Third Notice BLD | 12/8/2005 | 12/8/2005 | 12/15/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
(F) Reprint permit | | | 12/12/2005 | | DONE |
|
|
|
|
Second Notice | | 7/13/2005 | 12/8/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/27/2005 | | DONE |
|
|
|
faxed over for final value
|
First Notice | | 6/1/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 6/1/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10613 issued 6-1-05 to Jamaca-Me-Tan.
|
Permanent Occupancy | | 5/19/2005 | 5/19/2005 | | DONE |
|
|
|
|
Code Occupancy Approval | 4/27/2005 | 4/27/2005 | 4/27/2005 | A | PASS |
Carol Montgomery
|
|
|
Finally meets compliance with DR. Signed Final - released bond. 4/27/2005 8:02:01 AM 4/27/2005 9:36:18 AM
|
PubWorks Occupancy Approval | 11/22/2004 | 11/22/2004 | 11/22/2004 | | DONE |
|
|
|
No inspections requested, received letter from B&A Engineers 11/19/04 saying they believe that the drainage windeows were constructed. Per D.Erskine, I signed occupancy 11/22/04. A.Bauman
|
BLD-Conference | 11/16/2004 | 11/22/2004 | 11/22/2004 | A | PASS |
Tony Young
|
|
|
DARRIN,, PH ###-####
temp. occ has been issued 11/22/2004 3:58:49 PM
|
Temporary occupancy | | | 11/22/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5174 issued 11-22-04 to Jamaca-Me-Tan.
|
BLD-Conference | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Tony Young
|
|
|
Darrin ###-####
working on it,,,, Cathy W. is also helping 11/16/2004 2:28:19 PM
|
BLD-Conference | 11/9/2004 | 11/9/2004 | 11/9/2004 | P | PART |
Tony Young
|
|
|
gettig paperwork 11/15/2004 10:48:37 AM getting paperwork 11/15/2004 10:48:37 AM 11/15/2004 10:49:06 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | NR |
Tony Young
|
|
|
|
BLD-Final | 3/23/2004 | 3/24/2004 | 3/24/2004 | A | PART |
Tony Young
|
|
|
darren, ph# ###-####
ok for temp. occ., pending trades,,, ALSO SEE BLD03-02407 FOR TRADES 3/24/2004 9:47:05 AM
|
FIRE-Final Inspection | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | PART |
Troy Cobbley
|
|
|
Life safety given a temporary occupancy with dave millers permission until the curbing gets painted for fire dept access 3/23/2004 8:08:53 AM
|
BLD-Final | 3/22/2004 | 3/23/2004 | 3/23/2004 | P | NR |
Tony Young
|
|
|
###-#### darrin
conf. only 3/23/2004 3:48:22 PM
|
FIRE-Final Inspection | 3/19/2004 | 3/22/2004 | 3/22/2004 | A | FAIL |
Troy Cobbley
|
|
|
Paint curbing and test duct smoke detectors 3/22/2004 1:33:13 PM
|
Print Occupancy Form | | | 3/17/2004 | | DONE |
|
|
|
|
BLD-Conference | 3/2/2004 | 3/2/2004 | 3/2/2004 | P | PASS |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ceiling grid ok 3/4/2004 2:54:07 PM
|
BLD-Conference | 2/13/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to cover all,,,, need plan change to reflect energy code on ceiling change and also adding new int. wall 2/17/2004 10:30:57 AM
|
BLD-Conference | 2/10/2004 | 2/10/2004 | 2/10/2004 | P | PART |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Annette Moore
recieved arch. letter,,, ok to cover int. walls, ok to insulate exterior walls , need 1 hr wall detail assbly. 2/11/2004 10:23:34 AM
|
Override - Parcel Holds | | | 12/18/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/18/2003 | | DONE |
|
|
|
|
CHANGE STATUS TO (R) | | | 12/8/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/2/2003 | | 12/4/2003 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/24/2003 | | 12/4/2003 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 11.19.03 to outside engineering. kmm
|
Plan assigned to (MLO) | 10/6/2003 | | 12/4/2003 | | PASS |
Mike Otto
|
|
|
12/4/2003 10:11:20 MLO - activity updated through activity BLDA022 from case BLD03-02405.
|
Plan resubmittals received | | | 12/2/2003 | | DONE |
|
|
|
Received four copies of revised sheets A3-1, A4-2, M1-1, E1-3. One copy of response letter. Routed to Mike O. kmm
|
Routing - FIRE | 12/1/2003 | | 12/1/2003 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLUMBING | 11/28/2003 | | 11/28/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 11/25/2003 | | 11/26/2003 | | PASS |
|
|
|
Approved per DRH03-7 and DRH03-7 mod #1.
|
Routing - PLAN CHECK | 11/21/2003 | | 11/24/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals received | | | 11/24/2003 | | DONE |
|
|
|
Received four copies of revised sheets P1-1. Routed to Mike O. kmm
|
Plan resubmittals requested | | | 11/24/2003 | | DONE |
|
|
|
IBC corrections
|
Routing - PUBLIC WORKS | 11/18/2003 | | 11/21/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 11/21/2003 | | 11/21/2003 | | FAIL |
|
|
|
There was a DR modification submitted for this project redesigning the parking area. See DRH03-7 Mod. #1.
|
Plan resubmittals received | | | 11/19/2003 | | DONE |
|
|
|
Received four copies of revised sheets A1-1, A1-2, A2-1, A2-2, A2-3, A2-4, A3-1, A4-1, A4-2, L1-1, M1-1, E1-1, E1-2. One copy of response letter, one copy of struct. response letter, detail D-4, response letter for Sam Rogers and one copy of DR MOD03-00007. Routed to Mike Otto. kmm
|
Plan Review Completed(1st rev) | | | 11/7/2003 | | DONE |
|
|
|
|
Routing - FIRE | 10/30/2003 | | 11/7/2003 | | FAIL |
|
|
|
Alarm discepancy on permit application. Tried to fax and e-mail architect, neither worked, left voice message for him.
|
Routing - PLAN CHECK | 10/23/2003 | | 10/30/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 10/30/2003 | | DONE |
|
|
|
IBC corrections
|
Routing - PLUMBING | 10/22/2003 | | 10/23/2003 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 10/22/2003 | | DONE |
|
|
|
Received five copies of revised sheet C1.0. One copy of O&M manual and drainage report Routed to Mike O. kmm
|
Routing - PLANNING Land Div | 10/20/2003 | | 10/21/2003 | | PASS |
|
|
|
Approved, parcel created by Warranty Deed 215 998 on March 13, 1957.
|
Routing - Erosion and Sediment | 10/16/2003 | | 10/16/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 10/16/2003 | | 10/16/2003 | | FAIL |
|
|
|
Condition 1o requires that the details for the water feature along State Street be submitted before building documents can be approved. No plans have been submitted. Darren Blaser (applicant) and Thomas Whitworth (applicant's architect) have been notified.
|
Routing - PUBLIC WORKS | 10/8/2003 | | 10/15/2003 | | FAIL |
|
|
|
requires drainage plan additions per Brian M. kmm
|
Routing - PLANNING Land Div | 10/6/2003 | | 10/7/2003 | | FAIL |
|
|
|
Need to verify legal land division. Called Tom Whitworth on 10/7/03.
|
Plans ACCEPTED BY PLAN TECH | | | 10/6/2003 | | DONE |
|
|
|
No Plumb., Mech or elect. plans
|
Plan routing begun/TENANTS | | | 10/6/2003 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/6/2003 | | 10/6/2003 | | NH |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm Engineering went with shell BLD03-02407
|
Override - Parcel Holds | | | 10/3/2003 | | |
|
|
|
|
Application received | | | 10/3/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 10/3/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/3/2003 | | |
|
|
|
|
Fee Review-notes | 10/3/2003 | 10/3/2003 | | | |
|
|
|
|