Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/7/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 10/7/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10320 issued 10-7-04 to Thai Cuisine.
|
Permanent Occupancy | | 10/5/2004 | 10/5/2004 | | DONE |
|
|
|
|
BLD-Final | 10/5/2004 | 10/5/2004 | 10/5/2004 | P | PASS |
Lane Manuel
|
|
|
###-#### bill graham
c of o ok 10/5/2004 4:21:24 PM
|
Override - Condition Holds | | | 10/5/2004 | | |
|
|
|
|
Override - Condition Holds | | | 10/5/2004 | | |
|
|
|
|
BLD-Final | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | PART |
Lane Manuel
|
|
|
bill ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
temp. c of o ok.
c/n given for egress issue, and lighting 9/17/2004 9:10:50 AM
|
Code Occupancy Approval | | | 9/17/2004 | | PASS |
|
|
|
FINAL SIGNED OFF.
|
BLD-Final | | 9/16/2004 | 9/16/2004 | A | FAIL |
Lane Manuel
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Charb ###-####
need new Architect of record to address ADA issues @ mens restroom, and egress. 9/16/2004 9:18:59 AM
|
FIRE-Final Inspection | 9/15/2004 | 9/16/2004 | 9/16/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 9/16/2004 9:02:06 AM
|
FIRE-Final Inspection | 9/14/2004 | 9/15/2004 | 9/15/2004 | A | FAIL |
Troy Cobbley
|
|
|
charb ###-#### Remove the key locking hardware from the inner doors at the main entry/exit. See fire review note #11. Repair the exit sign in the corridor and provide a emergency light in the kitchen area as per approved plans. Provide exit discharge lighting per building review note #17. Provide occupant load sign per review note #15. Remove dead bolts from the rear exit door. Manual flush bolts not allowed. Return air and makeup air for the type 1 hood should be approximately the same per IMC 508.1 right now there is a 900 cfm in the negative. 9/15/2004 11:34:26 AM
|
BLD-Final | 9/14/2004 | 9/15/2004 | 9/15/2004 | P | NR |
Lane Manuel
|
|
|
charb ###-####
|
BLD-Conference | 9/14/2004 | 9/14/2004 | 9/14/2004 | P | CANC |
Lane Manuel
|
|
|
met w/ owner and contr. to discuss issues prior to issuance of c of o.
noted a few correction issues
|
Override - Condition Holds | | | 9/14/2004 | | |
|
|
|
|
BLD - Request for Extension | 8/16/2004 | 8/16/2004 | 8/16/2004 | | PART |
Lane Manuel
|
|
|
###-#### robin ###-####
gave extension for project. 8/16/2004 12:50:55 PM
|
BLD-Conference | 6/4/2004 | 6/4/2004 | 6/4/2004 | A | PASS |
Dixie Fellows
|
|
|
per your request discussed stop work and reasons why with travis..no mech permit for hood per bob kimbrough...also need stamped engineered plans for hood exhaust, etc 6/4/2004 11:23:04 AM
|
Override - Condition Holds | | | 6/4/2004 | | |
|
|
|
|
BLD-Framing/Rough-in | 1/5/2004 | 1/6/2004 | 1/6/2004 | A | CANC |
Russ Owen
|
|
|
Travis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Print Occupancy Form | | | 11/18/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/18/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2003 | | DONE |
|
|
|
spoke with Ron Thurber -- permit is ready.
|
Issue PAID IN FULL permit | | | 11/18/2003 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 9/29/2003 | | 11/17/2003 | | PASS |
Dan Stuart
|
|
|
11/17/2003 14:21:27 DRS - activity updated through activity BLDA022 from case BLD03-02350.
|
Routing - PLAN CHECK | 11/4/2003 | | 11/17/2003 | | PASS |
|
|
|
Received resubmittals late Friday afternoon, 11/14/03. Inserted into plans and reviewed for response correctness. Added red-line notes for code clarfication and routed to permit desk to prepare to issue building permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2003 | | PASS |
|
|
|
To permit desk to issue.
|
Routing - PLANNING | 11/17/2003 | | 11/17/2003 | | PASS |
|
|
|
Plans hand carried to Sarah Shafer for signature.
|
Plan resubmittals received | | | 11/14/2003 | | DONE |
|
|
|
Received a response letter with two sets of sheets C-1,A-1,A-2,E-1,M-1,M-2,P-1 taken to Dan S.
|
Routing - FIRE | 10/28/2003 | | 11/3/2003 | | PASS |
|
|
|
Approved with Conditions.
|
Routing - PLAN CHECK | 10/2/2003 | | 10/28/2003 | | FAIL |
|
|
|
Copy of review comment mailed to architects office and e-mailed copy to his home. His office phone's not working.Routing to fire code analyst
|
Plan resubmittals requested | | | 10/28/2003 | | FAIL |
|
|
|
Mailed copy of plan review to architects office and e-mail copy to his home using address his wife provided? rthurber@earthlink.com
|
Routing Off Site -Energy | 9/30/2003 | | 10/21/2003 | | PASS |
|
|
|
Contacted Ron O for energy review. kmm
|
Routing Off Site -Energy | 10/21/2003 | | 10/21/2003 | | PASS |
|
|
|
Approved as submitted.
|
Routing Off Site -Energy | 10/7/2003 | | 10/13/2003 | | FAIL |
|
|
|
Contacted Ron O. for re-review
|
Plan resubmittals received | | | 10/9/2003 | | DONE |
|
|
|
5 sets of M-2 sheets taken to Dan S.
|
Routing - PLANNING | 10/2/2003 | | 10/2/2003 | | FAIL |
|
|
|
Needs a valid Zoning Certificate. I have contacted Ron Thurber and he will be sending me the information asap.
|
Routing - PLUMBING | 10/2/2003 | | 10/2/2003 | | PASS |
|
|
|
bldg may require backflow protection and expansion protection
|
Routing - PUBLIC WORKS | 9/29/2003 | | 10/1/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/29/2003 | | PEND |
|
|
|
No energy compliance....
|
Application received | | | 9/26/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/26/2003 | | |
|
|
|
|
Fee Review-notes | 9/26/2003 | 9/26/2003 | | | |
|
|
|
|