First Notice | | 4/7/2004 | 4/7/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/7/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10084 issued 4-7-04 to Peterson Motors.
|
Permanent Occupancy | | 4/6/2004 | 4/6/2004 | | DONE |
|
|
|
|
BLD-Final | 4/5/2004 | 4/6/2004 | 4/6/2004 | A | PASS |
Jim Sly
|
|
|
joel; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 4/6/2004 1:09:17 PM OK for Perm Occ. :) 4/6/2004 2:12:09 PM
|
FIRE-Final Inspection | 2/5/2004 | 2/6/2004 | 2/6/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 2/6/2004 9:52:33 AM
|
BLD-Final | 2/5/2004 | 2/6/2004 | 2/6/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/5/2004 at 3:24:55 PM. Contact: ###-####. 2/6/2004 11:23:03 AM OK for Temp Occ. Perm Occ. OK when landscaping complete and bond released. 2/6/2004 3:29:33 PM
|
Temporary occupancy | | | 2/6/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5072 issued 5-6-04 to Peterson Auto Plex.
|
Code Occupancy Approval Temp | | | 2/5/2004 | | PEND |
|
|
|
NEEDS TO BOND FOR $11,660 FOR LAND SCAPE AND CURBING THEN CAN SIGNE TEMP OCCUPANCY.
|
PubWorks Occupancy Approval | 2/4/2004 | 2/4/2004 | 2/4/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 2/4/04. R.Rokovitz
|
BLD-Conference | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 8:17:36 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/20/2004 | 1/21/2004 | 1/21/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/20/2004 at 9:43:43 AM. Contact: ###-####.
|
BLD-Foundation | 11/19/2003 | 11/20/2003 | 11/20/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/19/2003 at 3:00:39 PM.
|
BLD-Footing | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | PASS |
Jim Sly
|
|
|
joel ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
(F) Reprint permit | | | 10/29/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/28/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/28/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/28/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/28/2003 | | DONE |
|
|
|
Spoke with David told permit ready & fees
|
Issue PAID IN FULL permit | | | 10/28/2003 | | DONE |
|
|
|
|
Routing - PLANNING | 10/24/2003 | | 10/27/2003 | | PASS |
|
|
|
Approved per DRH03-11 and modification.
|
Routing - PLAN CHECK | 10/27/2003 | | 10/27/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2003 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 9/18/2003 | | 10/27/2003 | | PASS |
John Menard
|
|
|
10/27/2003 13:47:14 JCM - activity updated through activity BLDA022 from case BLD03-02241.
|
Routing - FIRE | 10/17/2003 | | 10/24/2003 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 10/24/2003 | | 10/24/2003 | | |
|
|
|
|
Plan resubmittals received | | | 10/17/2003 | | DONE |
|
|
|
Received two SD-1 sheets taken to John M.
|
Plan Reviewer's activity | | | 10/17/2003 | | PASS |
|
|
|
Reviewed and approved resubmitted site plan. JCM
|
Routing - PLAN CHECK | 10/15/2003 | | 10/17/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/16/2003 | | DONE |
|
|
|
Received United Water Letter. Routed two copies to John M and put one copy in file. kmm
|
Routing - FIRE | 10/9/2003 | | 10/14/2003 | | FAIL |
|
|
|
Awaiting FH flow information from architect, phoned architect to request, Bill Waite will obtain and fax tomorrow. Discussed other issues critical to review, i.e. FD access, fence around building, hazardous materials.
10/15/03 - water supply info not received. Faxed written report to architect.
|
Routing - PLAN CHECK | 10/6/2003 | | 10/9/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 10/9/2003 | | |
|
|
|
Mailed the architect a copy of the plan review report requesting revisions. JCM
|
Routing - PUBLIC WORKS | 10/2/2003 | | 10/3/2003 | | PASS |
|
|
|
|
Routing - PLUMBING | 9/25/2003 | | 10/1/2003 | | PASS |
|
|
|
need cleanout on discharge line of flamable liquids interceptor
|
Routing - PLANNING | 9/24/2003 | | 9/25/2003 | | FAIL |
|
|
|
Need cross-access agreements for property to the north. See DRH03-11, Mod. #2 conditions of approval.
|
Routing - Erosion and Sediment | 9/23/2003 | | 9/24/2003 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/19/2003 | | 9/23/2003 | | FAIL |
|
|
|
per Brian M. requires drainage plan geotech, revise civil plans to show connection into the manhole, tap permit required change size of sewer to 8" not 10" per John Johnson.
|
Routing - PLANNING Land Div | 9/19/2003 | | 9/19/2003 | | PASS |
|
|
|
Approved, ROS 5803.
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2003 | | PASS |
|
|
|
Received three sets of C1.0, C1.1, C1.2, C1.3, C1.4, C1.5,C1.6, foundations calcs, O&M manual, Erosion & Sediment Plan, Storm Water Management Plan. Put with plans.
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2003 | | PEND |
|
|
|
Called and left a message with David Moe that we need 5 extra civil sets stamped and signed legibly, one Drainage Calc. One O&M manual, Erosion plan preparer needs to sign his plan.
|
Telephone call | | | 9/18/2003 | | DONE |
|
|
|
David called and talked to Kathy and said he would have all the requirements in to day.
|
Plan Reviewer's activity | | | 9/18/2003 | | DONE |
|
|
|
Civil engineer came to pick up plans to stamp & sign them because we can't read the stamp . 9-19-03 received plans back and starting routing
|
Application received | | | 9/15/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/15/2003 | | DONE |
|
|
|
|
Fee Review-notes | 9/15/2003 | 9/15/2003 | | | |
|
|
|
|