Case Summary (BLD) | | | 11/17/2009 | | DONE |
|
|
|
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/29/2004 | 4/26/2005 | | DONE |
|
|
|
|
BLD-Final | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | PASS |
Lane Manuel
|
|
|
Cathy has the card, everyone else is approved/final
ok for permanent cert. of occupancy 9/29/2004 10:58:00 AM
|
Permanent Occupancy | | 9/29/2004 | 9/29/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/29/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10313 issued 9-29-04 to Calvary Chapel Elementary School.
|
Telephone call | | | 7/20/2004 | | DONE |
|
|
|
Talked with contractor, he is sending in letter re: extension of temp. occ.
|
BLD-Final | 4/23/2004 | 4/23/2004 | 4/23/2004 | P | PART |
Russ Owen
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. Ok temp oc, need restrooms completed for a final and all other signatures on card. 4/22/2004 11:31:37 PM
|
FIRE-Final Inspection | 4/23/2004 | 4/23/2004 | 4/23/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. Curbing painting for fire dept. access will be painted when the curbing is building at next building
|
Code Occupancy Approval Temp | 4/23/2004 | 4/23/2004 | 4/23/2004 | P | DONE |
Scott M.Brown
|
|
|
SIGNED TEMP ONLY SO THEY CAN MOVE OFFICE ITEMS NEXT WEEK, WILL MKE FINAL INSPECTION NEXT WEEK 4/23/2004 2:40:05 PM
|
Temporary occupancy | | | 4/23/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5102 issued 4-23-04 to the Calvary Chapel Elementary School.
|
FIRE-Final Inspection | 4/20/2004 | 4/20/2004 | 4/20/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide ceiling tile around sprinkler pendants, Provide approved door hardware for all doors, provide building address, provide knox key box, test fire alarm system, install fire extinguishers, Provide emergency light in first floor corridor and final sprinkler system
|
BLD-Framing/Rough-in | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | FAIL |
Russ Owen
|
|
|
above grid inspection please///tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore went over araes that need wires with contractor. 4/6/2004 6:56:24 PM
|
BLD-Other | 4/6/2004 | 4/7/2004 | 4/7/2004 | P | PART |
Russ Owen
|
|
|
new grid ok , some existing grid left in place just new tiles. 4/8/2004 12:12:50 AM
|
BLD-Framing/Rough-in | 3/31/2004 | 3/31/2004 | 3/31/2004 | P | PART |
Russ Owen
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore went over grid requirements. 3/31/2004 1:15:44 AM
|
BLD-Framing/Rough-in | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | PART |
Russ Owen
|
|
|
###-#### tim
|
CHANGE STATUS TO (ISS) | | | 3/5/2004 | | DONE |
|
|
|
paid for plan modification
|
BLD-Framing/Rough-in | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PART |
Russ Owen
|
|
|
###-#### Ken Ok to start drywall, a plan mod is in the office waiting to be picked up. 3/1/2004 7:51:57 PM
|
Print Occupancy Form | | | 3/2/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/2/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 3/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/2/2004 | | DONE |
|
|
|
permit ready and fees due
|
Receive PAYMENT IN FULL PRINT | | | 3/2/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | FAIL |
Russ Owen
|
|
|
###-#### timothy, pending a plan modification, fire block stairs contractor on site notified. 3/1/2004 1:06:24 AM
|
Routing - PLUMBING | 3/1/2004 | | 3/1/2004 | | PASS |
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 2/19/2004 | | 3/1/2004 | | DONE |
|
|
|
Plan modification completed. Carl J. Westfall with the Plan Review Division reviewed and approved. Sam Rogers with the Fire Department, Louise Waldorf with Public Works, Tempra Wilson with Planning/Zoning Division reviewed and approved.
|
Override - Parcel Holds | | | 3/1/2004 | | |
|
|
|
|
Plan assigned to (CJW) | 2/19/2004 | | 3/1/2004 | | PASS |
Carl Westfall
|
|
|
3/1/2004 13:10:48 CJW - activity updated through activity BLDA022 from case BLD03-02402.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/1/2004 | | |
|
|
|
|
Plan routing begun/TENANTS | | | 2/19/2004 | | DONE |
|
|
|
Plan modification
|
Plan Modification Accepted | | | 2/19/2004 | | DONE |
|
|
|
Plan modification * Sinks & sink cabinets in classrooms
Relocated water heater.
New roof hatch & ladder
Permanent partition between rooms 107A & 107B
Elimination of door 107b
Storage room modifications to accomodate sinks.
|
BLD-Footing | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PASS |
Russ Owen
|
|
|
kim ###-#### . Ok slab for new stairs. 2/11/2004 6:51:01 PM
|
BLD-Conference | 2/4/2004 | 2/5/2004 | 2/5/2004 | P | DONE |
Russ Owen
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughesdid this yesterday 2/5/2004 3:54:04 PM
|
BLD-Conference | 2/4/2004 | 2/4/2004 | 2/4/2004 | P | PART |
Russ Owen
|
|
|
went over some restroom areas and ext wall doorway. 2/4/2004 5:30:43 PM 2/4/2004 5:31:07 PM
|
BLD-Conference | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | CANC |
Troy James
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Contractor to reschedule with Russ. 2/2/2004 2:13:57 PM
|
Issue PAID IN FULL permit | | | 1/14/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/25/2003 | | 1/13/2004 | | PASS |
|
|
|
Permit cleared for issuance. A temporary Certificate of Occupancy was issued to the "Sanctuary Building" on January 12, 2004.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/13/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/13/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/13/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/6/2003 | | 1/13/2004 | | PASS |
Carl Westfall
|
|
|
1/13/2004 10:48:06 CJW - activity updated through activity BLDA022 from case BLD03-02402.
|
Routing - FIRE | 11/20/2003 | | 11/25/2003 | | PASS |
|
|
|
resubmittal acceptable
|
Routing - PLAN CHECK | 11/18/2003 | | 11/20/2003 | | |
|
|
|
The resubmitted drawings were reviewed and approved. A valid Certificate of Occupancy for the "Sanctuary Building" is yet to be issued.
|
Routing - PUBLIC WORKS | 11/14/2003 | | 11/18/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/13/2003 | | 11/14/2003 | | |
|
|
|
|
Plan resubmittals received | | | 11/14/2003 | | DONE |
|
|
|
Received two copies of revised sheets S-1.1, S-1.2, A-2.1, A-3.1, A-4.1, A-7.1, A-8.1, A-8.3, A-9.1, P-1.1, P-3.1, E-1, E-2. AHJ memo dated 11/3/03 RE: item 70, O'Rouark engineering memodated 10 Nov. 2003 RE: Electrical items. Routed to Carl W. kmm
|
Routing - PUBLIC WORKS | 11/6/2003 | | 11/13/2003 | | |
|
|
|
Failed review. Requires drainage plan revisions per Brian M. kmm
|
Routing - FIRE | 10/30/2003 | | 11/6/2003 | | |
|
|
|
Failed first review. Fd access and AS valving issues. Review faxed to architect.
|
Routing - PLAN CHECK | 10/24/2003 | | 10/30/2003 | | |
|
|
|
Failed first IBC plan review. IBC plan review started October 28, 2003 and was finished October 30, 2003. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
|
Routing - PLANNING | 10/13/2003 | | 10/24/2003 | | PASS |
|
|
|
10/20/2003 Pass Planning per CUP03-00063. Approved per DRH03-134 by TKW
|
Routing - Erosion and Sediment | 10/9/2003 | | 10/13/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 10/8/2003 | | 10/9/2003 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/6/2003 | | 10/8/2003 | | PASS |
|
|
|
Approved. Site is over 5 acres in size when two parcels are combined. Applicant requested that both parcels be combined by Ada County Assessor on 9/30/03.
|
Plans ACCEPTED BY PLAN TECH | | | 10/3/2003 | | DONE |
|
|
|
|
Application received | | | 10/2/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/2/2003 | | DONE |
|
|
|
|
Fee Review-notes | 10/2/2003 | 10/2/2003 | | | |
|
|
|
|
Routing - PLAN CHECK | 3/1/2004 | | | | |
|
|
|
Plan Mod
|