Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/5/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/5/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10230 issued 7-15-04 to Henze Chiropractic.
|
BLD-Final | 7/14/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Jim Sly
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Annette Moore OK for Perm Occ. 7/15/2004 2:15:05 PM
|
Permanent Occupancy | | 7/15/2004 | 7/15/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2004 | | DONE |
|
|
|
Talked w/Cameron re. status of temp. - should be completed within the next week or so.
|
Code Occupancy Approval | 6/18/2004 | 6/18/2004 | 6/18/2004 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED SIGNE FINAL AND RELEASE OF BOND. 6/18/2004 12:41:33 PM
|
FIRE-Final Inspection | 6/3/2004 | 6/3/2004 | 6/3/2004 | P | PASS |
Rick Jackson
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Pocket doors were removed 6/3/2004 2:44:12 PM
|
BLD-Final | 4/29/2004 | 4/30/2004 | 4/30/2004 | P | PART |
Dave Hannah
|
|
|
cameron for temp occupancy; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for temp needs other trades to sign off perm and chech door hardware on inter doors 4/30/2004 4:37:56 PM
|
FIRE-Final Inspection | 4/29/2004 | 4/30/2004 | 4/30/2004 | A | FAIL |
Troy Cobbley
|
|
|
provide review notes for plan review. Provide sticker at the main entrance/exit. provide door hardware. Provide building address. test duct smoke detectors. Provide ada hardware on the pocket doors 4/30/2004 10:06:18 AM
|
FIRE-Final Inspection | 4/30/2004 | 4/30/2004 | 4/30/2004 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission. Items to be completed are: provide remote led's for the duct detectors and retest. provide ada approved door hardware on the pocket doors and provide correct sticker at the main exit 4/30/2004 3:31:16 PM 4/30/2004 3:32:05 PM
|
Temporary occupancy | | | 4/30/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5107 issued 4-30-04 to Henze Chiropractic.
|
BLD-Energy code compliance | 3/11/2004 | 3/12/2004 | 3/12/2004 | P | PASS |
Russ Owen
|
|
|
camron; Phone #: ###-#### Internet Inspection Request from: Darla Downs Ok to sheetrock 3/12/2004 12:53:12 AM
|
BLD-Wall cover | 3/10/2004 | 3/11/2004 | 3/11/2004 | P | PASS |
Russ Owen
|
|
|
Cameron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to insulate. 3/11/2004 12:47:04 AM
|
BLD-Framing/Rough-in | 3/9/2004 | 3/10/2004 | 3/10/2004 | P | FAIL |
Russ Owen
|
|
|
Cameron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes posted a c/n. 3/10/2004 1:09:46 AM
|
BLD-Framing/Rough-in | 2/19/2004 | 2/20/2004 | 2/20/2004 | A | PART |
Russ Owen
|
|
|
re-insp-- cameron ###-#### ok to cover all exterior. 2/19/2004 7:47:12 PM
|
BLD-Framing/Rough-in | 2/18/2004 | 2/19/2004 | 2/19/2004 | A | FAIL |
Russ Owen
|
|
|
camron ( shear nail inspection ) please call before going over.; Phone #: ###-#### Internet Inspection Request from: Darla Downs. posted c/n and called contractor. 2/18/2004 9:56:45 PM
|
BLD-Foundation | 1/15/2004 | 1/16/2004 | 1/16/2004 | P | PASS |
Russ Owen
|
|
|
JACK ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 1/15/2004 | 1/15/2004 | 1/15/2004 | P | PASS |
Russ Owen
|
|
|
j & h concrete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Note: plans call for (2) #4 horiz in fnd wall. 1/15/2004 4:21:55 PM
|
(F) Reprint permit | | | 12/29/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/26/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/24/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/24/2003 | | DONE |
|
|
|
|
CHANGE STATUS TO (R) | | | 12/24/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/24/2003 | | DONE |
|
|
|
CALLED LEFT MESSAGE FOR MIKE PERMIT READY & FEE GIVEN ALSO NEED A.C.H.D. 12-24-03 ///DLD 9:15
|
Routing - FIRE | 12/18/2003 | | 12/23/2003 | | PASS |
|
|
|
resubmitted hyd flow.
|
Routing - PLAN CHECK | 12/23/2003 | | 12/23/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/3/2003 | | 12/23/2003 | | PASS |
Mike Otto
|
|
|
12/23/2003 14:42:23 MLO - activity updated through activity BLDA022 from case BLD03-02393.
|
Routing Off Site -Energy | 12/4/2003 | | 12/22/2003 | | PASS |
|
|
|
|
Routing - FIRE | 12/10/2003 | | 12/11/2003 | | FAIL |
|
|
|
Plans denied. They still need to provide water flow requirements. Notes faxed to architect.
|
Routing - PLAN CHECK | 12/11/2003 | | 12/11/2003 | | NR |
|
|
|
|
Routing - PUBLIC WORKS | 12/5/2003 | | 12/8/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 12/8/2003 | | 12/8/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLAN CHECK | 12/8/2003 | | 12/8/2003 | | NR |
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2003 | | 12/5/2003 | | FAIL |
|
|
|
Site plan to show existing sewer service and new sewer servicefor 9211 Overland. John Johnson
|
Routing - PLAN CHECK | 12/5/2003 | | 12/5/2003 | | NR |
|
|
|
|
Routing - PLAN CHECK | 11/12/2003 | | 12/5/2003 | | NR |
|
|
|
|
Routing - PLAN CHECK | 11/25/2003 | | 12/4/2003 | | PEND |
|
|
|
waiting for energy
|
Plan resubmittals received | | | 11/24/2003 | | DONE |
|
|
|
Received three sets of sheets A1.0,A2.0,A3.0,A4.0,A5.0,A6.0,A7.0,A8.0,AEN,,C1.0,E1.0,E2.0,E3.0,E4.0,E5.0,EN2.0,P0.0,P0.1,P1.0,P1.1P2.0,EN1.0,M0.0,M0.1,M1.0,M2.0,ESC-1, plans taken to Mike O.
|
Routing - FIRE | 11/4/2003 | | 11/10/2003 | | FAIL |
|
|
|
Need hydrant flow info. Review faxed to architect.
|
Routing - PLAN CHECK | 10/21/2003 | | 11/4/2003 | | FAIL |
|
|
|
corrections faxed to architect
|
Routing Off Site -Energy | 10/3/2003 | | 10/30/2003 | | FAIL |
|
|
|
Contacted Ron O for energy review. kmm. Building being redesigned energy corrections are N/A at this point. Will wait for resub and send back for review. MLO 11/4
|
Routing - PLUMBING | 10/21/2003 | | 10/21/2003 | | PASS |
|
|
|
sht P2.0 detail 1 water heater T&P drain and pan drain shall drain to floor drain in adjacent restroom
|
Routing - PLANNING | 10/16/2003 | | 10/21/2003 | | PASS |
|
|
|
Approve per DRH03-146.
|
Routing - Erosion and Sediment | 10/14/2003 | | 10/16/2003 | | FAIL |
|
|
|
No ESC permit application.
|
Routing - PUBLIC WORKS | 10/7/2003 | | 10/14/2003 | | FAIL |
|
|
|
Per John Johnson site plan to show existing sewer service and new sewer service for 9211 Overland.
|
Routing - PLANNING Land Div | 10/3/2003 | | 10/7/2003 | | PASS |
|
|
|
Approved. ROS 4254. One-time lot split of parcel created on 4/27/59.
|
Plans ACCEPTED BY PLAN TECH | | | 10/3/2003 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/3/2003 | | DONE |
|
|
|
|
Application received | | | 10/2/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/2/2003 | | |
|
|
|
|
Fee Review-notes | 10/2/2003 | 10/2/2003 | | | |
|
|
|
|