Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD03-02254
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg. 16
Customer NumberPCS#5862
ePlanReviewNo
Description
Micron Building #16 - Remodel for RDL Manufacturing Tools (16-20035862) * This permit is for the footing, foundation and structural frame portion of this project only. To demolish and remove existing concrete slab, excavate down 42 inches and install new reinforced concrete slab and retaining walls. This work is being done at an approximate 7650 square foot area of the basement of Building #16 between grid lines 5&15.5 and N&Q. This permit is also for the installation of some structural steel column and beams to support some relocated exterior curtain wall and glazing. This curtain wall is being relocated from grid line P.8 between grin lines 12.5&14 to grid line Q between grid lines 12.5&14. All construction per the approved plans. This is a structural permit only and no occupancy is approved under this permit. PC#566-03/CZC03-00126/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled1/21/20051/21/20051/21/2005APASS
DetailsJim Storey
Finaled by inspector at 1/21/2005 8:40:39 AM
BLD-Final1/21/20051/21/20051/21/2005APASS
DetailsJim Storey
l/c ok
BLD-Aging Inspection9/20/20049/20/20049/20/2004 DONE
DetailsJim Storey
finaled previously. 9/20/2004 8:08:30 AM
BLD-Final7/6/20047/7/20047/7/2004APASS
DetailsJim Storey
ernie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok 7/7/2004 10:57:33 AM
BLD-Aging Inspection6/8/20046/8/20046/8/2004 PASS
DetailsJim Storey
BLD-Conference4/8/20044/8/20044/8/2004PPART
DetailsJim Storey
bernie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore list w/ernie 4/12/2004 12:30:28 PM
BLD-Conference3/23/20043/23/20043/23/2004PPASS
DetailsJim Storey
ernie; Phone #: ###-#### Internet Inspection Request from: Annette Moore need to verify duct protection/ and fire stopping. 3/23/2004 4:28:16 PM
BLD-Aging Inspection3/15/20043/15/20043/15/2004 PASS
DetailsJim Storey
wip 3/15/2004 8:19:15 AM
BLD-Concrete1/8/20041/13/20041/13/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/8/2004 at 1:32:30 PM. Contact: ###-####. placed with special insp. 1/14/2004 2:48:38 PM
BLD-Concrete1/8/20041/9/20041/9/2004ADONE
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/8/2004 at 1:31:24 PM. Contact: ###-####.
BLD-Footing12/29/20031/2/20041/2/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:13:29 PM. Contact: ###-####. placed w/si 1/2/2004 12:36:28 PM
BLD-Concrete12/30/200312/31/200312/31/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:13:11 PM. Contact: ###-####. ramp of coridor rebar ok 12/31/2003 10:37:24 AM
BLD-Concrete12/30/200312/31/200312/31/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:13:47 PM. Contact: ###-####.
BLD-Concrete12/29/200312/30/200312/30/2003ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:13:11 PM. Contact: ###-####.
BLD-Footing12/29/200312/30/200312/30/2003ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:13:47 PM. Contact: ###-####.
BLD-Footing12/19/200312/23/200312/23/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:22:33 AM. Contact: ###-####. coridor demo of floor in progess. 12/23/2003 1:40:38 PM
BLD-Footing12/19/200312/22/200312/22/2003ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:22:49 AM. Contact: ###-####.
BLD-Footing12/22/200312/22/200312/22/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:22:49 AM. Contact: ###-####. wip 12/22/2003 2:44:22 PM
BLD-Footing12/19/200312/19/200312/19/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:22:12 AM. Contact: ###-####. wip 12/19/2003 3:39:21 PM
BLD-Footing12/11/200312/16/200312/16/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:32:53 PM. wip 12/16/2003 1:43:17 PM
BLD-Footing12/11/200312/16/200312/16/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:33:16 PM. rebar ok at south end of area b walls. 12/16/2003 8:13:59 AM
BLD-Footing12/11/200312/15/200312/15/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:32:33 PM.
BLD-Footing12/11/200312/12/200312/12/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:32:16 PM. placed w/si 12/12/2003 3:16:11 PM
BLD-Conference12/11/200312/11/200312/11/2003PFAIL
DetailsJim Storey
ernie; Phone #: ###-#### Internet Inspection Request from: Darla Downs need rfi for exsust duct protection to verify wrap assembly will work per listing on fiberglass ducting/ work on strucural fire protection in progess passes at this point. 12/11/2003 4:23:04 PM
BLD-Footing12/4/200312/9/200312/9/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/4/2003 at 1:24:57 PM. Contact: ###-####. wip si report pending. 12/9/2003 4:24:32 PM
BLD-Footing12/4/200312/8/200312/8/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/4/2003 at 1:24:38 PM. Contact: ###-####. reports pending 12/8/2003 11:01:13 AM
BLD-Footing12/4/200312/5/200312/5/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/4/2003 at 1:24:19 PM. Contact: ###-####. placeed under spec inspection 12/5/2003 12:21:57 PM
BLD-Footing11/21/200311/26/200311/26/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/21/2003 at 3:36:22 PM. Contact: ###-####.pwsi 11/26/2003 3:16:32 PM
BLD-Footing11/21/200311/25/200311/25/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/21/2003 at 3:36:05 PM. Contact: ###-####. corridor trench wall ok 11/25/2003 4:21:03 PM
BLD-Footing11/21/200311/24/200311/24/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/21/2003 at 3:35:46 PM. Contact: ###-####. placed w/special insp. 11/24/2003 2:21:06 PM
BLD-Footing11/14/200311/17/200311/17/2003APART
DetailsJim Storey
placed w/sp. 11/17/2003 10:59:32 AM
BLD-Footing11/11/200311/14/200311/14/2003PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/11/2003 at 2:41:05 PM. Contact: ###-####. wip 11/14/2003 3:39:25 PM
BLD-Footing11/11/200311/13/200311/13/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/11/2003 at 2:40:36 PM. Contact: ###-####. rebar being placed. 11/13/2003 4:01:13 PM
BLD-Footing11/11/200311/12/200311/12/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/11/2003 at 2:40:02 PM. Contact: ###-####. wip 11/12/2003 3:53:42 PM
BLD-Footing11/4/200311/6/200311/6/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/4/2003 at 9:37:58 AM. Contact: ###-####. 2 nd bay from north end placing concrete rebar ok. wall forms and steel for north bay ok. 11/7/2003 11:07:17 AM
BLD-Footing11/4/200311/6/200311/6/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/4/2003 at 9:38:38 AM. Contact: ###-####. wip 11/6/2003 10:15:18 AM
BLD-Footing11/4/200311/5/200311/5/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/4/2003 at 9:37:31 AM. Contact: ###-####. wip. 11/5/2003 3:30:38 PM
BLD-Footing10/30/200311/4/200311/4/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2003 at 12:53:57 PM. Contact: ###-####. exavation in progess/ 2 nd bay to the east from the west end form work in progess. need reinsp of colm. base west wall need for debri uncovered. 11/4/2003 9:28:05 AM
BLD-Footing11/4/200311/4/200311/4/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/4/2003 at 9:36:59 AM. Contact: ###-####. wip 11/4/2003 2:44:49 PM
BLD-Footing10/30/200311/3/200311/3/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2003 at 12:53:31 PM. Contact: ###-####. wip 11/3/2003 11:37:53 AM
BLD-Footing10/30/200310/31/200310/31/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2003 at 12:52:59 PM. Contact: ###-####. placing concrete on sat.11/1/03 pending reports. 10/31/2003 12:46:21 PM
BLD-Footing10/28/200310/30/200310/30/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/28/2003 at 8:32:31 AM. Contact: ###-####.
BLD-Footing10/28/200310/29/200310/29/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/28/2003 at 8:31:54 AM. Contact: ###-####. north end slab on grade rebar ok for cover. 10/29/2003 2:58:39 PM
BLD-Footing10/28/200310/28/200310/28/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/28/2003 at 8:31:08 AM. Contact: ###-####. pwsi pending report 10/28/2003 3:02:33 PM
Issue & PRINT to be Invoiced  10/24/2003 DONE
Inspection Record Card- Bld  10/24/2003 DONE
Print Occupancy Form  10/24/2003 DONE
Plan assigned to (JCM)9/19/2003 10/17/2003 PASS
DetailsJohn Menard
10/17/2003 15:50:40 JCM - activity updated through activity BLDA022 from case BLD03-02254.
Routing - Erosion and Sediment10/16/2003 10/17/2003 PASS
ESC approved.
Routing - PLAN CHECK10/17/2003 10/17/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/17/2003 PASS
Routing - PLANNING10/15/2003 10/16/2003 PASS
Approved per CZC03-126.
Routing - PLAN CHECK10/6/2003 10/15/2003  
Plan resubmittals received  10/15/2003 DONE
Received ESC application and letter. Routed to John and file. kmm
Routing - Erosion and Sediment10/15/2003 10/15/2003 NR
Routing - PLAN CHECK10/2/2003 10/3/2003  
Routing - Erosion and Sediment10/3/2003 10/3/2003 FAIL
No Completed ESC application or Waiver request.
Routing - FIRE9/24/2003 10/2/2003 PASS
No review comments necessary.
Plan Review Completed(1st rev)  10/2/2003 FAIL
Failed ESC
Routing - PLAN CHECK9/23/2003 9/24/2003 PASS
Plan Reviewer's activity  9/24/2003 PASS
Plans and calculations approved as submitted. JCM
Routing - Erosion and Sediment9/23/2003 9/23/2003 FAIL
No completed ESC application.
Routing - PUBLIC WORKS9/22/2003 9/23/2003 PASS
Plans ACCEPTED BY PLAN TECH  9/19/2003 PEND
Faxed ESC application to Paul Marcolina.
Application received  9/17/2003  
Fee Review-notes9/17/20039/17/2003