Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-02403
StatusFinaled
Name CALVARY CHAPEL OF BOISE INC
Site Address 123 S AUTO DR
Project NameCalvary Chapel
Customer Number 
ePlanReviewNo
Description
Calvery Chapel church classroom. To add 6,459 sq. ft. to an existing 4, 574 sq. ft. one story Type VB building to create new church classrooms and a new bookstore. The building will be fully fire sprinklered and have a fire alarms system installed. Other work includes all site improvements, paving and landscaping per approved plans and attachments. A limited licensed daycare will also be operating within the classroom areas and will have a seperate certificate of occupancy issued under MIS04-00002. DRH03-00134 CUP03-00063 Fire sprinklers are used for area and shall comply with NFPA 13 as regulated by the Fire Dept. 7/7/04 - Plan Modification - to add gable roofs above entry doors on east and west sides, add new covered entry on south side and delete book store and add one additional classroom and modify the non-rated corridor.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/17/2009 DONE
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 9/28/20044/26/2005 DONE
Permanent occupancy  9/28/2004 DONE
Perm. Occ. Cert. # 10310 issued 9-28-04 to Calvary Chapel for addition to classrooms.
Permanent Occupancy 9/27/20049/27/2004 DONE
Details
Code Occupancy Approval9/29/20049/27/20049/27/2004APASS
DetailsScott M.Brown
FINAL SIGNED OFF 9/29/2004 10:03:03 AM
BLD-Final9/27/20049/27/20049/27/2004PPART
DetailsLane Manuel
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
temp c of o OK.
Permanent Cof O is OK pending zoning/code enf. approval 9/27/2004 1:21:18 PM
Temporary occupancy  9/27/2004 DONE
Temp. Occ. Cert. # 45149 issued 9-27-04 to Calvary Chapel.
BLD-Final9/24/20049/24/20049/24/2004PNR
DetailsLane Manuel
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
mechanical issues to be addressed prior to bldg final 9/24/2004 4:30:17 PM
FIRE-Final Inspection9/24/20049/24/20049/24/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final9/17/20049/17/20049/17/2004PFAIL
DetailsLane Manuel
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
left c/n 9/17/2004 3:45:00 PM
Code Occupancy Approval Temp9/17/20049/17/20049/17/2004PDONE
DetailsScott M.Brown
NO CHILD CARE AUTHORIZED WITH THIS TEMP OCCUPANCY AS FENCED PLAY AREA REQUIRED.
BLD-Framing/Rough-in9/1/20049/1/20049/1/2004PPASS
DetailsLane Manuel
ceiling grid --tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need copy of architects astm change to '97 susp. ceiling standards. gave ok to cover 9/1/2004 3:43:45 PM
BLD-Framing/Rough-in8/25/20048/26/20048/26/2004APART
DetailsJim Storey
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for border tile only/firedampers void fire chalking installed/missing insulation at soffits north and south/no light wires instaled throught grid/ arch to submit astm for pods and rivets. 8/26/2004 9:30:41 AM
Case Summary (BLD)  8/26/2004 DONE
request from City Clerk for copy of permit
BLD-Other8/9/20048/9/20048/9/2004PDONE
DetailsTroy Cobbley
I issued a citation to Romar Electric/Kurtis Carlson for violation of IFC 902.1 as adopted by Boise City Municipal Code section 7-01-02 for beginning installation of the fire alarm system without approved plans.
FIRE-Conference8/6/20048/6/20048/6/2004PDONE
DetailsTroy Cobbley
I issued a stop work order for the fire alarm installation. Notice is posted on the southeast facing door
BLD-Framing/Rough-in7/16/20047/16/20047/16/2004PPASS
DetailsJim Sly
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Inspection from new approved re-submittal plans ....appears to be OK. 7/16/2004 2:59:58 PM
Override - Parcel Holds  7/16/2004  
Inspection Record Card- Bld  7/16/2004 DONE
Print Occupancy Form  7/16/2004 DONE
Print Occupancy Form  7/16/2004 DONE
Print Occupancy Form  7/16/2004  
Override - Parcel Holds  7/16/2004  
Receive PAYMENT IN FULL PRINT  7/16/2004 DONE
CHANGE STATUS TO (ISS)  7/16/2004 DONE
already issued
Plan assigned to (MLO)6/29/2004 7/15/2004 PASS
7/15/2004 10:15:43 MLO - activity updated through activity BLDA022 from case BLD03-02403.
Routing - FIRE7/13/2004 7/15/2004 PASS
plan mod. Approved subj to resubmittal of FA plans to reflect modifications for FA permit approval. AS plans approved 7/14/04 include these modificaitons. No written review comments for this mod.
PLANS/APPL TAKEN TO FRONT DESK  7/15/2004 DONE
plan modification complete
BLD-Framing/Rough-in7/13/20047/14/20047/14/2004APART
DetailsJim Sly
###-#### TIM Looked at areas for frame as approved on original approved plans ....OKd that area for cover. Still waiting for New plan resubmittal so we can inspect other areas. 14/2004 9:18:47 AM 7/14/2004 9:23:52 AM
Routing - PLANNING7/7/2004 7/13/2004 PASS
Override - Parcel Holds  7/13/2004  
Routing - PLAN CHECK6/29/2004 7/7/2004 PASS
plan modification approved.
BLD-Framing/Rough-in7/1/20047/1/20047/1/2004PFAIL
DetailsJim Sly
###-#### Tim C/N Framing insp for Misc framing corrections......Went so far to find out that Not per approved plans..... Resubmit for plan modification to PDS dept. Do Not Build Beyond original Approved Plan. 7/1/2004 1:57:29 PM
Override - Parcel Holds  7/1/2004  
BLD-Framing/Rough-in6/29/20046/29/20046/29/2004PNR
DetailsTom Arcoraci
Ken; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Plan Modification Accepted  6/29/2004 DONE
Plan Modification accepted for bld03-02403 for the deletion of bookstore & M Occupancy Group. Wall & Door changes at building corridors, creation of new classroom in bookstore space, New exterior canopy on south side of building new gables on east an dwest facades incidental architectural, structural, mechanical and electrical changes on sheets S-1.1,S-1.3,L-1.1,L-1.3,A-1.1,A-2.1,A-3.2,A-3.3,A-4.1,A-5.1,A-6.1,A-7.1,A-7.5,A-7.6,A-10.1,A-11.1,M-1.2,M-3.1,E-1,E-2,E-3. Routed to Mike Otto
BLD-Framing/Rough-in6/23/20046/23/20046/23/2004PPART
DetailsJim Sly
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Roof nailing OK. 6/23/2004 1:50:56 PM
BLD-Footing6/11/20046/11/20046/11/2004PPART
DetailsDixie Fellows
ken; Phone #: ###-#### Internet Inspection Request from: Barbara Moore inspected by MIT 6/11/2004 3:18:05 PM
BLD-Foundation5/25/20045/26/20045/26/2004APART
DetailsJim Sly
kem; Phone #: ###-#### Internet Inspection Request from: Annette Moore Pending special insp and approvals....MTI 5/26/2004 11:03:38 AM
BLD-Footing5/24/20045/24/20045/24/2004PPART
DetailsJim Sly
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Contractor wanted me to approve removal of a large section of N/S wall bordering corridor and bookstore....... Needs plan modification. If contractor continues to pour footings, Boise City will require (at a Min.) New "Stamped" Engineering for affected areas, and Special inspection of footings, wall and reinforcment. C5/24/2004 2:28:18 PM 5/24/2004 2:37:07 PM
PubWorks Occupancy Approval4/23/20044/23/20044/23/2004 DONE
Drainage project complete, signed permanent occupancy 4/23/04. M.Strasser
BLD-Aging Inspection4/20/20044/20/20044/20/2004 CANC
DetailsRuss Owen
Issue PAID IN FULL permit  1/14/2004 DONE
Inspection Record Card- Bld  1/9/2004 DONE
Print Occupancy Form  1/9/2004 DONE
Permit Ready to Issue  1/9/2004 DONE
Telephone call  1/9/2004 DONE
spoke with Wayne --- permit is ready.
Plan assigned to (MLO)10/3/2003 1/8/2004 PASS
DetailsMike Otto
1/8/2004 16:20:11 MLO - activity updated through activity BLDA022 from case BLD03-02403.
Received Certificate of Value  1/8/2004 DONE
Received revised cert. of value *Initial project value $586,660 elect. $81,200 plumb. $39,720 mech. $53,880 fire sprinkler $20,000 fire alarm systems $11,040. Routed to Mike O. and put copy in file. kmm
Case Summary (BLD)  1/8/2004  
PLANS/APPL TAKEN TO FRONT DESK  1/8/2004 DONE
Plan assigned to (MLO)10/3/2003 1/8/2004 PASS
DetailsMike Otto
1/8/2004 16:20:11 MLO - activity updated through activity BLDA022 from case BLD03-02403.
Waiting for Cert. of Value  1/6/2004 DONE
contacted Wayne Thowless for revised Certificate of value which includes fire sprinklers.
Case Summary (BLD)  1/6/2004  
Routing - FIRE12/23/2003 12/31/2003 PASS
Resubmittal acceptable. Review faxed to architect due to numerous conditions.
Routing - PLAN CHECK12/22/2003 12/23/2003 PASS
Plan resubmittals received  12/19/2003 DONE
Recived two sets of sheets C-1,S-1.1,S-1.3,L-1.1,L-1.3,A-1.1,A-2.1,A-3.2,A-6.1,A-7.4,A-7.5,A-8.2,A-10.1,M-5.1,P-2.1 with transmittal letter taken to Mike O.
Routing Off Site - C.D.H11/24/2003 12/19/2003 PASS
Plans submitted for review prior to obtaining C.D.H. approval. MLO
11/18/03 Contacted Wayne Thowless to take plans out to CDH and bring back to Plan Review after CDH approval. kmm
11/24/03 Wayne Thowless picked up plans to take out to CDH. Kmm
12-19-03 Plans back from CDH passed by Suzie Simmons
Routing - PUBLIC WORKS11/17/2003 11/18/2003 PASS
Routing - FIRE11/10/2003 11/14/2003 FAIL
Inadequate available hydrant flow capacity, FD vehicular access, and improper occupancy classification. Only partial review could be completed. Faxed to architect.
Plan resubmittals requested  11/7/2003 DONE
IBC corrections
Routing - PLAN CHECK10/24/2003 11/7/2003 FAIL
corrections sent to architect
Routing - PLUMBING10/24/2003 10/24/2003 PASS
Routing - PLANNING10/13/2003 10/24/2003 PASS
10/20/2003 Pass Planning per CUP03-00063. Approved per DRH03-134 by TKW.
Routing - Erosion and Sediment10/9/2003 10/13/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS10/8/2003 10/9/2003 FAIL
brian needs to see the plan.,
Routing - PLANNING Land Div10/6/2003 10/8/2003 PASS
Approved, site is over 5 acres in size with two parcels combined. Applicant has requested the Ada County Assessor to combine parcels on 9/30/03.
Plans ACCEPTED BY PLAN TECH  10/6/2003 DONE
Application received  10/2/2003  
Routing Off Site -Energy10/3/2003    
contacted Eric for review.