BLD-Final | 6/10/2004 | 6/10/2004 | 6/10/2004 | P | PASS |
Troy James
|
|
|
colin; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Letter of compliance | | | 6/10/2004 | | DONE |
|
|
|
Letter of Compliance issued 6-10-04.
|
BLD-Final | 5/20/2004 | 5/21/2004 | 5/21/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 2:06:05 PM. Contact: ###-####. ok for temp occ needs plumb to go prem needs to install signage and one fire damper at 6th floor storage room 5/21/2004 10:17:49 AM
|
Temporary occupancy | | | 5/21/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5114 issued 5-21-04 to the U.S. Attorney's Office
|
BLD-Final | 5/19/2004 | 5/20/2004 | 5/20/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2004 at 11:45:18 AM. Contact: ###-####. needs letters from mti and engineer, ADA signage elev stairs restrooms .needs fire wall and fire dampers 7thfl around fire storage room need fire damper and fire caulking storage room 5/20/2004 11:17:58 AM
|
FIRE-Final Inspection | 5/18/2004 | 5/19/2004 | 5/19/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/18/2004 at 4:11:59 PM. Contact: ###-####.
|
BLD-Other | 5/7/2004 | 5/7/2004 | 5/7/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/7/2004 at 7:46:43 AM. Contact: ###-####. ceiling gred 7th floor ok 5/7/2004 3:40:55 PM
|
BLD-Framing/Rough-in | 4/26/2004 | 4/27/2004 | 4/27/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 11:07:17 AM. Contact: ###-####. 4/27/2004 10:51:41 AM ceiling grid ok to cover 4/27/2004 4:02:58 PM
|
FIRE-Sprinkler Rough-in | 4/16/2004 | 4/19/2004 | 4/19/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/16/2004 at 1:08:55 PM. Contact: ###-####. See sprinkler FIR permit for details 4/19/2004 3:00:36 PM
|
FIRE-Sprinkler Rough-in | 4/9/2004 | 4/12/2004 | 4/12/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/9/2004 at 12:42:05 PM. Contact: ###-####. See sprinkler permit for details; okay to cover perimeter offices as shown on sprinkler plans 4/12/2004 10:30:46 AM
|
BLD-Framing/Rough-in | 4/5/2004 | 4/6/2004 | 4/6/2004 | A | CANC |
Dave Hannah
|
|
|
colyn celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 4/6/2004 | 4/6/2004 | 4/6/2004 | P | PART |
Dave Hannah
|
|
|
colyn celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs out side rooms ok to cover after elec signs off lights 4/6/2004 5:29:06 PM
|
BLD-Conference | 3/24/2004 | 3/25/2004 | 3/25/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 10:32:04 AM.
|
FIRE-Conference | 3/25/2004 | 3/25/2004 | 3/25/2004 | A | PART |
Rick Jackson
|
|
|
Met with GC about exit signs 3/25/2004 11:21:41 AM
|
BLD-Framing/Rough-in | 2/27/2004 | 2/27/2004 | 2/27/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/27/2004 at 10:37:38 AM. Contact: ###-####.
|
FIRE-Conference | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/23/2004 at 11:04:03 AM. Contact: ###-####. met with GC about fire extinguisher placement - will two additional at stair doors and the others as shown on plans 2/24/2004 8:52:35 AM
|
BLD-Framing/Rough-in | 2/20/2004 | 2/20/2004 | 2/20/2004 | P | PART |
Dave Hannah
|
|
|
colyn; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to start covering infill walls allbut se corner 2/20/2004 4:01:03 PM
|
BLD-Conference | 2/12/2004 | 2/13/2004 | 2/13/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/12/2004 at 1:29:52 PM.
|
FIRE-Final Inspection | 2/13/2004 | 2/13/2004 | 2/13/2004 | A | DONE |
Rick Jackson
|
|
|
not a final but a conference to determine GC procedure for working in stairwell - the stairwell will be maintained during construction 2/13/2004 4:05:46 PM
|
Issue PAID IN FULL permit | | | 2/4/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2004 | | DONE |
|
|
|
left mess for katie butler that permit is ready
|
Received Certificate of Value | | | 1/29/2004 | | DONE |
|
|
|
Received revised cert. of value * Project value $1,624,658 elect. $169,961 plumb. $65,922 mech. $135,000 fire sprinkler $42,215 fire alarm systems $48,552. Put with file issue copy and records. kmm
|
Telephone call | | | 1/29/2004 | | DONE |
|
|
|
New Cert of value brought in and worked up and new fees calculated and told to Tim Wilcomb//1/29/04 BAM
|
Telephone call | | | 1/8/2004 | | DONE |
|
|
|
Spoke with Tom HOuston and told him that permit is ready & fees///1/8/04 9:41am//BAM
|
Plan resubmittals received | | | 12/26/2003 | | DONE |
|
|
|
Received one copy of response letter. Routed to Sam R. kmm
|
Routing - PLAN CHECK | 11/14/2003 | | 12/23/2003 | | PASS |
|
|
|
Approved as noted on and plan review comments and conditions attached to, all part of the approved plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2003 | | PASS |
|
|
|
To permit desk to issue.
|
Inspection Record Card- Bld | | | 12/23/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/23/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/23/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/23/2003 | | DONE |
|
|
|
Spoke Debbie at CSHQA and told her that the permit is ready & fees//12/23/03 3:27pm BAM
|
Plan assigned to (DRS) | 9/24/2003 | | 12/23/2003 | | PASS |
Dan Stuart
|
|
|
12/23/2003 11:29:35 DRS - activity updated through activity BLDA022 from case BLD03-02287.
|
Plan resubmittals received | | | 12/22/2003 | | DONE |
|
|
|
Received two copies of revised sheets A0.1, A1.1, A2.0, A2.1, A2.2, A5.1, A5.2, A6.1, A6.2, A8.1, A10.1, A10.2, A10.3, A10.4, A10.5, S1.1, S2.1, M0.1, M1.1, M1.2, M2.1, M2.2, M2.3, M3.1, M3.2, M4.1, M5.1, M5.2, MPS1.1, MPS1.2, P0.1, P1.1, P2.1, P2.2, P3.1, E0.1, E1.1, E1.2, E1.3, E2.1, E2.2, E3.1, E3.2, E4.1, E5.1, E5.2, E6.1, F1.0, F3.0, F3.1, F3.2A, F3.2B, F3.3, F3.4, F4.6, F4.7, F4.9, F6.0, F6.1, EN.1, EN.2, and one copy of response letter and one copy of fire department response letter. Routed to Dan S. kmm
|
Routing - FIRE | 11/5/2003 | | 11/13/2003 | | PASS |
|
|
|
review faxed to CSHQA for reference
|
Routing - PLAN CHECK | 9/29/2003 | | 11/5/2003 | | FAIL |
|
|
|
Copy of plan review report and required clarifications and corrections sent to architect.
|
Plan resubmittals requested | | | 11/5/2003 | | FAIL |
|
|
|
Copy of plan review comments for code clarification and resubmittals faxed, mailed and e-mailed to architect of record. Routing plans to fire code analyst.
|
Routing - PUBLIC WORKS | 9/24/2003 | | 9/29/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/22/2003 | | DONE |
|
|
|
|
Application received | | | 9/19/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/19/2003 | | DONE |
|
|
|
|
Fee Review-notes | 9/19/2003 | 9/19/2003 | | | |
|
|
|
|