Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02291
StatusFinaled
Name BOWN CROSSING MARKET PLACE BLDG F
Site Address 3065 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(Bown Crossing Market Place-Bldg F) * To construct a new 6,925 sq.ft. two story, multi-tenant, resitential and mercantile shell building. The first floor is 3,754 sq.ft. and the second floor is 3,171 sq.ft. NOTE: NFPA 13 Sprinkler system required for Code reduction. Separate permits, plans and Certificate of Occupancies must be obtained and approved for each tenant space to be occupied. All construction per the approved plans and attached comment list. The installation of two roof top heating units are being installed for freeze protection. MJP PC#580-03 DRH03-00034
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/19/20059/19/2005 DONE
Third Notice 9/19/20059/19/2005 DONE
First Notice9/12/20059/12/20059/19/2005 DONE
DetailsJim Storey
BLD-Final9/9/20059/12/20059/12/2005APASS
DetailsJim Storey
kent ###-####
DOC - Permit Finaled9/12/20059/12/20059/12/2005PPASS
DetailsJim Storey
BLD-Final9/8/20059/9/20059/9/2005PCANC
DetailsJim Storey
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final9/6/20059/8/20059/8/2005APART
DetailsJim Storey
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore pending fire.
FIRE-Final Inspection9/2/20059/6/20059/6/2005PPART
DetailsForrest France
Fire life safety is satisfactory pending inspection and approval of the related fire alarm permit.
BLD-Final9/2/20059/6/20059/6/2005PCANC
DetailsJim Storey
kent; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Code Occupancy Approval8/10/20058/10/20058/10/2005APASS
DetailsWm. Michael Meloy
Compliance met.
BLD-Framing/Rough-in7/5/20057/6/20057/6/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/5/2005 at 2:08:47 PM. Contact: ###-####. fire walls ok above hard ceillings and framing ok.
BLD-Framing/Rough-in6/20/20056/21/20056/21/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/20/2005 at 11:22:24 AM. Contact: ###-####. stair wall framing ok
BLD-Framing/Rough-in6/13/20056/13/20056/13/2005PPASS
DetailsJim Storey
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore not finaled wrong action by j storey/ exterior framing ok.
CHANGE STATUS TO (ISS)  6/13/2005 DONE
Per Jim Storey accidentally doc finaled
BLD-Framing/Rough-in5/20/20055/23/20055/23/2005PPART
DetailsJim Storey
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Aging Inspection4/6/20054/6/20054/6/2005 PASS
DetailsJim Storey
doc finaled
DOC - Permit Finaled4/6/20054/6/20054/6/2005PPASS
DetailsJim Storey
PubWorks Occupancy Approval1/26/20051/26/20051/26/2005 DONE
Drainage final acceptance by B.Murphy 01/26/05
BLD-Final12/13/200412/13/200412/13/2004PPASS
DetailsJim Storey
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice landings and side walks ok pending si. 12/13/2004 3:41:52 PM
BLD-Final12/8/200412/9/200412/9/2004ANR
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Aging Inspection9/24/20049/24/20049/24/2004 PASS
DetailsJim Storey
wip 9/24/2004 8:23:50 AM
BLD-Aging Inspection6/22/20046/22/20046/22/2004 PASS
DetailsJim Storey
BLD-Aging Inspection4/20/20044/20/20044/20/2004 PASS
DetailsJim Storey
wip 4/20/2004 7:43:36 AM
Plan resubmittals received  2/24/2004 DONE
Received three requested changes to the Bown shell and core projects. Routed to Mike P. kmm
(F) Reprint permit  1/16/2004  
Issue PAID IN FULL permit  1/15/2004 DONE
Plan assigned to (M_P)12/8/2003 1/14/2004 PASS
DetailsMike Phillips
1/14/2004 10:48:28 M_P - activity updated through activity BLDA022 from case BLD03-02291.
PLANS/APPL TAKEN TO FRONT DESK  1/14/2004 DONE
Print Pending Permit.LaserJet4  1/14/2004 DONE
Inspection Record Card- Bld  1/14/2004 DONE
Permit Ready to Issue  1/14/2004 DONE
Telephone call  1/14/2004 DONE
spoke with Marv --- permit is ready.
Routing - PLAN CHECK11/26/2003 1/14/2004 PASS
Plan resubmittals received  1/9/2004 DONE
Redeived four copies of reivsed sheets m1.03 to share between bld03-02288. Both on block 3 buildings E and F. Routed to Mike P.
Plan resubmittals received  12/24/2003 DONE
2 copies of sheets C3, a2.13, a5.00 and a5.11 received and forwarded to Mike Phillips.
Plan assigned to (M_P)9/22/2003 12/8/2003 PASS
DetailsMike Phillips
12/8/2003 11:52:32 MYS - activity updated through activity BLDA022 from case BLD03-02916.
Plan resubmittals received  11/26/2003 DONE
Received transmittal to Sam Rogers, response letter to Sam, 3 page fax transmittal, Transmittal letter to Mike P. response letter to Mike, transmittal to Marty S. two supplemental structural calculations, two sets of sheets A1.11,A2.13,A2.43,A2.46,A3.13,A4.13,A5.00,A5.11,A6.13,C3,M1.03,M1.03,E2.31,S1.11,S2.13,S3.13,S4.11,S5.11,S5.12,S6.13,S7.11, taken to Mike P.
Routing - PLANNING Land Div11/26/2003 11/26/2003 PASS
Riverwalk Subdivision No. 1 recorded 11-25-03. Lot 3 of Block 1.
Routing - PUBLIC WORKS11/21/2003 11/24/2003 PASS
Routing - PLANNING11/24/2003 11/24/2003 PASS
Approve per DRH03-34.
Routing - FIRE11/17/2003 11/20/2003 PASS
Review faxed to architect
Routing - PLAN CHECK10/2/2003 11/18/2003 DONE
PLan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing Off Site -Energy9/22/2003 10/27/2003 FAIL
Contacted Ron O for energy review. kmm
Additional information required.
Routing - PLUMBING9/30/2003 10/2/2003 PASS
per plans and 2000 upc
Routing - PLANNING9/30/2003 9/30/2003 FAIL
Landscape plan does not comply with Design Review DRH03-34.
Routing - Erosion and Sediment9/24/2003 9/30/2003 PASS
ESC approved with conditions attached to plans.
Plan resubmittals received  9/26/2003 DONE
Received transmittal sheet with Erosion & sediment control design report. taken to Mike P.
Routing - PUBLIC WORKS9/24/2003 9/24/2003 FAIL
Requires Geotech report per Brian M. and sanitary sewer is considered public and needs to be reviewed and approved separately by public works per John Johnson.
Routing - PLANNING Land Div9/22/2003 9/23/2003 FAIL
Prior to issuance of building permit, final plat of Riverwalk Subdivision must be recorded.
Plans ACCEPTED BY PLAN TECH  9/22/2003 DONE
Plan routing begun/NEW & ADDTN  9/22/2003 DONE
Application received  9/19/2003  
Recd Pcfee & Taken To Pln CK  9/19/2003  
Fee Review-notes9/19/20039/19/2003