Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02347
StatusFinaled
Name GEM STATE BUILDERS
Site Address 999 W MAIN ST (8TH FLR)
Project NameONE CAPITAL CNTR-8TH FLR
Customer Number 
ePlanReviewNo
Description
(QWEST - ONE CAPITAL CENTER - 8TH FLR) This building is fire sprinklered because it is a high-rise. To remodel a 7,279 square foot area within an existing whole floor (17,050 square foot) office tenant. A demolition permit (BLD03-02473) was issued earlier. A portion of the existing 2-hr fire barrier that functions as a horizontal exit is being modified. Work is to include interior nonbearing walls, suspended ceilings, interior doors, and interior finishes all per the approved drawings and plan reveiw report on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/23/20084/23/20084/24/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 2/13/20084/23/2008 DONE
Permanent Occupancy  2/13/2008 DONE
BLD-Final2/1/20082/1/20082/1/2008PPASS
DetailsDave Hannah
coby Phone #: ###-#### ok for perm occ
BLD-Final1/25/20081/25/20081/26/2008PFAIL
DetailsDave Hannah
Jermey Malone, ###-#### ext 2hr fire wall for horz exit not to code and exit signs missing
BLD-Final1/24/20081/25/20081/25/2008ADEFR
DetailsDave Hannah
Jermey Malone, ###-#### rescheduled to pm
BLD-Final1/23/20081/24/20081/24/2008PCANC
DetailsMike Jordan
Jeremy Malone, Please call first ###-####
FIRE-Final Inspection1/23/20081/23/20081/23/2008PPASS
DetailsForrest France
Noted one additional fire extinguisher to be posted as discussed due to excessive travel distances, provide approved door hardware or remove door at the SE call center area, items to be completed prior to structural final for verification at that time. Fire life safety for the permit scope area is acceptable pending completion of these two items.
BLD-Aging Inspection1/18/20081/18/20081/23/2008PDONE
DetailsForrest France
Site inspection scheduled.
BLD-Aging Inspection1/15/20081/15/20081/18/2008PDEFR
DetailsForrest France
Inspection scheduled.
BLD-Aging Inspection1/15/20081/15/20081/18/2008 DEFR
DetailsDave Hannah
needs fire sign offs sent to fire
BLD-Aging Inspection11/7/200711/7/200711/7/2007 DEFR
DetailsDave Hannah
BLD-Aging Inspection8/16/20078/16/20078/20/2007 DEFR
DetailsDave Hannah
BLD-Aging Inspection8/28/20068/28/20068/29/2006 DEFR
DetailsDave Hannah
waiting for fire final
BLD-Aging Inspection6/23/20066/23/20066/26/2006 DONE
DetailsForrest France
Project final pending fire alarm work c/n issued to NWFS.
BLD-Aging Inspection4/17/20064/17/20064/17/2006 DONE
DetailsForrest France
Pending completion of project related alarm permit c/n.
BLD-Aging Inspection1/19/20061/19/20061/20/2006 DEFR
DetailsForrest France
sent to fire
BLD-Aging Inspection11/15/200511/15/200511/16/2005 FAIL
DetailsDave Hannah
waiting for fir to sign off perm
BLD-Aging Inspection8/5/20058/5/20058/8/2005 DONE
DetailsForrest France
Pending completion and inspection of fire alarm work under permit FIR05-00048 with NW sales company per upgrade agreement.
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
Case Summary (BLD)  7/27/2004 DONE
Case Summary (BLD)  7/27/2004 DONE
BLD-Final12/22/200312/22/200312/22/2003PFAIL
DetailsDave Hannah
Joe; Phone #: ###-#### they quit at 3:30 for the day, thanks.Internet Inspection Request from: Aimee Hughes needs fire life safty sign offs 12/22/2003 2:15:22 PM
BLD-Framing/Rough-in11/14/200311/17/200311/17/2003PPART
DetailsDave Hannah
Joe --- drop in ceiling --- before 3:00 please; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to drop in pannels 11/17/2003 2:35:13 PM
FIRE-Conference11/14/200311/14/200311/14/2003ADONE
DetailsRick Jackson
Talked to Sam Rogers about the requirements for horn/strobes on this floor and relayed to Jeremy Malone about the need to submit plans for this floor or obtain waiver from Dave MIller/Sam Rogers 11/14/2003 10:49:02 AM
BLD-Framing/Rough-in11/7/200311/10/200311/10/2003APART
DetailsJim Storey
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore screww sch. ok on walls. 11/10/2003 12:55:25 PM
BLD-Framing/Rough-in10/31/200310/31/200310/31/2003PPASS
DetailsDave Hannah
dick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to start covering walls 10/31/2003 3:34:09 PM
Inspection Record Card- Bld  10/28/2003 DONE
Print Occupancy Form  10/28/2003 DONE
Permit Ready to Issue  10/28/2003 DONE
Telephone call  10/28/2003 DONE
Spoke with Evelyn told permit is ready & fees
Issue PAID IN FULL permit  10/28/2003 DONE
Routing - PLAN CHECK10/16/2003 10/27/2003 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  10/27/2003 DONE
Received two copies of revised sheet E2.0 and one copy of A2.1. One copy of response letter and one letter about elevatore modernization. Routed to Carl W. kmm
PLANS/APPL TAKEN TO FRONT DESK  10/27/2003 DONE
Plan assigned to (CJW)9/29/2003 10/27/2003 PASS
DetailsCarl Westfall
10/27/2003 14:34:28 CJW - activity updated through activity BLDA022 from case BLD03-02347.
Routing - FIRE10/10/2003 10/15/2003 PASS
Routing - PLAN CHECK10/1/2003 10/10/2003  
Failed first IBC plan review. IBC plan review started October 9, 2003 and finished the next day. A response from the architect was required. See the plan review report.
Routing - PUBLIC WORKS9/29/2003 10/1/2003 PASS
Plans ACCEPTED BY PLAN TECH  9/29/2003 DONE
Per Carl
Plan resubmittals received  9/29/2003 DONE
Received transmittal letter with one set of sheets A1.0,A2.0,A3.0,M1.0,M2.0,E1.0,E1.1,E2.0,E2.1 taken to Carl W
Application received  9/26/2003  
Recd Pcfee & Taken To Pln CK  9/26/2003 DONE
Extend Permit 180 days8/20/20078/20/2007 P 
DetailsForrest France
Fee Review-notes9/26/20039/26/2003