Contact: ###-####.
Plan resubmittals received  12/24/2003 DONE
Received response letter to previous plan review, 16 soils reports, and 2 sets of sheets C1-A, a2.11a, a4.11a, a5.00, a5.11, S2.11a, s3.11a, S4.11, S6.11, S7.11 and m1.01a and forwarded to Mike Phillips.
(F) Reprint permit  12/9/2003  
Inspection Record Card- Bld  12/8/2003 DONE
Telephone call  12/8/2003 DONE
left mess that permit is ready
Permit Ready to Issue  12/8/2003 DONE
Issue PAID IN FULL permit  12/8/2003 DONE
Routing - PLAN CHECK12/3/2003 12/5/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/5/2003 DONE
Plan assigned to (M_P)9/16/2003 12/5/2003 PASS
DetailsMike Phillips
12/5/2003 16:49:01 M_P - activity updated through activity BLDA022 from case BLD03-02236.
Routing - PLAN CHECK12/2/2003 12/3/2003 FAIL
Second review failed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - Erosion and Sediment12/2/2003 12/2/2003 PASS
Routing - PLAN CHECK11/26/2003 12/2/2003  
Routed to ESC.
Plan resubmittals received  12/2/2003 DONE
Received two copies of revised ESC and narrative. Routed to Mike P. kmm
Routing - PLANNING11/26/2003 11/26/2003 PASS
Routing - Erosion and Sediment11/26/2003 11/26/2003 FAIL
See comments under Erosion Control Permit.
Routing - PLANNING Land Div11/26/2003 11/26/2003 PASS
Riverwalk Subdivision No. 1 recorded 11-25-03. Lot 2 of Block 3.
Routing - FIRE11/21/2003 11/25/2003 PASS
REsubmittal acceptable.
Routing - PUBLIC WORKS11/14/2003 11/21/2003 PASS
Plan resubmittals received  11/17/2003 DONE
Received two copies of ESC report. Routed to Mike P. kmm
Plan resubmittals received  11/14/2003 DONE
Received a transmittal letter to Mike P. & transmittal letter to Marty S. two A1.11 sheets. Taken to Mike P.
Plan resubmittals received  11/14/2003 DONE
Received transmittal letter from Toothman orton engineering & ESC narrative. Taken to Mike P.
Routing - PLAN CHECK11/5/2003 11/14/2003  
Plan resubmittals received  11/12/2003 DONE
Received two copies of revised sheets a1.11 and C1-A, one copy of fire flow package from United Water, letter from Dave miller and one copy of plan review response letter. routed to Mike P. kmm
Plan resubmittals received  11/10/2003 DONE
Received transmittal letter, response letter,two copies of supplemental structural calculations,two sets of sheets A1.11,A2.11A,A3.11A,A4.11A,A5.00,A5.11,A6.11A,S1.11,S2.11A,S3.11A,S4.11,S5.11,S5.12,S6.11,S7.11,C1.A,E2.1I,M1.01A taken to Mike P.
Routing - FIRE10/28/2003 11/5/2003 FAIL
FD access, fire water flow and AS valving issues; review faxed to architect and attached.
Routing Off Site -Energy9/16/2003 10/28/2003 FAIL
Contacted Ron O for outside enregy review.
Routing - PLAN CHECK10/2/2003 10/28/2003 FAIL
Plan review completed, sent correction report to archtitect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLUMBING9/26/2003 10/2/2003 PASS
Routing - PLANNING9/25/2003 9/26/2003 FAIL
Landscape plan does not comply with Design Review DRH03-34.
Plan resubmittals received  9/26/2003 DONE
Received transmittal sheet with Erosion & sediment control design report. taken to Mike P.
Routing - Erosion and Sediment9/22/2003 9/25/2003 FAIL
No ESC narrative attached to plans.
Routing - PUBLIC WORKS9/16/2003 9/22/2003 FAIL
Requires site plans showing meets and bounds with utilities and easements being shown and building. Per April Miller Requires O&M manual and geotech report. Per Brian Murphy. Sanitary sewer is considered public and needs to be reviewed and approved separately by PW. Per John Johnson. kmm
Plans ACCEPTED BY PLAN TECH  9/16/2003 DONE
Requires ESC RP and energy compliance cert. needs to be signed. kmm
Routing - PLANNING Land Div9/16/2003 9/16/2003 FAIL
Do not issue building permit until plat of Riverwalk Subdivision is recorded.
Plan routing begun/NEW & ADDTN  9/16/2003  
Application received  9/15/2003  
Recd Pcfee & Taken To Pln CK  9/15/2003  
Fee Review-notes9/15/20039/15/2003