First Notice | | 9/19/2005 | 9/19/2005 | | DONE |
|
|
|
|
Second Notice | | 9/19/2005 | 9/19/2005 | | DONE |
|
|
|
|
Third Notice | | 9/19/2005 | 9/19/2005 | | DONE |
|
|
|
|
BLD-Final | 6/22/2005 | 6/23/2005 | 6/24/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 5:10:19 PM. Contact: ###-####.
|
DOC - Permit Finaled | 6/24/2005 | 6/24/2005 | 6/24/2005 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 6/22/2005 | 6/23/2005 | 6/23/2005 | P | PASS |
Forrest France
|
|
|
Core and shell fire safety passed inspection.
|
Code Occupancy Approval | 6/22/2005 | 6/22/2005 | 6/22/2005 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met.
|
Code Occupancy Approval | 6/22/2005 | 6/22/2005 | 6/22/2005 | A | CANC |
Wm. Michael Meloy
|
|
|
|
FIRE-Final Inspection | 6/20/2005 | 6/21/2005 | 6/21/2005 | P | CANC |
Forrest France
|
|
|
Cancel inspection per Burl with AIC, not ready for inspection, waiting on phone lines and smoke detector install.
|
BLD-Aging Inspection | 6/14/2005 | 6/14/2005 | 6/14/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 4/1/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 1:52:06 PM. Contact: ###-####. STAIRS OK
|
BLD-Other | 3/15/2005 | 3/15/2005 | 3/15/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/15/2005 at 10:23:34 AM. Contact: ###-####.first floor fire stopping at 2hr wall joint ok to first floor ceilling.
|
BLD-Conference | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Jim Storey
|
|
|
KENT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Jim Storey
|
|
|
KENT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Concrete | 2/17/2005 | 2/17/2005 | 2/17/2005 | P | PASS |
Jim Storey
|
|
|
2nd floor deck ok for placment of concrete.
|
BLD-Conference | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Jim Storey
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ec reports resubmitted ok and roof insulation spec approved for r-25/pending special insp. engineers responce to weld vs bolt up. 2/10/2005 9:16:33 AM
|
BLD-Aging Inspection | 10/1/2004 | 10/1/2004 | 10/1/2004 | | PASS |
Jim Storey
|
|
|
wip 10/4/2004 9:42:18 AM
|
BLD-Aging Inspection | 6/8/2004 | 6/8/2004 | 6/8/2004 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 4/6/2004 | 4/6/2004 | 4/6/2004 | | PASS |
Jim Storey
|
|
|
wip 4/6/2004 11:28:24 AM
|
Plan resubmittals received | | | 2/24/2004 | | DONE |
|
|
|
Received three requested changes to the Bown shell and core projects. Routed to Mike P. kmm
|
BLD-Foundation | 1/21/2004 | 1/22/2004 | 1/22/2004 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/21/2004 at 4:27:39 PM. Contact: ###-####. wip. 1/22/2004 10:45:16 AM
|
(F) Reprint permit | | | 1/20/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/16/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/16/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/16/2004 | | DONE |
|
|
|
left a message with Marv Meyer -- permit is ready.
|
Issue PAID IN FULL permit | | | 1/16/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/1/2003 | | 1/15/2004 | | PASS |
|
|
|
Routed to Marlene. kmm
|
Plan assigned to (M_P) | 12/8/2003 | | 1/15/2004 | | PASS |
Mike Phillips
|
|
|
1/15/2004 15:02:01 M_P - activity updated through activity BLDA022 from case BLD03-02329.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/15/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/15/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/9/2004 | | DONE |
|
|
|
Received four copies of revised sheets m1.04, m4.04. Going to share with bld03-02330. Routed to Mike P. kmm
|
Plan resubmittals received | | | 1/2/2004 | | DONE |
|
|
|
Received response letter with two copies supplemental structural calculations, two sets of sheets of A1.11,A2.14,A2.46,A4.14,A5.00,A5.11,A6.14,C4,S1.11,S2.14,S3.14,S4.11,S5.11,S5.12,S6.14,S7.11,M1.04,E2.41I, taken to Mike P.
|
Plan assigned to (M_P) | 9/25/2003 | | 12/8/2003 | | PASS |
Mike Phillips
|
|
|
12/8/2003 11:54:08 MYS - activity updated through activity BLDA022 from case BLD03-02917.
|
Routing - PUBLIC WORKS | 11/26/2003 | | 12/1/2003 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/1/2003 | | 12/1/2003 | | PASS |
|
|
|
Riverwalk Subdivision No. 1 recorded 11-25-03. Lot 8 of Block 1.
|
Routing - FIRE | 11/20/2003 | | 11/25/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/16/2003 | | 11/20/2003 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requsesting additional information be submitted for further review prior to issuing permit.
|
Routing Off Site -Energy | 9/25/2003 | | 10/27/2003 | | FAIL |
|
|
|
Contacted Ron O for energy review.
|
Routing - PLUMBING | 10/14/2003 | | 10/15/2003 | | PASS |
|
|
|
use grease interceptor drawing attached
|
Routing - PLANNING | 10/13/2003 | | 10/14/2003 | | PASS |
|
|
|
Approved per DRH03-34.
|
Routing - Erosion and Sediment | 10/10/2003 | | 10/13/2003 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Routing - PUBLIC WORKS | 9/26/2003 | | 10/10/2003 | | FAIL |
|
|
|
Requires drainage plan revision per Brian M. kmm
|
Plan resubmittals received | | | 9/26/2003 | | DONE |
|
|
|
Received transmittal sheet with Erosion & sediment control design report. taken to Mike P.
|
Plan resubmittals received | | | 9/26/2003 | | DONE |
|
|
|
Received transmittal sheet with Erosion & sediment control design report. taken to Mike P.
|
Routing - PLANNING Land Div | 9/25/2003 | | 9/26/2003 | | FAIL |
|
|
|
Do not issue building permit until final plat of Riverwalk Subdivision is recorded.
|
Plan routing begun/NEW & ADDTN | | | 9/25/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2003 | | DONE |
|
|
|
|
Application received | | | 9/24/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/24/2003 | | |
|
|
|
|
Fee Review-notes | 9/24/2003 | 9/24/2003 | | | |
|
|
|
|