Permit Information
Permit NumberBLD03-02330
StatusFinaled
Name BOWN CROSSING MARKET PLACE BLDG H
Site Address 3111 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(Bown Crossing Market Place-Bldg H) To construct a new 6,557 sq.ft. two story, multi-tenant shell building. The first floor is 3,457 sq.ft and the second floor is 3,100 sq.ft. NOTE: Fire sprinklers installed for story increase, an A-2 Occupancy on the second floor and code reduction. Separate permits, plans and Certificate of Occupancies must be obtained and approved for each tenant space to be occupied. Alll construction per the approved plans and attached comment list. The installation of two roof top heating units are being installed for freeze protection. (PLAN MODIFICATION APRIL 2, 2004) To install an elevator in this building, provide an accessible route to the second floor and provide an accessible entrance to the elevator from each separate tenant spaces within this building. Add a new door to the existing center stair enclosure and make all door in this stair enclosure meet opening protection ratings per IBC Table 714.2. MJP PC#590-03 DRH03-00034
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/19/20059/19/2005 DONE
Second Notice 9/19/20059/19/2005 DONE
Third Notice 9/19/20059/19/2005 DONE
Letter of compliance  1/28/2005 DONE
Letter of Compliance issued 1-28-05.
BLD-Final1/26/20051/26/20051/26/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/26/2005 at 9:38:55 AM. Contact: ###-####.
Code Occupancy Approval  1/25/2005 PASS
Compliance met.
Code Occupancy Approval12/6/200412/7/200412/7/2004AFAIL
DetailsWm. Michael Meloy
Compliance not met, no landscaping and outside stairs and balconies. 12/9/2004 10:45:37 AM
Code Occupancy Approval12/6/200412/7/200412/7/2004ACANC
DetailsWm. Michael Meloy
BLD-Aging Inspection10/5/200410/5/200410/5/2004 PASS
DetailsJim Storey
wip 10/5/2004 8:29:05 AM
BLD-Aging Inspection6/8/20046/8/20046/8/2004 PASS
DetailsJim Storey
Telephone call  5/28/2004  
spoke with Marv Meyer -- permit is ready.
Plan assigned to (M_P)3/16/2004 4/22/2004 PASS
DetailsMike Phillips
4/22/2004 09:35:36 M_P - activity updated through activity BLDA022 from case BLD03-02330.
Routing - PLAN CHECK4/21/2004 4/22/2004 NR
PLAN MODIFICATION
PLANS/APPL TAKEN TO FRONT DESK  4/22/2004 DONE
Override - Parcel Holds  4/22/2004  
Override - Parcel Holds  4/22/2004  
Inspection Record Card- Bld  4/22/2004 DONE
Override - Parcel Holds  4/22/2004  
Permit Ready to Issue  4/22/2004 DONE
Telephone call  4/22/2004 DONE
permit ready and fee due (plan modification)
Routing - FIRE4/16/2004 4/21/2004 PASS
PLAN MODIFICATION * Review resubmitted plans for permit issuance.
Routing - PLAN CHECK4/5/2004 4/16/2004 PEND
Plan Modification.
Waiting for others to approve prior to issuing permit.
Plan resubmittals received  4/12/2004 DONE
Received a transmittal letter, response letter and two sets of sheets A2.14,A4.21,A6.14,E1.4,E2.4F taken to Mike P.
Routing - FIRE4/2/2004 4/5/2004 FAIL
DetailsBill Alexander
PLAN MODIFICATION * Problem with egress issues.
Routing - PLAN CHECK3/30/2004 4/2/2004 FAIL
PLAN MODIFICATION * Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit for modification.
Routing - PLANNING3/22/2004 3/29/2004 PASS
Plan Modification Approved.
Plan assigned to (M_P)3/17/2004 3/22/2004  
DetailsMike Phillips
PLAN MODIFICATION * Routing to Planning for review.
Plan Modification Accepted  3/17/2004 DONE
Received three sets of sheets a2.14,a2.44,a3.14,a4.14,a14.21,s1.11,s2.14,s3.14,s4.11,s5.11,s5.12,s6.14,s7.11,m2.04,m4.04me1.4,s2.4f,e2.4l,e2.4p to add a elevator, routed to Mike P.
BLD-Foundation2/25/20042/25/20042/25/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 2/25/2004 at 7:40:30 AM. Contact: ###-####.
Plan resubmittals received  2/24/2004 DONE
Received three requested changes to the Bown shell and core projects. Routed to Mike P. kmm
BLD-Footing2/18/20042/18/20042/18/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/18/2004 at 9:17:47 AM. Contact: ###-####. rebar in progess/ pending special insp. report. 2/18/2004 3:50:31 PM
BLD-Conference2/18/20042/18/20042/18/2004PPASS
DetailsJim Storey
aproved revision of mec-check to cmu wall insulation on file on site for revised report.
(F) Reprint permit  1/26/2004  
Issue PAID IN FULL permit  1/23/2004 DONE
Inspection Record Card- Bld  1/20/2004 DONE
CHANGE STATUS TO (R)  1/20/2004 DONE
Telephone call  1/20/2004  
CALL ED MARVEN PERMIT READY & FEE GIVEN 1-20-04 9:20 AM ///DLD
Routing - PLAN CHECK12/1/2003 1/16/2004 PASS
Routed to Marlene. kmm
Plan assigned to (M_P)12/8/2003 1/16/2004 PASS
DetailsMike Phillips
1/16/2004 15:33:44 M_P - activity updated through activity BLDA022 from case BLD03-02330.
PLANS/APPL TAKEN TO FRONT DESK  1/16/2004 DONE
Plan resubmittals received  1/9/2004 DONE
Received four copies of revised sheets m1.04 and m4.04. To be shared with bld03-02329. Routed to Mike P. kmm
Plan resubmittals received  1/2/2004 DONE
Received two copies of revised sheets a1.11, a2.14, a2.46, a4.14, a5.00, a6.14, C4, s1.11, s2.14, s3.14, s4.11, s5.11, s5.12, s6.14, s7.11, m1.04 and e2.41one copy of response letter and two copies of supplemental calcs. Routed to Mike P. kmm
Plan assigned to (M_P)9/25/20039/25/200312/8/2003 PASS
DetailsMike Phillips
12/8/2003 11:54:35 MYS - activity updated through activity BLDA022 from case BLD03-02918.
Routing - PUBLIC WORKS11/26/2003 12/1/2003 PASS
Routing - PLANNING Land Div12/1/2003 12/1/2003 PASS
Riverwalk Subdivision No. 1 recorded 11-25-03. Lot 7 of Block 1.
Plan resubmittals received  11/26/2003 DONE
Plan resubmittals received  11/26/2003 DONE
received letter of transmittal to Brian M. with three copies of C4 taken to Mike P.
Routing - FIRE11/25/2003 11/25/2003 PASS
Routing - PLAN CHECK10/16/2003 11/25/2003 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing Off Site -Energy9/25/2003 10/27/2003 FAIL
contacted Ron for Energy.
Additional information required.
Routing - PLUMBING10/14/2003 10/15/2003 PASS
use grease interceptor drawing attached
Routing - PLANNING10/13/2003 10/14/2003 PASS
Approved per DRH03-34.
Routing - Erosion and Sediment10/9/2003 10/13/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS9/26/2003 10/9/2003 FAIL
Requires drainage plan revision.
Plan resubmittals received  9/26/2003 DONE
Received transmittal sheet with Erosion & sediment control design report. taken to Mike P.
Routing - PLANNING Land Div9/25/2003 9/26/2003 FAIL
Do not issue building permit until final plat of Riverwalk Subdivision is recorded.
Plan routing begun/NEW & ADDTN  9/25/2003  
Plans ACCEPTED BY PLAN TECH  9/25/2003 PASS
Application received  9/24/2003