Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-02345
StatusFinaled
Name AMYX SIGNATURE HOMES
Site Address 4080 N FARLIGHT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2706 sq. ft. two story single family dwelling with a 904 sq. ft. attached three car garage, a 305 sq. ft. covered entry porch and a 227 sq. ft. covered concrete patio at rear of structure per approved plans and attached requirement lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City.(1st floor 1645 sq. ft.)(2nd floor 1061 sq. ft.) PC #593 SOLAR PROTECTED DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20044/12/20044/12/2004APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/9/2004 at 9:31:39 AM. Contact: ###-####.
DOC - Permit Finaled4/11/20044/11/20044/11/2004PPASS
DetailsRuss Owen
Finaled by inspector at 4/11/2004 5:52:41 PM
BLD-Final4/7/20044/8/20044/8/2004ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/7/2004 at 12:38:46 PM. Contact: ###-####. Notified Contr....Need F/P final. 4/8/2004 11:41:32 AM
BLD-Energy code compliance1/26/20041/27/20041/27/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 1/26/2004 at 12:47:02 PM. Contact: ###-####.
BLD-Framing/Rough-in1/22/20041/23/20041/23/2004AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 1/22/2004 at 8:53:44 AM. Contact: ###-####. C/N 1/23/2004 12:39:45 PM
BLD-Foundation10/14/200310/15/200310/15/2003APASS
DetailsJim Sly
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing10/13/200310/14/200310/14/2003APASS
DetailsJim Sly
dave ###-####
BLD-Footing10/13/200310/13/200310/13/2003PCANC
DetailsJim Sly
STEVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Issue PAID IN FULL permit  10/6/2003  
Plan assigned to (DJO)10/2/200310/2/200310/2/2003 PASS
DetailsDan Overy
10/2/2003 09:58:23 DJO - activity updated through activity BLDA022 from case BLD03-02345.
Case Summary (BLD)  10/2/2003  
Plan Review Report  10/2/2003  
PLANS/APPL TAKEN TO FRONT DESK  10/2/2003 DONE
Inspection Record Card- Bld  10/2/2003 DONE
Permit Ready to Issue  10/2/2003 DONE
Telephone call  10/2/2003 DONE
Spoke with Todd and told permit is ready & fees
Plans ACCEPTED BY PLAN CHECK  10/2/2003  
Application received  9/26/2003  
Routing - PLANNING9/26/2003 9/26/2003 PASS
Routing - PUBLIC WORKS9/26/2003 9/26/2003 PASS
Pending Assignment by DJO9/26/2003    
DetailsDan Overy
Routing - PLAN CHECK9/26/2003