(Mutual Materials)(Concrete paver plant) * To install a concrete paver machine with related equipment into an existing building and on the site which includes and 8x8 rooftop equipment room, retaining walls and foundations for equipment all per engineered plans . A new certificate occupancy is to be issued to this building which will require a field safety inspection by Fire and Structural inspectors. DRH03-00168. No other work than shown on the approved plan is authorized by this permit. This building was constructed in Ada County in 1976.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/27/2005 DONE
First Notice has not been responded to.
First Notice 5/18/20044/26/2005 DONE
Permanent occupancy  5/18/2004 DONE
Perm. Occ. Cert. # 10143 issued 5-18-04 to Mutual Materials.
Permanent Occupancy 3/30/20043/30/2004 DONE
Details
FIRE-Final Inspection3/30/20043/30/20043/30/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/30/2004 at 9:20:05 AM. Contact: ###-####.
BLD-Final3/25/20043/29/20043/29/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/25/2004 at 8:47:12 AM. Contact: ###-####. final ok pending sign offs from others. 3/29/2004 9:58:04 AM
Code Occupancy Approval3/29/20043/29/20043/29/2004PPASS
DetailsWm. Michael Meloy
Compliance met. 3/29/2004 2:38:36 PM
BLD-Aging Inspection2/27/20042/27/20042/27/2004 NR
DetailsJim Storey
pending fire c/n 2/27/2004 8:05:10 AM
BLD-Footing11/24/200311/25/200311/25/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/24/2003 at 11:00:57 AM. Contact: ###-####. wall rebar ok north wall. 11/25/2003 3:26:08 PM
FIRE-Final Inspection11/24/200311/25/200311/25/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/24/2003 at 11:02:23 AM. Contact: ###-####. need exit signs and emergency lights in shop; need hardware on shop exit doors; extinguishers in shop and office; remove lock on interior office door; add "Door to remain unlocked..." sign at main exit 11/25/2003 1:56:06 PM
BLD-Footing10/14/200310/15/200310/15/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/14/2003 at 10:00:07 AM. Contact: ###-####. wip mti doing special insp. 10/15/2003 10:43:15 AM
Issue PAID IN FULL permit  10/8/2003 DONE
Inspection Record Card- Bld  10/7/2003 DONE
Print Occupancy Form  10/7/2003 DONE
Permit Ready to Issue  10/7/2003 DONE
Telephone call  10/7/2003 DONE
Spoke with Jeff told permit ready & fees
Plan assigned to (MLO)9/17/2003 10/6/2003 PASS
DetailsMike Otto
10/6/2003 16:14:21 MLO - activity updated through activity BLDA022 from case BLD03-02246.
Routing - PLANNING10/6/2003 10/6/2003 PASS
Approved per DRH03-168. Received phone call from Renee Hays at the Airport stating that Avigation easement has been sent to be recorded.
PLANS/APPL TAKEN TO FRONT DESK  10/6/2003 DONE
Routing - Erosion and Sediment10/1/2003 10/3/2003 PASS
ESC approved with conditions attached to plans.
Plan resubmittals received  9/30/2003 DONE
Received two copies of sheet EC-1 and two copies of ESC narrative. One copy of ESC application and one copy of Storm Water Operation and maintenance plan for Brian M. Routed to Mike O. kmm
Routing - PLAN CHECK9/26/2003 9/26/2003 NR
Routing - FIRE9/23/2003 9/25/2003 PASS
Approved subject to satisfactory IFC life/safety inspection by PDC fire including verification of specific PFE requirements, exit hardware and lighting as annotated on sheet B-4
Routing - PLAN CHECK9/23/2003 9/23/2003 PASS
Installing equip only will get field safety inspection for occupancy as agreed with G. Slane, J. Storey, M. Southard and M.Otto 9/23/2003
Routing - PLANNING9/22/2003 9/23/2003 FAIL
Plans do not comply with the conditions of approval for DRH03-168. Condition 1a requires handicapped parking stalls and condition 1c requires that a copy of the recorded avigation easement be submitted. Left message for Jeff Linstad 9/22/03.
Routing - Erosion and Sediment9/22/2003 9/22/2003 FAIL
No ESC permit, no plan.
Routing - PUBLIC WORKS9/22/2003 9/22/2003 PASS
Routing - PUBLIC WORKS9/16/2003 9/17/2003 FAIL
Pending Assignment by JCM9/16/2003 9/17/2003 DONE
DetailsJohn Menard
9/17/2003 07:53:37 JCM - activity updated through activity BLDA174 from case BLD03-02246.
Plan routing begun/NEW & ADDTN  9/16/2003 DONE
Application received  9/16/2003  
Plans ACCEPTED BY PLAN TECH  9/16/2003 DONE
Per Jeff Jones. 1 Arch. sheets not stamped or signed
2. No ESC application or plan