BLD-Final | 5/28/2004 | 6/1/2004 | 6/1/2004 | A | PASS |
Troy James
|
|
|
bryan please call for access; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
DOC - Permit Finaled | 6/1/2004 | 6/1/2004 | 6/1/2004 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 6/1/2004 12:08:46 PM
|
BLD-Energy code compliance | 4/20/2004 | 4/21/2004 | 4/21/2004 | A | PASS |
Dave Hannah
|
|
|
BRIAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover 4/21/2004 9:12:12 AM
|
BLD-Framing/Rough-in | 4/19/2004 | 4/19/2004 | 4/19/2004 | P | PASS |
Dave Hannah
|
|
|
BRIAN; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Energy code compliance | 4/19/2004 | 4/19/2004 | 4/19/2004 | P | NR |
Dave Hannah
|
|
|
BRIAN; Phone #: ###-#### Internet Inspection Request from: Annette Moore crew still working on installing insulation 4/19/2004 1:53:01 PM
|
BLD-Framing/Rough-in | 4/15/2004 | 4/15/2004 | 4/15/2004 | P | FAIL |
Dave Hannah
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Darla Downs c/n on site ok to insulate 4/15/2004 2:45:46 PM
|
BLD-Foundation | 12/18/2003 | 12/18/2003 | 12/18/2003 | P | PART |
Steven Webb
|
|
|
Donny; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes; Rebar per plan--No holdowns in place at time of inspection. WIP. 12/18/2003 4:11:10 PM
|
BLD-Footing | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 12/11/2003 | 12/12/2003 | 12/12/2003 | A | FAIL |
Dave Hannah
|
|
|
Donny; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs terrys recoreds sign off crew still working on rebar no inspection done 12/12/2003 11:39:43 AM
|
Override - Parcel Holds | | | 12/5/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/28/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/28/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/28/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/28/2003 | | |
|
|
|
|
Permit Ready to Issue | | | 11/28/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/28/2003 | | DONE |
|
|
|
Spoke with David and told him permit is ready & fees
|
Plan assigned to (DJO) | 11/26/2003 | 11/26/2003 | 11/26/2003 | | PASS |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | 11/26/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 11/26/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 11/26/2003 | | |
|
|
|
|
Pending Assignment by DJO | 10/1/2003 | | 11/26/2003 | | DONE |
Dan Overy
|
|
|
11/26/2003 13:42:32 DJO - activity updated through activity BLDA169 from case BLD03-02377.
|
Routing - PLAN CHECK | 11/20/2003 | | 11/26/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/26/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2003 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/18/2003 | | 11/20/2003 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 11/20/2003 | | 11/20/2003 | | PASS |
|
|
|
No fire sprinklers required (Northridge #5)
|
Routing - PLANNING | 11/4/2003 | | 11/18/2003 | | PASS |
|
|
|
Plans were on hold until CFH03-26 was approved. Plans have been reviewed and approved.
|
Routing - PUBLIC WORKS | 11/4/2003 | | 11/4/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/4/2003 | | 11/4/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1or 2.
|
Routing - PUBLIC WORKS GRADING | 10/1/2003 | | 10/7/2003 | | FAIL |
Rita DeYoung
|
|
|
Grading in rear requires a Category 1 or 2 application. Attempting to get in contact with the applicant.
|
Application received | | | 10/1/2003 | | |
|
|
|
|
BLD-Grading Inspection | 12/12/2003 | 12/12/2003 | | | |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer
|