Permanent Occupancy | | | 4/13/2010 | | DONE |
Tisha Gallop
|
|
|
tenant was supposed to have received a certificate of occupancy upon final inspection of this permit, see occupancy sign off card scanned into documents and Y in signature tab.
|
Letter of compliance | | | 12/2/2003 | | DONE |
|
|
|
Letter of Complliance # 24368 issued 12-2-03
|
FIRE-Final Inspection | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety and fire sprinkler finaled 11/26/2003 9:03:22 AM
|
BLD-Final | 11/25/2003 | 11/26/2003 | 11/26/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/25/2003 at 1:45:10 PM. Contact: ###-####. OK for Perm Occ. :) 11/26/2003 3:14:07 PM
|
FIRE-Final Inspection | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | FAIL |
Troy Cobbley
|
|
|
hang fire extinguisher, repair the exit sign, remove the door magnet and provide closure on the connecting door 11/25/2003 4:31:38 PM
|
FIRE-Final Inspection | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | FAIL |
Troy Cobbley
|
|
|
hang fire extinguisher, repair the exit sign, remove the door magnet and provide closure on the connecting door 11/25/2003 4:31:38 PM
|
BLD-Framing/Rough-in | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/31/2003 at 11:06:18 AM. Contact: ###-####.
|
Inspection Record Card- Bld | | | 10/23/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/9/2003 | | 10/16/2003 | | PASS |
|
|
|
Resubmittal drawing received 10/14/03 verified to answer code review questions of 10/3/03. Ready to take to permit desk for issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2003 | | PASS |
|
|
|
To permit desk to issue.
|
Inspection Record Card- Bld | | | 10/16/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/16/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2003 | | DONE |
|
|
|
CALLED , PERMIT READY & FEE GIVEN TO BARB///DLD 10-16-03 12:41
|
CHANGE STATUS TO (R) | | | 10/16/2003 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 9/22/2003 | | 10/16/2003 | | PASS |
Dan Stuart
|
|
|
10/16/2003 09:40:54 DRS - activity updated through activity BLDA022 from case BLD03-02256.
|
Plan resubmittals received | | | 10/15/2003 | | DONE |
|
|
|
Received two copies of revised plans and one copy of letter. Routed to Dan S. kmm
|
Routing - FIRE | 10/3/2003 | | 10/8/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 10/3/2003 | | FAIL |
|
|
|
Copy of corrections mailed and faxed to architect with copy to tenants representative, Frank Lee. Routing to fire code analyst.
|
Routing - PLAN CHECK | 9/23/2003 | | 10/3/2003 | | FAIL |
|
|
|
Clarifications & plan resubmittals required. Copy of corrections & items needing clarification faxed and mailed to architect, Peter Rockwell and to Pharmerica rep, Frank Lee. Routing to fire code analyst for review.
|
Routing - PUBLIC WORKS | 9/22/2003 | | 9/23/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/22/2003 | | DONE |
|
|
|
|
Application received | | | 9/17/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/17/2003 | | DONE |
|
|
|
|